Страна: Норвегия (другие тендеры и закупки Норвегия) Организатор тендера: Trondheim kommune Номер конкурса: 41475877 Дата публикации: 05-05-2023 Сумма контракта: 24 978 255 (Российский рубль) Цена оригинальная: 4 500 000 (Норвежская крона) Источник тендера: Единая система закупок Европейского союза TED |
||
Consultant - 320133/430107 Ladebekken-Rosenborg, stage 4 Part 1
Reference number: 2021/27452Ladebekken-Rosenborg Stage 4 is the last planned stage of the overall Ladebekken-Rosenborg project, which will build an intercepting gravity sewer system from Rosenborg to Ladebekken.
Arrangements will be made for the separation of wastewater and surface water in the drainage zone, as well as relieving overflow operations in the PA 31 pumping station on Ormen Lange road. At the same time, the necessary water pipes are being replaced.
Construction for the earlier stages 1-3 have been completed.
A preliminary project for the entire Stage 4 was prepared in 2022.
Due to the size of the stage, as well as its location, we have chosen to divide Stage 4 into 2 parts.
This request concerns the detailed engineering design of Stage 4 Part 1.
Click https://permalink.mercell.com/191980215.aspx
Ladebekken-Rosenborg Stage 4 is the last planned stage of the overall Ladebekken-Rosenborg project, which will build an intercepting gravity sewer system from Rosenborg to Ladebekken.
Arrangements will be made for the separation of wastewater and surface water in the drainage zone, as well as relieving overflow operations in the PA 31 pumping station on Ormen Lange road. At the same time, the necessary water pipes are being replaced.
Construction for the earlier stages 1-3 have been completed.
A preliminary project for the entire Stage 4 was prepared in 2022.
Due to the size of the stage, as well as its location, we have chosen to divide Stage 4 into 2 parts.
This request concerns the detailed engineering design of Stage 4 Part 1.
Any extension and/or follow-up during construction may extend the duration of the contract.
Options are included.
The qualification requirements are described in the tender documentation.