Description
?.## INSTRUCTIONS TO QUOTERS SITE VISIT Quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local
conditions that may affect the cost and/or the contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute
grounds for a claim after contract award. The site visits will be conducted on a mutually agreeable date as requested. QUOTE SUBMISSION Quoters shall submit their quote via email to
Serina Black at Serina.Black1@va.gov by 11:00 AM, EST, June 14th, 2024. Quotes shall be assembled by the following Sections; each section shall be easily identified. Section A - Quote
Form (Standard Form 1449) Signed and dated, include the North American Industry Classification System (NAICS) code and small business size standard in Block 10. Data Universal Numbering
System (DUNS) Number shall be entered in the block with the Quoters name and address. Section B Pricing Pricing shall be submitted as requested in the Schedule of Services. Total price
will be evaluated by the Government. Proposed price should reflect a clear understanding of the requirements and is consistent with the various elements of the quote. Section C Quoters
Representations and Certifications A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the
quoter shall complete electronically). A quoter shall complete only paragraph (b) of this provision if the quoter has completed the annual representations and certifications
electronically at www.sam.gov/portal/public/SAM/. All Quoters shall be registered and current in the System for Award Management (SAM) database at time of award. Section D
Technical/Management Approach Quoters shall submit a quote that addresses all aspects of the Statement of Work (SOW). Quoter must have experience, capability, and willingness to commit
the resources necessary to plan, organize, and execute tasks in an expeditious and efficient manner. The project manager and lead site survey personnel shall have at least 10 years of
fire protection engineering work experience with demonstrated experience with health care occupancies. A fire protection engineer shall conduct the actual on-site surveys and supervise
any other onsite survey personnel. Proposed personnel shall demonstrate that they have previously acted as the lead role in fire protection and engineering design and life safety
assessment projects involving all aspects of fire protection and life safety, including code compliant designs. Personnel shall also demonstrate a thorough working knowledge and formal
training in fire protection codes and standards, especially the latest edition of NFPA 101 Life Safety Code and NFPA 99 Health Care Facilities Code. The quoter shall identify any
subcontractors proposed under this solicitation. All technical elements applicable to the utilization of subcontractors must be addressed in the technical quote and detail provided. The
technical quote should be as detailed as necessary to fully explain the proposed methods and rationale; it should reflect a clear understanding of the nature of the work being undertaken.
The technical quote shall include information on how the project is to be organized, staffed, and managed. The Technical Volume shall not exceed twenty-five (25) pages in length (minimum
12-point font and no less than ½ inch margins). Page limitation includes any drawings, charts, images, etc., and excludes section dividers, table of contents, glossary of terms,
cross-referencing indices, and resumes. If more than 25 pages (not counting excluded pages) are submitted, only the first 25 pages will be considered. Section E Past Performance Identify
all federal, state, and local government contracts as well as any private/commercial contracts of similar scope, size, complexity that are ongoing or have been completed within the last
three years. List the following information for each contract: Company Name and Address Description of Services Performed Name, Telephone Number and Email Address of Responsible
individuals who have first-hand knowledge of performance relative to similar type of services Dates of Contract Performance Contract Type (e.g. fixed-price, cost reimbursable) and total
contract value Failure to submit a complete proposal may result in an unacceptable determination. 3.0 AWARD BASIS The Government will select the quote that represents the best benefit to
the Government at a price that can be determined reasonable. The Government will evaluate technical capabilities, past performance, and price. Following receipt of quotes, the Government
will perform an evaluation using a comparative analysis of the services quoted in accordance with FAR 13.106-2(b)(3). The Government will compare quotes to one another to select the
service that best benefits the Government by fulfilling the requirement. The evaluation of Government requirements outlined in this request for quote will determine suitability.
Contractors may submit more than one quote; however, contractors are strongly encouraged to submit their best technical solutions and prices in response to this request for quote. Once
the Government determines there is/are a contractor(s) that can provide a service that meet(s) the requirements of this request for quote, the Government reserves the right to communicate
with only those contractors quoting the best-suited service to address any remaining issues. Factor 1: Technical/Management Approach The evaluation process will consider whether the quote
demonstrates a clear understanding of the technical features involved in meeting the requirements of the solicitation. Factor 2: Past Performance Past performance information will be
utilized to determine the quality of the contractor s past performance as it relates to the probability of success of the required effort. The Government will evaluate customer
satisfaction, responsiveness to customer needs, and past demonstration of meeting delivery schedules and the delivery of quality services. Emphasis will be on recent, relevant past
performance in the previous 3 years. Recent is defined as work performed within the last three years. Relevant is defined as work similar in size and scope of the work described in the
Performance Work Statement (PWS). Past performance information is one indicator of a quoter s ability to perform the contract successfully. Current and relevant information, source of
information, context of data, and general trends in Contractor s performance shall be considered as it pertains to the performance of work described in this solicitation. Quoters may
provide information on problems encountered on identified contracts and the quoter s corrective action. The Government shall consider this information as well as information obtained from
any other sources when evaluating the quoter s past performance. Since the Government may not necessarily interview all of the sources provided by the quoters, it is incumbent upon the
quoter to explain the relevance of the data provided. Quoters are reminded that the Government may elect to consider data obtained from other sources. Quoters with no relevant past
performance or whom information is not available, shall not be evaluated favorably or unfavorably on past performance, but may be considered less favorably than a quoter with favorable
performance history. Factor 3: Price Prices shall be submitted in accordance with the Price Schedule contained in the Solicitation. Total price will be evaluated by the Government. In
evaluating the quoter s proposed price for this project, the Government concern includes determining price reasonableness. Reasonableness determinations will be made by determining if
competition exists, by comparing proposed cost/price with established commercial prices, other contract vehicles, and/or by comparing proposed cost/price with the Independent Government
Cost Estimate (IGCE). The IGCE is not releasable to the public. 4.0 TECHNICAL QUESTIONS Quoters should submit all technical questions regarding this solicitation to the Contracting
Officer in writing, via email, to Serina Black at Serina.Black1@va.gov on or before 11:00 AM, EST, June 7th, 2024. Address Subject Line: Boiler Repair | Salisbury VAMC Telephonic (verbal)
questions Will Not be addressed. All responses to questions, which may affect quotes, will be incorporated into a written amendment to the Request for Quote.