Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Aachen Rothe Erde PFA 2 Bautechnik Los 2.1
Reference number: 18FEI35048
II.1.2)Main CPV code
45221110 Bridge construction work
II.1.3)Type of contract
Works
II.2)Description
II.2.3)Place of performance
NUTS code: DEA2D Städteregion Aachen
Main site or place of performance:
II.2.4)Description of the procurement at the time of conclusion of the
contract:
Oberbau, Gleisverlängerung von ca 1700m (inkl. Erd- und Tiefbau), Anpassung Kreuzungsbauwerk,
Böschungssicherung, Neubau Lärmschutzwände, Koordinierte Kabeltrasse
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 22/01/2018
End: 28/02/2021
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
21/01/2019
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaire
Official name: Hering Bau GmbH
Postal address: Postfach 624
Town: Burbach
NUTS code: DEA5A Siegen-Wittgenstein
Postal code: 57295
Country: Germany
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Total value of the procurement: 16 310 318.70 EUR
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammer des Bundes
Postal address: Villemomblerstr. 76
Town: Bonn
Postal code: 53123
Country: Germany
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
Genaue Angaben zu den Fristen für die Einlegung von Rechtsbehelfen:
Die Geltendmachung der Unwirksamkeit einer Auftragsvergabe in einem Nachprüfungsverfahren ist fristgebunden. Es wird auf die in § 135 Abs. 2 GWB genannten Fristen verwiesen. Nach
§ 135 Abs. 2 S. 2 GWB endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der
Europäischen Union. Nach Ablauf der jeweiligen Frist kann eine Unwirksamkeit nicht mehr festgestellt werden.
VI.5)Date of dispatch of this notice:
27/11/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
45221110 Bridge construction work
VII.1.2)Additional CPV code(s)
VII.1.3)Place of performance
NUTS code: DEA23 Köln, Kreisfreie Stadt
Main site or place of performance:
VII.1.4)Description of the procurement:
Oberbau, Gleisverlängerung von ca 1700m (inkl. Erd- und Tiefbau), Anpassung Kreuzungsbauwerk,
Böschungssicherung, Neubau Lärmschutzwände, Koordinierte Kabeltrasse
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 22/01/2018
End: 28/02/2021
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
Total value of the contract/lot/concession: 16 310 318.70 EUR
VII.1.7)Name and address of the contractor/concessionaire
Official name: Hering Bau GmbH
Postal address: Postfach 624
Town: Burbach
NUTS code: DEA5A Siegen-Wittgenstein
Postal code: 57295
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
Einbau Schichten im Bereich der zurückgebauten Rampen
(MKA 202_84)
VII.2.2)Reasons for modification
Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee (Art. 43(1)(c) of Directive 2014/23/EU, Art. 72(1)(c) of Directive
2014/24/EU, Art. 89(1)(c) of Directive 2014/25/EU)
Description of the circumstances which rendered the modification necessary and explanation of the unforeseen nature of these circumstances:
Diese MKA steht im Zusammenhang mit dem MKA 192, der den folgenden Sachverhalt beinhaltet. Um den Antransport für zusätzliche Maßnahmen wie Gründung SSW und Versickerbecken zu
gewährleisten, erfolgt die Anfahrt über die BE-Fläche Zehnthofweg über das Erdplanum für das zukünftige Gleis 113. Damit der erforderliche Antransport der Baustoffe und
Baumaterialien gewährleistet werden kann und die Anfahrt über das Erdplanum möglich ist, war es zwingend erforderlich auf dem Erdplanum in km 66,1; km 66,5 und km 66,8 Rampen
anzubringen. Im Anschluss ist es notwendig, nach Beendigung der oben genannten Maßnahmne, diese Rampen wieder auszubauen, damit die Schichten für das Planum des neuen Gleises
erstellt werden können. Zum Einbau der Schichten PSS, FSS und Schotter-Verlegeplanum im Bereich der Rampen musste der Rückbau der Rampen abgewartet werden. Dieser erfolgte erst
nach Fertigstellung der oben genannten Maßnahmen. Anschließend mussten mit erhöhtem Aufwand im Bereich der Rampen kleinteilig di
VII.2.3)Increase in price
Updated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU,
average inflation in the Member State concerned)
Value excluding VAT: 26 634 603.95 EUR
Total contract value after the modifications
Value excluding VAT: 26 640 603.95 EUR