Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
S6 erste Baustufe, 4 - gleisiger Ausbau Frankfurt (M) West - Bad Vilbel, Vergabepaket 5 Hauptbaumaßnahme Oberleitungsanlagen Los 1 und Los 2
Reference number: 19FEI40397
II.1.2)Main CPV code
45234160 Catenary"s construction works
II.1.3)Type of contract
Works
II.2)Description
II.2.2)Additional CPV code(s)
45234160 Catenary"s construction works
II.2.3)Place of performance
NUTS code: DE71E Wetteraukreis
II.2.4)Description of the procurement at the time of conclusion of the
contract:
Oberleitungsarbeiten km 190,100 - 195,8002
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 19/09/2019
End: 31/12/2024
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
Contract No: 19FEI40397_92275870_NT18
Title:
Los 2 - OLA Hauptbaumaßnahme, km 190,100 - 195,800
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
19/09/2019
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaire
Official name: Rail Power Systems GmbH
Postal address: Garmischer Straße 35
Town: München
NUTS code: DE212 München, Kreisfreie Stadt
Postal code: 81373
Country: Germany
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammer des Bundes
Postal address: Villemomblerstr. 76
Town: Bonn
Postal code: 53123
Country: Germany
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
Die Geltendmachung der Unwirksamkeit einer Auftragsvergabe in einem Nachprüfungsverfahren ist fristgebunden. Es wird auf die in § 135 Abs. 2 GWB genannten Fristen verwiesen. Nach
§ 135 Abs. 2 S. 2 GWB endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der
Europäischen Union. Nach Ablauf der jeweiligen Frist kann eine Unwirksamkeit nicht mehr festgestellt werden.
VI.5)Date of dispatch of this notice:
22/09/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
45234160 Catenary"s construction works
VII.1.2)Additional CPV code(s)
45234160 Catenary"s construction works
VII.1.3)Place of performance
NUTS code: DE71E Wetteraukreis
Main site or place of performance:
VII.1.4)Description of the procurement:
Oberleitungsarbeiten km 190,100 - 195,8002
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 19/09/2019
End: 31/12/2024
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
VII.1.7)Name and address of the contractor/concessionaire
Official name: Rail Power Systems GmbH
Postal address: Garmischer Straße 35
Town: München
NUTS code: DE212 München, Kreisfreie Stadt
Postal code: 81373
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
NA018_L2 RPS Terminsichernde Maßnahmen IBN Fernbahn links
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b)
of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Aufgrund des fehlenden Gleises bzw. Gleisanschlusses für das fernbahnlinke Gleis können die Oberleitungsarbeiten (z.B Kettenwerkszug) nicht wie geplant ausgeführt werden. Durch
die verzögerte Bereitstellung des Gleises, fehlt die benötigte Zeit für die Durchführung der Oberleitungsarbeiten. Um die Inbetriebnahme am 16.08.2021 einhalten zu können, muss
für die Realisierung der Oberleitungsarbeiten mehr Personal und Geräte zur Verfügung gestellt werden.
VII.2.3)Increase in price