Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
WKSP_ESTW Rüsselsheim, Kabeltiefbau
Reference number: 22FEI61604
II.1.2)Main CPV code
45314300 Installation of cable infrastructure
II.1.3)Type of contract
Works
II.2)Description
II.2.2)Additional CPV code(s)
45314300 Installation of cable infrastructure
II.2.3)Place of performance
NUTS code: DE717 Groß-Gerau
Main site or place of performance:
II.2.4)Description of the procurement at the time of conclusion of the
contract:
WKSP_ESTW Rüsselsheim, Kabeltiefbau
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 15/02/2023
End: 31/12/2026
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
Contract No: 22FEI61604_92320120_MKA001
Title:
WKSP_ESTW Rüsselsheim, Kabeltiefbau
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
24/01/2023
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaire
Official name: LEONHARD WEISS GmbH & Co. KG
Postal address: Leonhard-Weiss-Straße 22
Town: Göppingen
NUTS code: DE114 Göppingen
Postal code: 73037
Country: Germany
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Total value of the procurement: 7 767 463.05 EUR
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammer des Bundes
Postal address: Villemomblerstr. 76
Town: Bonn
Postal code: 53123
Country: Germany
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
Die Geltendmachung der Unwirksamkeit einer Auftragsvergabe in einem Nachprüfungsverfahren ist fristgebunden. Es wird auf die in § 135 Abs. 2 GWB genannten Fristen verwiesen. Nach
§ 135 Abs. 2 S. 2 GWB endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der
Europäischen Union. Nach Ablauf der jeweiligen Frist kann eine Unwirksamkeit nicht mehr festgestellt werden.
VI.5)Date of dispatch of this notice:
21/06/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
45314300 Installation of cable infrastructure
VII.1.2)Additional CPV code(s)
45314300 Installation of cable infrastructure
VII.1.3)Place of performance
NUTS code: DE717 Groß-Gerau
Main site or place of performance:
VII.1.4)Description of the procurement:
WKSP_ESTW Rüsselsheim, Kabeltiefbau
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 15/02/2023
End: 31/12/2026
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
Total value of the contract/lot/concession: 50 081.26 EUR
VII.1.7)Name and address of the contractor/concessionaire
Official name: LEONHARD WEISS GmbH & Co. KG
Postal address: Leonhard-Weiss-Straße 22
Town: Göppingen
NUTS code: DE114 Göppingen
Postal code: 73037
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
MKA001: Der Nachtrag 01 beinhaltet die erforderliche und nicht vorgesehene Leistung der Lieferung von 2 Kabeltrommel, die nicht im Hauptvertrag vertraglich vereintbart waren und
dienen zur Sicherstellung des Bahnbetriebs.
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b)
of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Ein Wechsel des AN würde erheblichen Mehraufwand und Verzögerungen im Leistungsablauf verursachen. Ein neuer Planer müsste sich erst in die vorhandenen komplexen Unterlagen und
in den Sachstand einarbeiten, dann die Lücken feststellen und bearbeiten. Dabei könnte nicht ausgeschlossen werden, dass dann wieder Widersprüche oder Lücken auftreten. Dies
stellt eine doppelte Bearbeitung dar, die sowohl zeitlich als auch finanziell nachteilig wäre.
VII.2.3)Increase in price
Updated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU,
average inflation in the Member State concerned)
Value excluding VAT: 7 767 463.05 EUR
Total contract value after the modifications
Value excluding VAT: 7 817 544.31 EUR