Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Bezeichnung des Auftrags: Weddeler Schleife - zweigleisiger Ausbau: VP 02.02 OLA ab km 10,55
Reference number: 21FEI51779
II.1.2)Main CPV code
45234160 Catenary"s construction works
II.1.3)Type of contract
Works
II.2)Description
II.2.2)Additional CPV code(s)
34632300 Electrical installations for railways
45234100 Railway construction works
II.2.3)Place of performance
NUTS code: DE91B Wolfenbüttel
II.2.4)Description of the procurement at the time of conclusion of the
contract:
Weddeler Schleife - zweigleisiger Ausbau: VP 02.02 Oberleitung ab km 10,55;
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Duration in days: 1
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
Title:
Weddeler Schleife - zweigleisiger Ausbau: VP 02.02 OLA ab km 10,55
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
23/07/2021
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaire
Official name: Rail Power Systems GmbH
Town: München
NUTS code: DE212 München, Kreisfreie Stadt
Country: Germany
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Total value of the procurement: 3 837 331.89 EUR
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammer des Bundes
Postal address: Villemomblerstr. 76
Town: Bonn
Postal code: 53123
Country: Germany
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
Die Geltendmachung der Unwirksamkeit einer Auftragsvergabe in einem Nachprüfungsverfahren ist fristgebunden. Es wird auf die in § 135 Abs. 2 GWB genannten Fristen verwiesen. Nach
§ 135 Abs. 2 S. 2 GWB endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der
Europäischen Union. Nach Ablauf der jeweiligen Frist kann eine Unwirksamkeit nicht mehr festgestellt werden.
VI.5)Date of dispatch of this notice:
02/05/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
45234160 Catenary"s construction works
VII.1.2)Additional CPV code(s)
34632300 Electrical installations for railways
45234100 Railway construction works
VII.1.3)Place of performance
NUTS code: DE91B Wolfenbüttel
VII.1.4)Description of the procurement:
Weddeler Schleife - zweigleisiger Ausbau: VP 02.02 Oberleitung ab km 10,55;
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Duration in days: 1
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
Total value of the contract/lot/concession: 3 837 331.89 EUR
VII.1.7)Name and address of the contractor/concessionaire
Official name: Rail Power Systems GmbH
Town: München
NUTS code: DE212 München, Kreisfreie Stadt
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
LÄA029 Zuführung Ramme für 2023
Zusätzliche An- und Abfahrten für Gründungsarbeiten und Maste stellen in 2023
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b)
of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
In der Sperrpause 2023 sollen ab Anfang Juli die weiteren Maststandorte gegründet und due Maste gestellt werden. Dafür istdie An- und Abfahrt der Gleisramme erforderlich sowie der
Einsatz der Gründungskolonne und des Baggers mit SKL-Anhängern.Ursprünglich sollten diese Gründungsarbeiten und das Maste stellen bereits in 2022 erfolgt sein. Dies war aufgrund
von parall elenArbeiten Dritter im Baufeld nicht vollständig möglich. Der Bauablauf würde durch einen weiteren AN erheblich gestört werden.Zudem käme es zu Abgrenzungsproblemen
(Gewährleistungsprobleme).
VII.2.3)Increase in price
Updated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU,
average inflation in the Member State concerned)
Value excluding VAT: 4 761 181.89 EUR
Total contract value after the modifications
Value excluding VAT: 4 886 181.89 EUR