Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
BIM ABS 36 Brenner-Nordzulauf - Erweiterter Planungsraum - Objektplanung Verkehrsanlagen, KIB, Tunnel; Lph 1+2, Option: Lph 3+4/6+7
Reference number: 20FEI49411
II.1.2)Main CPV code
71240000 Architectural, engineering and planning services
II.1.3)Type of contract
Services
II.2)Description
II.2.2)Additional CPV code(s)
71240000 Architectural, engineering and planning services
II.2.3)Place of performance
NUTS code: DE213 Rosenheim, Kreisfreie Stadt
Main site or place of performance:
II.2.4)Description of the procurement at the time of conclusion of the
contract:
Los 1: Ostermünchen - Innleiten
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 10/09/2021
End: 31/12/2025
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
Title:
Los 1: Ostermünchen - Innleiten
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
06/09/2021
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: yes
V.2.3)Name and address of the contractor/concessionaire
Official name: DB Engineering & Consulting GmbH
Town: München
NUTS code: DE212 München, Kreisfreie Stadt
Country: Germany
The contractor/concessionaire is an SME: no
V.2.3)Name and address of the contractor/concessionaire
Official name: BERNARD Gruppe ZT GmbH
Town: Hall in Tirol
NUTS code: AT335 Tiroler Unterland
Country: Austria
The contractor/concessionaire is an SME: no
V.2.3)Name and address of the contractor/concessionaire
Official name: Geoconsult ZT GmbH
Town: Puch bei Hallein
NUTS code: AT32 Salzburg
Country: Austria
The contractor/concessionaire is an SME: no
V.2.3)Name and address of the contractor/concessionaire
Official name: IGT Geotechnik und Tunnelb. ZT GmbH
Town: Salzburg
NUTS code: AT323 Salzburg und Umgebung
Country: Austria
The contractor/concessionaire is an SME: no
V.2.3)Name and address of the contractor/concessionaire
Official name: Inros Lackner SE
Town: München
NUTS code: DE212 München, Kreisfreie Stadt
Country: Germany
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammer des Bundes
Postal address: Villemomblerstr.76
Town: Bonn
Postal code: 53123
Country: Germany
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
Die Geltendmachung der Unwirksamkeit einer Auftragsvergabe in einem Nachprüfungsverfahren ist fristgebunden. Es wird auf die in § 135 Abs. 2 GWB genannten Fristen verwiesen. Nach
§ 135 Abs. 2 S. 2 GWB endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der
Europäischen Union. Nach Ablauf der jeweiligen Frist kann eine Unwirksamkeit nicht mehr festgestellt werden.
VI.5)Date of dispatch of this notice:
19/01/2024
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
71240000 Architectural, engineering and planning services
VII.1.2)Additional CPV code(s)
71240000 Architectural, engineering and planning services
VII.1.3)Place of performance
NUTS code: DE213 Rosenheim, Kreisfreie Stadt
Main site or place of performance:
VII.1.4)Description of the procurement:
Los 1: Ostermünchen - Innleiten
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 10/09/2021
End: 31/12/2025
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
VII.1.7)Name and address of the contractor/concessionaire
Official name: Ingenieurgemeinschaft ABS 36 Ostermünchen-Innleiten (INGE PA2)
Town: München
NUTS code: DE212 München, Kreisfreie Stadt
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
LÄ4
Die zwei Gleise der neuen Bahntrasse verlaufen in einem Abstand von ca. 100 m in nördlicher Lage an der Siedlung Ödenhub (Gemeinde Großkarolienenfeld) vorbei. Dabei wird die
bestehende Gemeindeverbindungsstraße gekreuzt. Hierfür ist ein Brückbauwerk (EÜ Ödenhub) erforderlich. Die Straße musste in der ursprünglichen Planung dafür abgesenkt aber
in der Lage nicht verändert werden. Zwischenzeitlich wurde auf einem benachbartem Grundstück jedoch ein Milchviehstall errichtet. In Folge dessen ist es erforderlich die bereits
erstellte Planung der Straße und der Brücke an die aktuelle Bestandssituation anzupassen. Die Straße und die Brücke müssen in der Lage nun verschoben werden.
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b)
of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Dem verhältnismäßig geringen Umplanungsaufwand, ständen beim einem Wechsel des Bearbeiters sehr große zeitliche und damit auch große Kostenaufwände gegenüber. Für die
Planungen sind umfangreiche Grundlagendermittlungen, Erhebungen von Zwangspunkten, die Einarbeitung in die Planungsstände, Abstimmungen mit Dritten und der sehr vielen
Projektbeteiligten, Ortskenntnisse, System/-Softwarezugänge, Schulungen, Prozesse etc. notwendig. Des Weiteren liegen dem AN die ursprünglichen Planunterlagen (2D, 3D, BIM)
vollständig vor.
VII.2.3)Increase in price