Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Tunnel Rastatt / NBS Bashaide – Rastatt Süd
Reference number: 17FEI27890
II.1.2)Main CPV code
45234160 Catenary"s construction works
II.1.3)Type of contract
Works
II.2)Description
II.2.2)Additional CPV code(s)
45234160 Catenary"s construction works
II.2.3)Place of performance
NUTS code: DE124 Rastatt
II.2.4)Description of the procurement at the time of conclusion of the
contract:
Tunnel Rastatt / NBS Bashaide - Rastatt Süd, Oberleitungsarbeiten
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 01/08/2021
End: 30/09/2025
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
Title:
Tunnel Rastatt / NBS Bashaide – Rastatt Süd
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
22/12/2017
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaire
Official name: Rail Power Systems GmbH
Town: Ettlingen
NUTS code: DE123 Karlsruhe, Landkreis
Country: Germany
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Total value of the procurement: 15 565 370.31 EUR
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammer des Bundes
Postal address: Villemomblerstr. 76
Town: Bonn
Postal code: 53123
Country: Germany
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
Die Geltendmachung der Unwirksamkeit einer Auftragsvergabe in einem Nachprüfungsverfahren ist fristgebunden. Es wird auf die in § 135 Abs. 2 GWB genannten Fristen verwiesen. Nach
§ 135 Abs. 2 S. 2 GWB endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der
Europäischen Union. Nach Ablauf der jeweiligen Frist kann eine Unwirksamkeit nicht mehr festgestellt werden.
VI.5)Date of dispatch of this notice:
23/06/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
45234160 Catenary"s construction works
VII.1.2)Additional CPV code(s)
45234160 Catenary"s construction works
VII.1.3)Place of performance
NUTS code: DE123 Karlsruhe, Landkreis
Main site or place of performance:
Tunnel Rastatt / NBS Bashaide – Rastatt Süd
VII.1.4)Description of the procurement:
Tunnel Rastatt / NBS Bashaide - Rastatt Süd, Oberleitungsarbeiten
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 01/08/2018
End: 30/09/2025
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
Total value of the contract/lot/concession: 1.00 EUR
VII.1.7)Name and address of the contractor/concessionaire
Official name: Rail Power Systems GmbH
Town: Ettlingen
NUTS code: DE123 Karlsruhe, Landkreis
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
LÄA 36 Erdung 110kV Freileitung aufgrund von änderung Bautechnologie für Jochmontage R101-9p/R101-10p aufgrund zu geringer
Abstände zwischen Baumaßnahme und Freileitung.
VII.2.2)Reasons for modification
Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee (Art. 43(1)(c) of Directive 2014/23/EU, Art. 72(1)(c) of Directive
2014/24/EU, Art. 89(1)(c) of Directive 2014/25/EU)
Description of the circumstances which rendered the modification necessary and explanation of the unforeseen nature of these circumstances:
Im Rahmen der Detailplanung des Bauablaufs für die Montage der Oberleitungsjoche wurde im Rahmen der Abstimmung mit
dem Freileitungsbetreiber DB Energie festgestellt, dass die Abstände sehr gering sind. Dementsprechend ist eine Montage ohne eine Abschaltung der Freileitung nicht möglich.
Für die Montage des Jochs R101-9p/R101-10p musste daher die 110kV Freileitung der DB Energie ausgeschaltet und geerdet werden.
VII.2.3)Increase in price
Updated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU,
average inflation in the Member State concerned)
Value excluding VAT: 19 386 516.42 EUR
Total contract value after the modifications
Value excluding VAT: 19 407 696.55 EUR