Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
VDE8.11 ABS Nürnberg-Ebensfeld, IBN – Fürther Bogen mit Interimslösung
Reference number: 19FEI41549
II.1.2)Main CPV code
45234100 Railway construction works
II.1.3)Type of contract
Works
II.2)Description
II.2.1)Title:
VDE8.11 ABS Nürnberg-Ebensfeld, IBN – Fürther Bogen mit Interimslösung
II.2.3)Place of performance
NUTS code: DE253 Fürth, Kreisfreie Stadt
Main site or place of performance:
II.2.4)Description of the procurement at the time of conclusion of the
contract:
OL-Maste inkl. Gründung 330 Stück; Kettenwerk 12.710 m; OSE Kabel 3.700 m
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 23/03/2020
End: 31/12/2023
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
Title:
VDE8.11 ABS Nürnberg-Ebensfeld, IBN – Fürther Bogen mit Interimslösung
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
24/03/2020
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaire
Official name: SPL Powerlines Germany GmbH
Town: Forchheim
NUTS code: DE248 Forchheim
Country: Germany
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Total value of the procurement: 2 467 675.46 EUR
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammern des Bundes beim Bundeskartellamt
Postal address: Villemomblerstr. 76
Town: Bonn
Postal code: 52123
Country: Germany
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
Die Geltendmachung der Unwirksamkeit einer Auftragsvergabe in einem Nachprüfungsverfahren ist fristgebunden. Es wird auf die in § 135 Abs. 2 GWB genannten Fristen verwiesen. Nach
§ 135 Abs. 2 S. 2 GWB endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der
Europäischen Union. Nach Ablauf der Frist kann eine Unwirksamkeit nicht mehr festgestellt werden.
VI.5)Date of dispatch of this notice:
18/12/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
45234100 Railway construction works
VII.1.2)Additional CPV code(s)
VII.1.3)Place of performance
NUTS code: DE253 Fürth, Kreisfreie Stadt
Main site or place of performance:
VII.1.4)Description of the procurement:
OL-Maste inkl. Gründung 330 Stück; Kettenwerk 12.710 m; OSE Kabel 3.700 m
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 23/03/2020
End: 31/12/2023
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
Total value of the contract/lot/concession: 2 467 675.46 EUR
VII.1.7)Name and address of the contractor/concessionaire
Official name: SPL Powerlines Germany GmbH
Town: Forchheim
NUTS code: DE248 Forchheim
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
MKA 17 - Herstellung und Montage Schalterpodeste Mast 6-5c, 6-6d, 8-23a und 8-25a
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b)
of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Im Rahmen der Ausführung und Abnahmeprüfung wurde festgestellt, dass an den Masten 6-5c (Schalter S11 und S12), 6-6d (Schalter T24), 8-23a (Schalter 3) und 8-25a (Schalter U3) die
Bedienung der Schalterantrieben aufgrund der Örtlichkeit nichtregelkonform ist. Durch die Errichtung von zusätzlichen Schalterpodesten können die Schalter örtlich betätigt
werden. Die Erbringung dieser Leistung ist mit den hauptvertraglich geschuldeten Leistungen technisch und zeitlich eng verzahnt und muss - auch zur Sicherung von
Mangel-/Gewährleistungsansprüchen - vom bereits vor Ort tätigen Auftragnehmer mit ausgeführt werden.
VII.2.3)Increase in price
Updated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU,
average inflation in the Member State concerned)
Value excluding VAT: 2 561 468.02 EUR
Total contract value after the modifications
Value excluding VAT: 2 578 495.32 EUR