Compressors (Германия - Тендер #47289256) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Германия (другие тендеры и закупки Германия) Организатор тендера: Fraunhofer-Gesellschaft - Einkauf B12 Номер конкурса: 47289256 Дата публикации: 20-10-2023 Источник тендера: Единая система закупок Европейского союза TED |
||
hydrogen compressor for compressed gaseous hydrogen storage - PR409488 - 3350 -W
Reference number: PR409488 - 3350 -WPR409488 - 3350 -W hydrogen compressor for compressed gaseous hydrogen storage
Fraunhofer-Institut für Windenergiesysteme IWES
Lutherstraße 51, 02826 Görlitz
The test stand will be operated without permanent staff presence (directly at the test stand). In order to achieve the required load changes of the tube storage (cyclic loading and unloading of the tubes with hydrogen), it is currently assumed that the test stand must be operated for 24 hours -> please note: Noise or measures to reduce noise emissions from the compressor are important and to be taken into account! The installation site is classified as an industrial area. According to TA Noise, a maximum of 70 dB (A) is permitted.
The compressor system as a pressure source must be intrinsically safe.
Data generated by the compressor (e.g. pressure curves, cycles, error messages, warnings, media levels, etc.) should be readable. Ideally, it can be tapped and integrated into the control and data acquisition of the test stand process technology.
The test stand itself will be located on an outdoor area. The compressor must also be installed outside. Required weather protection (sun, rain, frost) for the compressor must be taken into account if necessary.
Directlink to documents with Selection criteria: (URL) https://vergabe.fraunhofer.de/NetServer/SelectionCriteria/54321-Tender-18b3d77d81a-5c1ecbcd2a3c8026
Directlink to documents with Selection criteria: (URL) https://vergabe.fraunhofer.de/NetServer/SelectionCriteria/54321-Tender-18b3d77d81a-5c1ecbcd2a3c8026
Directlink to documents with Selection criteria: (URL) https://vergabe.fraunhofer.de/NetServer/SelectionCriteria/54321-Tender-18b3d77d81a-5c1ecbcd2a3c8026
In the event that subcontractors are used, they must be named and their suitability is likewise to be substantiated on the basis of the listed documents under III.1). Furthermore, it must be confirmed that they will be available if the order is placed; their share in the scope of the contractual object must be stated.
not applicable
not applicable
Applications for review are not permitted if more than 15 calendar days have passed since receipt of notification from the contracting authority that it is unwilling to redress an objection (section 160 (3) sentence 1 no. 4 of the German Competition Act (Gesetz gegen Wettbewerbsbeschränkungen, GWB)). Additionally, applications for review are not permitted if an award has been made before the public procurement tribunal has informed the contracting authority about the application for review (sections 168 (2) sentence 1 and 169 (1) GWB). Contracts may be awarded 15 calendar days after the tenderer information pursuant to section 134 (1) GWB has been sent. If the information is sent electronically or by fax, the period shall be reduced to ten calendar days (section 134 (2) GWB). The period shall begin on the day after which the contracting authority sends the information; the date of receipt by the tenderer and candidate in question shall be irrelevant. The admissibility of a review application also requires that the applicant notified the contracting authority about the claimed violations of public procurement provisions within ten calendar days of becoming aware of them (section 160 (3) sentence 1 no. 1 GWB). Violations of public procurement provisions which become apparent from the tender notice must be notified to the contracting authority by the end of the time limit for the application or the submission of a tender specified in the notice (section 160 (3) sentence 1 no. 2 GWB). Violations of public procurement provisions which only become apparent from the procurement documents must be notified to the contracting authority by the end of the time limit for the application or the submission of a tender (section 160 (3) sentence 1 no. 3 GWB).
Applications for review are not permitted if more than 15 calendar days have passed since receipt of notification from the contracting authority that it is unwilling to redress an objection (section 160 (3) sentence 1 no. 4 of the German Competition Act (Gesetz gegen Wettbewerbsbeschränkungen, GWB)). Additionally, applications for review are not permitted if an award has been made before the public procurement tribunal has informed the contracting authority about the application for review (sections 168 (2) sentence 1 and 169 (1) GWB). Contracts may be awarded 15 calendar days after the tenderer information pursuant to section 134 (1) GWB has been sent. If the information is sent electronically or by fax, the period shall be reduced to ten calendar days (section 134 (2) GWB). The period shall begin on the day after which the contracting authority sends the information; the date of receipt by the tenderer and candidate in question shall be irrelevant. The admissibility of a review application also requires that the applicant notified the contracting authority about the claimed violations of public procurement provisions within ten calendar days of becoming aware of them (section 160 (3) sentence 1 no. 1 GWB). Violations of public procurement provisions which become apparent from the tender notice must be notified to the contracting authority by the end of the time limit for the application or the submission of a tender specified in the notice (section 160 (3) sentence 1 no. 2 GWB). Violations of public procurement provisions which only become apparent from the procurement documents must be notified to the contracting authority by the end of the time limit for the application or the submission of a tender (section 160 (3) sentence 1 no. 3 GWB).
Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V.