Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Oberleitungserweiterung Unterwerk Burgweinting Str. 5500 und 5830
Reference number: 22FEI59034
II.1.2)Main CPV code
45234160 Catenary"s construction works
II.1.3)Type of contract
Works
II.2)Description
II.2.1)Title:
Oberleitungserweiterung Unterwerk Burgweinting Str. 5500 und 5830
II.2.3)Place of performance
NUTS code: DE232 Regensburg, Kreisfreie Stadt
Main site or place of performance:
II.2.4)Description of the procurement at the time of conclusion of the
contract:
Oberleitungserweiterung Unterwerk Burgweinting Str. 5500 und 5830
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 17/11/2022
End: 29/03/2024
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
Title:
Oberleitungserweiterung Unterwerk Burgweinting Str. 5500 und 5830
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
17/11/2022
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaire
Official name: Rail Power Systems GmbH
Postal address: Garmischer Straße 35
Town: München
NUTS code: DE212 München, Kreisfreie Stadt
Postal code: 81373
Country: Germany
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Total value of the procurement: 2 977 204.04 EUR
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammern des Bundes beim Bundeskartellamt
Postal address: Villemomblerstr. 76
Town: Bonn
Postal code: 52123
Country: Germany
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
Die Geltendmachung der Unwirksamkeit einer Auftragsvergabe in einem Nachprüfungsverfahren ist fristgebunden. Es wird auf die in § 135 Abs. 2 GWB genannten Fristen verwiesen. Nach
§ 135 Abs. 2 S. 2 GWB endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der
Europäischen Union. Nach Ablauf der Frist kann eine Unwirksamkeit nicht mehr festgestellt werden.
VI.5)Date of dispatch of this notice:
15/12/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
45234160 Catenary"s construction works
VII.1.2)Additional CPV code(s)
VII.1.3)Place of performance
NUTS code: DE212 München, Kreisfreie Stadt
Main site or place of performance:
VII.1.4)Description of the procurement:
Oberleitungserweiterung Unterwerk Burgweinting Str. 5500 und 5830
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 17/11/2022
End: 29/03/2024
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
Total value of the contract/lot/concession: 2 977 204.04 EUR
VII.1.7)Name and address of the contractor/concessionaire
Official name: STRABAG Rail Fahrleitungen GmbH
Postal address: Marzahner Straße 34
Town: Berlin
NUTS code: DE30 Berlin
Postal code: 13053
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
2 - Stillstandkosten Kabeltiefbau
VII.2.2)Reasons for modification
Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee (Art. 43(1)(c) of Directive 2014/23/EU, Art. 72(1)(c) of Directive
2014/24/EU, Art. 89(1)(c) of Directive 2014/25/EU)
Description of the circumstances which rendered the modification necessary and explanation of the unforeseen nature of these circumstances:
Aufgrund einer zeitlichen Anpassung(Verschiebung) des Bauablaufs war das Vorhalten von zusätzlichen Maschinen und Personal des NU des AN nötig. Eine Anpassung des Bauablaufs war
trotz Sorgfalt des AG nicht vorhersehbar, da trotz frühzeitiger Ausschreibung die Schlüsselressourcen Bauüberwachung und Kampfmittelsondierung nicht rechtzeitig vor Baubeginn
eingebunden werden konnten
VII.2.3)Increase in price
Updated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU,
average inflation in the Member State concerned)
Value excluding VAT: 3 194 716.04 EUR
Total contract value after the modifications
Value excluding VAT: 3 442 915.04 EUR