Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
BIM - Daglfinger und Tuderinger Kurve - Objekt- und Tragwerksplanung Ingenieurbauwerke Lph 1+2, 3+4 (Optional 4-7)
Reference number: 18FEI31145
II.1.2)Main CPV code
71000000 Architectural, construction, engineering and inspection services
II.1.3)Type of contract
Services
II.2)Description
II.2.2)Additional CPV code(s)
71000000 Architectural, construction, engineering and inspection services
71240000 Architectural, engineering and planning services
71327000 Load-bearing structure design services
II.2.3)Place of performance
NUTS code: DE21 Oberbayern
II.2.4)Description of the procurement at the time of conclusion of the
contract:
Bf Riem - Objekt- und Tragwerksplanung IBW Lph 3+4
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 21/05/2018
End: 30/06/2022
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
18/05/2018
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaire
Official name: ILF Consulting Engineers Austria GmbH
Postal address: Feldkreuzstraße 3
Town: Rum bei Innsbruck
NUTS code: AT332 Innsbruck
Postal code: 6063
Country: Austria
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Total value of the procurement: 323 001.00 EUR
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammer des Bundes
Postal address: Villemomblerstr. 76
Town: Bonn
Postal code: 53123
Country: Germany
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
Die Geltendmachung der Unwirksamkeit einer Auftragsvergabe in einem Nachprüfungsverfahren ist fristgebunden. Es wird auf die in § 135 Abs. 2 GWB genannten Fristen verwiesen. Nach
§ 135 Abs. 2 S. 2 GWB endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der
Europäischen Union. Nach Ablauf der jeweiligen Frist kann eine Unwirksamkeit nicht mehr festgestellt werden.
VI.5)Date of dispatch of this notice:
22/09/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
71000000 Architectural, construction, engineering and inspection services
VII.1.2)Additional CPV code(s)
71000000 Architectural, construction, engineering and inspection services
71240000 Architectural, engineering and planning services
71327000 Load-bearing structure design services
VII.1.3)Place of performance
NUTS code: DE21 Oberbayern
Main site or place of performance:
VII.1.4)Description of the procurement:
Bf Riem - Objekt- und Tragwerksplanung IBW Lph 3+4
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 21/05/2018
End: 30/06/2022
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
Total value of the contract/lot/concession: 307 893.08 EUR
VII.1.7)Name and address of the contractor/concessionaire
Official name: ILF Consulting Engineers Austria GmbH
Postal address: Feldkreuzstraße 3
Town: Rum bei Innsbruck
NUTS code: AT332 Innsbruck
Country: Austria
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
Objekt-/Tragwerksplanung für Ingenieurbauwerk (KIB) BW 19 (EÜ Fuß- und Radweg km 6545
Bahnhofstraße) des Bahnhof Riem Los 3, LPH 3 und 4 (OP + TWP).
LÄ24
VII.2.2)Reasons for modification
Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee (Art. 43(1)(c) of Directive 2014/23/EU, Art. 72(1)(c) of Directive
2014/24/EU, Art. 89(1)(c) of Directive 2014/25/EU)
Description of the circumstances which rendered the modification necessary and explanation of the unforeseen nature of these circumstances:
Die Planung musste aufgrund von Erfordernissen der Deutschlandtaktmaßnahme angepasst werden, wodurch sich aufgrund
der Durchbindung der DK und TK in die zwei südlichsten Gleise (Gleis 21 und 22) diese sich weiter nach Süden verschieben.
Dadurch muss das Bauwerk EÜ Bahnhofstr./Erdinger Straße nicht nur, wie ursprünglich vorgesehen nördlich teilerneuert,
sondern auch südlich erneuert werden.
Zudem kommt der Wunsch der LHM einer barrierefreien und damit verlängerten Ausführung der Rampe (6% statt 8%), sowie
eine Aufweitung des Rahmens auf eine lichte Weite von 6,75m, statt wie im Bestand 4,0 m und einer lichten Höhe von 3,0 m
statt wie im Bestand 2,67 m. Hierdurch resultiert die Kompletterneuerung des Bauwerkes statt der ursprünglich vorgesehenen
Teilerneuerung die eine Neuplanung erfordert.
VII.2.3)Increase in price
Updated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU,
average inflation in the Member State concerned)
Value excluding VAT: 1 433 318.69 EUR
Total contract value after the modifications
Value excluding VAT: 1 741 211.77 EUR