Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Neubau Grundschule Haidhausen
II.1.2)Main CPV code
45432130 Floor-covering work
II.1.3)Type of contract
Works
II.2)Description
II.2.2)Additional CPV code(s)
45214200 Construction work for school buildings
45210000 Building construction work
45200000 Works for complete or part construction and civil engineering work
II.2.3)Place of performance
NUTS code: DE212 München, Kreisfreie Stadt
II.2.4)Description of the procurement at the time of conclusion of the
contract:
Die Leistung umfasst ca. 2251 m² Industrieparkett Hochkantlamelle, Esche;
Ca. 81 m² Treppenstufen mit Brettsperrholz bekleiden;
Ca. 83 m² Sportbodensystem Hochkantlamelle, Esche;
Ca. 21 m² Bodenabdichtung, Beanspr.-Kl. W3-I, CM;
Ca. 21 m² Sauberlaufmatten, h= 20 mm.
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 29/03/2021
End: 12/05/2021
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
06/10/2020
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaire
Official name: SAB total-flooring GmbH
Postal address: Haunswieser Str. 39
Town: Aichach
NUTS code: DE275 Aichach-Friedberg
Postal code: 86551
Country: Germany
The contractor/concessionaire is an SME: yes
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Total value of the procurement: 195 249.05 EUR
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: VOB-Stelle der Regierung von Oberbayern
Town: München
Country: Germany
VI.5)Date of dispatch of this notice:
12/12/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
45432130 Floor-covering work
VII.1.2)Additional CPV code(s)
VII.1.3)Place of performance
NUTS code: DE212 München, Kreisfreie Stadt
VII.1.4)Description of the procurement:
Die Leistung umfasst ca. 2251 m² Industrieparkett Hochkantlamelle, Esche;
Ca. 81 m² Treppenstufen mit Brettsperrholz bekleiden;
Ca. 83 m² Sportbodensystem Hochkantlamelle, Esche;
Ca. 21 m² Bodenabdichtung, Beanspr.-Kl. W3-I, CM;
Ca. 21 m² Sauberlaufmatten, h= 20 mm.
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 29/03/2021
End: 12/05/2021
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
Total value of the contract/lot/concession: 195 249.05 EUR
VII.1.7)Name and address of the contractor/concessionaire
Official name: SAB total-flooring GmbH
Postal address: Haunswieser Straße 39
Town: Aichach
NUTS code: DE275 Aichach-Friedberg
Postal code: 86551
Country: Germany
The contractor/concessionaire is an SME: yes
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
1. Lagerkosten für 4 Monate wegen verspätetem Anfang der Arbeiten
2. Zusätzlich erforderlicher Teppich
3. Schutzmaßnahme für Innenseite der Fassade beim Verlegen/Schleifen
4. Verkleiden der Sichtseite der Stufen
5. Verklebung Sportbodenunterbau
6. Anschlussarbeiten, Aufzugkabine u. Belegung Bodendosen
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b)
of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Der Bauablauf war bereits weit fortgeschritten und das ursprünglich beauftragte Unternehmen hatte bereits beträchtliche Arbeit in die vertraglich geschuldeten Bodenbelagsarbeiten
investiert. Die Firma verfügte zusätzlich über umfangreiche Kenntnisse der komplexen Schnittstellenanforderungen. Ein Wechsel des Auftragnehmers hätte erhebliche Verzögerungen
und Qualitätsprobleme bei der Schnittstellenintegration und zusätzliche Kosten für den öffentlichen Auftraggeber verursacht.
VII.2.3)Increase in price
Updated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU,
average inflation in the Member State concerned)
Value excluding VAT: 225 070.93 EUR
Total contract value after the modifications
Value excluding VAT: 231 530.76 EUR