Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Bauüberwachungsleistungen EÜ Kestert II, Strecke 3507
Reference number: 22FEI57868
II.1.2)Main CPV code
71300000 Engineering services
II.1.3)Type of contract
Services
II.2)Description
II.2.2)Additional CPV code(s)
71300000 Engineering services
II.2.3)Place of performance
NUTS code: DEB1A Rhein-Lahn-Kreis
II.2.4)Description of the procurement at the time of conclusion of the
contract:
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 13/07/2022
End: 31/12/2023
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
Contract No: 22FEI57868_92312952_NT01
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
11/07/2022
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaire
Official name: BPB Büro für Planung und Bauüberwachung im Verkehrswesen GmbH
Postal address: Hohenzollernstraße 18
Town: Koblenz
NUTS code: DEB11 Koblenz, Kreisfreie Stadt
Postal code: 56068
Country: Germany
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Total value of the procurement: 71 094.00 EUR
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammer des Bundes
Postal address: Villemomblerstr. 76
Town: Bonn
Postal code: 53123
Country: Germany
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
Die Geltendmachung der Unwirksamkeit einer Auftragsvergabe in einem Nachprüfungsverfahren ist fristgebunden. Es wird auf die in § 135 Abs. 2 GWB genannten Fristen verwiesen. Nach
§ 135 Abs. 2 S. 2 GWB endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der
Europäischen Union. Nach Ablauf der jeweiligen Frist kann eine Unwirksamkeit nicht mehr festgestellt werden.
VI.5)Date of dispatch of this notice:
07/06/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
71300000 Engineering services
VII.1.2)Additional CPV code(s)
71300000 Engineering services
VII.1.3)Place of performance
NUTS code: DEB1A Rhein-Lahn-Kreis
Main site or place of performance:
VII.1.4)Description of the procurement:
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 13/07/2022
End: 31/12/2023
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
Total value of the contract/lot/concession: 4 692.00 EUR
VII.1.7)Name and address of the contractor/concessionaire
Official name: BPB Büro für Planung und Bauüberwachung im Verkehrswesen GmbH
Postal address: Hohenzollernstraße 18
Town: Koblenz
NUTS code: DEB11 Koblenz, Kreisfreie Stadt
Postal code: 56068
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
Nachtrag 01: Gegenüber dem Hauptvertrag müssen die vertraglich vereinbarten Leistungen in einer zusätzliche Sperrpause (nächtliche TSP vom 09.06.2023 bis 12.06.2023, jeweils von
22 Uhr bis 6 Uhr, inklusive Vorab-Abstimmungen mit BzS, Betra-Notiz, etc.) übernommen werden.
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b)
of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Durch den IBV wurde im Zuge der Inbetriebnahme eine zusätzliche Schotterhalterung angeordnet. Die Schotterhalterung muss kurzfristig in einer zusätzlichen Sperrpause eingebaut
werden. Die Arbeiten werden kurzfristig im Schatten einer anderen Sperrpause durchgeführt.
VII.2.3)Increase in price
Updated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU,
average inflation in the Member State concerned)
Value excluding VAT: 71 094.00 EUR
Total contract value after the modifications
Value excluding VAT: 75 786.00 EUR