Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Empfangsgebäude Hauptbahnhof Stuttgart; Bonatzbau; Planung; HLSKE, LPH 4-6
Reference number: 21FEI56380
II.1.2)Main CPV code
71320000 Engineering design services
II.1.3)Type of contract
Services
II.2)Description
II.2.2)Additional CPV code(s)
71320000 Engineering design services
II.2.3)Place of performance
NUTS code: DE111 Stuttgart, Stadtkreis
II.2.4)Description of the procurement at the time of conclusion of the
contract:
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 07/01/2022
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: yes
Identification of the project:
G.011.607048 G.011.000962
Section V: Award of contract/concession
Title:
Empfangsgebäude Hauptbahnhof Stuttgart; Bonatzbau; Planung; HLSKE, LPH 4-6
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
20/09/2022
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaire
Official name: Drees & Sommer SE
Town: Stuttgart
NUTS code: DE11 Stuttgart
Postal code: 70569
Country: Germany
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammer des Bundes
Postal address: Villemomblerstr. 76
Town: Bonn
Postal code: 53123
Country: Germany
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
Die Geltendmachung der Unwirksamkeit einer Auftragsvergabe in einem Nachprüfungsverfahren ist fristgebunden. Es wird auf die in § 135 Abs. 2 GWB genannten Fristen verwiesen. Nach
§ 135 Abs. 2 S. 2 GWB endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der
Europäischen Union. Nach Ablauf der jeweiligen Frist kann eine Unwirksamkeit nicht mehr festgestellt werden.
VI.5)Date of dispatch of this notice:
25/09/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
71320000 Engineering design services
VII.1.2)Additional CPV code(s)
71320000 Engineering design services
VII.1.3)Place of performance
NUTS code: DE111 Stuttgart, Stadtkreis
Main site or place of performance:
Empfangsgebäude Hauptbahnhof Stuttgart; Bonatzbau; Planung; HLSKE, LPH 4-6
VII.1.4)Description of the procurement:
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 07/01/2022
In the case of framework agreements, provide justification for any duration exceeding 8 years:
Empfangsgebäude Hauptbahnhof Stuttgart; Bonatzbau; Planung; HLSKE, LPH 4-6
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
VII.1.7)Name and address of the contractor/concessionaire
Official name: Drees & Sommer SE
Town: Stuttgart
NUTS code: DE11 Stuttgart
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
AvL0041 Es wurden zusätzlich notwendige Leistungen im Planungsverlauf identifiziert, die nicht durch das vorhandene Leistungsbild abgedeckt sind.
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b)
of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Die vertragliche Einigung hat die notwendigen Leistungen des Hauptauftrages nicht umfasst, so dass dieses ergänzt werden muss.
VII.2.3)Increase in price