Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
DB Regio Bus Mitte GmbH: Busbetriebshof Industriepark Ffm. Höchst: Los 01 Tiefbau und Verkehrsflächen; Los 02 Rohbau- / Betonarbeiten; Los 03 Hallen- und Stahlbau; Los 04
Elektroinstallation; Los 05 HLS Heizung- und Sanitärarbeiten
Reference number: 22FEI58457
II.1.2)Main CPV code
45221250 Underground work other than tunnels, shafts and subways
II.1.3)Type of contract
Works
II.2)Description
II.2.2)Additional CPV code(s)
45221250 Underground work other than tunnels, shafts and subways
II.2.3)Place of performance
NUTS code: DE712 Frankfurt am Main, Kreisfreie Stadt
II.2.4)Description of the procurement at the time of conclusion of the
contract:
Los 03 Hallen- und Stahlbau
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 14/06/2022
End: 15/03/2023
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
Contract No: 22FEI58457 _92312222_NT203
Title:
Los 03 Hallen- und Stahlbau
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
13/06/2022
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaire
Official name: Bauunternehmung Albert Weil AG
Town: Limburg
NUTS code: DE723 Limburg-Weilburg
Country: Germany
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammer des Bundes
Postal address: Villemomblerstr. 76
Town: Bonn
Postal code: 53123
Country: Germany
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
Die Geltendmachung der Unwirksamkeit einer Auftragsvergabe in einem Nachprüfungsverfahren ist fristgebunden. Es wird auf die in § 135 Abs. 2 GWB genannten Fristen verwiesen. Nach
§ 135 Abs. 2 S. 2 GWB endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der
Europäischen Union. Nach Ablauf der jeweiligen Frist kann eine Unwirksamkeit nicht mehr festgestellt werden.
VI.5)Date of dispatch of this notice:
23/08/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
45221250 Underground work other than tunnels, shafts and subways
VII.1.2)Additional CPV code(s)
45221250 Underground work other than tunnels, shafts and subways
VII.1.3)Place of performance
NUTS code: DE712 Frankfurt am Main, Kreisfreie Stadt
Main site or place of performance:
VII.1.4)Description of the procurement:
Los 03 Hallen- und Stahlbau
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 14/06/2022
End: 15/03/2023
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
VII.1.7)Name and address of the contractor/concessionaire
Official name: Bauunternehmung Albert Weil AG
Town: Limburg
NUTS code: DE723 Limburg-Weilburg
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
Nachtrag 203: Abdeckung Sockel in Waschhalle nach geänderter Sockelausführung, Schutzblech für Leerrohre für die Vorbereitung zusätzlich PKW Ladesäulen, Stahlblech am
Brandplatz brandgefährdete E-Busse wurde als Überlaufschutz von Brandschützer bei Abnahme für Fertigstellungsmeldung gefordert.
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b)
of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
zusätzliche Leistungen --Diese Nachtragsleistung steht in unmittelbaren Zusammenhang mit dem Hauptauftrag sowohl in der zeitlichen Abfolge der Baumaßnahmen als auch örtliche
Gesamtbaumaßnahme.
Die Abdeckung des Sockels in der Waschhalle ist technisch erforderlich durch geänderte Sockelausführung nach Anraten der Fachfirma. Pos. 05.03.20 - Das Blech ist eine
Schutzmaßnahme für die verlegten Lehrrohre im Bereich der PKW Stellplätze. Pos. 05.03.30 - 40 Vorgabe Brandschützer bei Abnahmebegehung.
VII.2.3)Increase in price