Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
A9 Pyhrn Autobahn, GESB Edlach – Gaishorn, Hauptbaumaßnahmen km 81,500 bis km 90,000 beide RFB
Reference number: 0
II.1.2)Main CPV code
45000000 Construction work
II.1.3)Type of contract
Works
II.2)Description
II.2.1)Title:
Hauptbaumaßnahmen km 81,500 bis km 90,000 beide RFB
II.2.3)Place of performance
NUTS code: AT22 Steiermark
II.2.4)Description of the procurement at the time of conclusion of the
contract:
Hauptbaumaßnahmen km 81,500 bis km 90,000 beide RFB
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 11/04/2022
End: 19/07/2024
In the case of framework agreements, provide justification for any duration exceeding 4 years:
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
14/12/2021
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaire
Official name: Porr Bau GmbH
Town: Wien
NUTS code: AT13 Wien
Postal code: 1100
Country: Austria
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Total value of the procurement: 59 051 016.65 EUR
Section VI: Complementary information
VI.3)Additional information:
Nationale Erkennungsnummer: [L-919481-3a10]
VI.4)Procedures for review
VI.4.1)Review body
Official name: Bundesverwaltungsgericht
Postal address: Erdbergstraße 192 - 196
Town: Wien
Country: Austria
Telephone: +43 160149-0
VI.4.4)Service from which information about the review procedure may be
obtained
Official name: Bundesverwaltungsgericht
Postal address: Erdbergstraße 192 - 196
Town: Wien
Postal code: 1030
Country: Austria
E-mail:
einlaufstelle@bvwg.gv.at
Telephone: +43 160149-0
VI.5)Date of dispatch of this notice:
10/10/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
45000000 Construction work
VII.1.2)Additional CPV code(s)
VII.1.3)Place of performance
NUTS code: AT22 Steiermark
Main site or place of performance:
Edlach - Gaishorn, Steiermark
VII.1.4)Description of the procurement:
Die Höhe der Einlaufschächte und die erforderliche Abdichtung wurden imBereich T11 und T11a an die tatsächliche Höhensituation angepasst.
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 11/04/2022
End: 19/07/2024
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
Total value of the contract/lot/concession: 8 662.32 EUR
VII.1.7)Name and address of the contractor/concessionaire
Official name: Porr Bau GmbH
Town: Wien
NUTS code: AT13 Wien
Postal code: 11
Country: Austria
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
Die Höhe der Einlaufschächte und die erforderliche Abdichtung wurden imBereich T11 und T11a an die tatsächliche Höhensituation angepasst.
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b)
of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Ein Wechsel des Auftragnehmers ist aus technischen und wirtschaftlichen Gründen nicht möglich, da die gegenständliche Vertragsänderung in einem engen wirtschaftlichen bzw.
technischen Zusammenhang mit dem ursprünglichen Auftrag steht. Zudem würde ein Wechsel des Auftragnehmers für den Auftraggeber zu erheblichen Schwierigkeiten in der
Auftragsabwicklung führen, da eine zeitliche Unterbrechung des Auftrages die termingerechte Realisierung des Projektes gefährden und auch unzählige Schnittstellenprobleme
aufwerfen würde. In weiterer Folge wäre der Auftraggeber auch mit beachtlichen Zusatzkosten aufgrund von Einarbeitungen, Vorbereitungsmaßnahmen, unvermeidbare Parallelbearbeitung
bzw. allfälligen Stehzeiten konfrontiert.
VII.2.3)Increase in price
Updated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU,
average inflation in the Member State concerned)
Value excluding VAT: 61 749 157.35 EUR
Total contract value after the modifications
Value excluding VAT: 61 757 819.67 EUR