Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork (Великобритания (Англия, Шотландия, Уэльс) - Тендер #41141498) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Великобритания (Англия, Шотландия, Уэльс) (другие тендеры и закупки Великобритания (Англия, Шотландия, Уэльс)) Организатор тендера: University of Ulster Номер конкурса: 41141498 Дата публикации: 26-04-2023 Сумма контракта: 53 701 700 (Российский рубль) Цена оригинальная: 800 000 (Фунт стерлингов) Источник тендера: Единая система закупок Европейского союза TED |
||
Design Build Operate Contract for FASTER Project in Northern Ireland
Reference number: project_27535Design Build Operate Contract for FASTER Project in Northern Ireland
Design Build and Operate EV Chargers at or near sites across Northern Ireland. Sites outlined in Procurement Documents
Design Build and Operate EV Chargers at or near the sites below:-
1. Bangor Sportsplex, Old Belfast Road, Bangor, BT19 1LU
2. Londonderry Park, Portaferry Road, Newtownards, BT23 8SG
3. Banbridge Leisure Centre, 15 Downshire Pl, Banbridge, BT32 3JY
4. South Lake Leisure Centre, 1 Lake Rd, Craigavon, BT64 1AS
5. Cultural Heritage Service Library, 39c Abbey Street, Armagh, BT61 7EB
6. Foyle Arena, Limavady Rd, Londonderry, BT47 6JY
7.Queens Quay Car Park, 25 Queens Quay, Derry, Londonderry BT48 6DL
8. The Oasis Plaza, Market Street, Omagh BT78 1EE
9. Bawnacre Centre, Castle St, Irvinestown, Enniskillen, BT94 1EE
10. The Ardhowen, 97 Dublin Road, Derrychara, Enniskillen, Co Fermanagh, BT74 6FZ
11. ECOS Centre Car Park, Kernohans Lane, Ballymena, BT43 7QA
12. Larne Leisure Centre, 28 Tower Road, Larne, BT40 1AB
13. Amphitheatre Wellness Centre, Prince William Way, Carrickfergus, BT38 7HP
14. Dungannon Leisure Centre, Circular Rd, Dungannon, BT71 6BH
15. Maghera Leisure Centre, 48a Coleraine Road, Maghera, BT46 5BN
16. Cookstown Leisure Centre, 78 Fountain Rd, Cookstown, BT80 8QF
17. Kilkeel Leisure Centre, Mourne Esplanade, Kilkeel, County Down, BT34 4DB
18. Newcastle Visitor Information Centre, 10-14 Central Promenade, Newcastle, BT33 0AA
19. Bagenal"s Castle, Abbey Way, Newry, BT34 2BY
20. Belvoir Activity Centre, 100 Belvoir Drive, Belfast, County Antrim BT8 7DT
21. Ballysillan Leisure Centre, Ballysillan Road, Belfast, BT14 7QP
22. Girdwood Community Hub, 10 Girdwood Avenue, Belfast, BT14 6EG
The University, as the Client for the design and build phase of the Project, is seeking a suitably qualified and experienced Economic Operator to design, construct and install up to 22, 50 kW rapid chargers (or equivalent output) for public use before handing over to the Councils, as the Clients on the operational phase. The programme for the charger installation must be agreed with the University. Once the Economic Operator has started on an agreed series of installations these must be completed prior to the next series beginning. A Sub-meter must be installed at each site and the sites left commissioned and fully functional before moving to the next series of installations. Design and Build Phase 132 days between 19 July 2023 and 30 November 2023. Operational Phase a minimum of 7 Years with the possibility of a 3 year extension with agreement of both parties.
Faster Project. A project supported by the European Union"s INTERREG VA Programme, managed by the special EU Programmes Body (SEUPB)
The University will incorporate a standstill period at the point information on the award of the contract is communicated to tenderers. The standstill period, which will be for a minimum of 10 calendar days, provides time for unsuccessful tenderers to challenge the award decision before the contract is entered into. The Public Contracts Regulations 2015 (as amended) provide for aggrieved parties who have been harmed or are at risk of harm by a breach of the rules to take action in the High Court (Northern Ireland).
The University will incorporate a standstill period at the point information on the award of the contract is communicated to tenderers. The standstill period, which will be for a minimum of 10 calendar days, provides time for unsuccessful tenderers to challenge the award decision before the contract is entered into. The Public Contracts Regulations 2015 (as amended) provide for aggrieved parties who have been harmed or are at risk of harm by a breach of the rules to take action in the High Court (Northern Ireland).