Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Fassadenarbeiten Alu-PR und Metallrahmentüren
Reference number: 2016HBA011_11
II.1.2)Main CPV code
45443000 Facade work
II.1.3)Type of contract
Works
II.2)Description
II.2.2)Additional CPV code(s)
44221200 Doors
44221220 Fire doors
45421131 Installation of doors
II.2.3)Place of performance
NUTS code: DE272 Kaufbeuren, Kreisfreie Stadt
II.2.4)Description of the procurement at the time of conclusion of the
contract:
Aluminium Pfosten-Riegel Elemente ca. 100 m2
Rahmentüren als Feuerschutzanlagen 4 Stck.
Türtechnik, Beschläge für 8 Türen
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 25/01/2021
End: 18/07/2021
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
Contract No: 2016HBA011_11
Title:
Fassadenarbeiten Alu-PR und Metallrahmentüren
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
22/12/2020
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaire
Official name: Pletschacher Holzbau GmbH
Town: Dasing
NUTS code: DE275 Aichach-Friedberg
Country: Germany
The contractor/concessionaire is an SME: yes
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Total value of the procurement: 123 048.00 EUR
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammer Südbayern
Town: München
Country: Germany
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
"Gem. § 168 Abs. 2 Satz 1 GWB kann ein wirksam erteilter Zuschlag nicht aufgehoben werden. Eine Unwirksamkeit des Zuschlags kann gem. § 135 Abs. 2 GWB nur innerhalb von 30
Kalendertagen nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der Europäischen Union in einem Nachprüfungsverfahren geltend gemacht werden. Im Übrigen
wird auf die Auftragsbekanntmachung verwiesen."
VI.4.4)Service from which information about the review procedure may be
obtained
Official name: Vergabekammer Südbayern
Town: München
Country: Germany
VI.5)Date of dispatch of this notice:
22/09/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
45443000 Facade work
VII.1.2)Additional CPV code(s)
44221200 Doors
44221220 Fire doors
45421131 Installation of doors
VII.1.3)Place of performance
NUTS code: DE272 Kaufbeuren, Kreisfreie Stadt
VII.1.4)Description of the procurement:
Aluminium Pfosten-Riegel Elemente ca. 100 m2
Rahmentüren als Feuerschutzanlagen 4 Stck.
Türtechnik, Beschläge für 8 Türen
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 25/01/2021
End: 18/07/2021
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
Total value of the contract/lot/concession: 123 048.00 EUR
VII.1.7)Name and address of the contractor/concessionaire
Official name: Pletschacher Holzbau GmbH
Town: Dasing
NUTS code: DE275 Aichach-Friedberg
Country: Germany
The contractor/concessionaire is an SME: yes
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
Nachtrag Südfassade Pausenhalle
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b)
of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Auf Grund sowohl wirtschaftlicher als auch technischer Gründe wurden diese Nachträge vergeben. Sämtliche Nachträge wurden vom Architekten wirtschaftlich und technisch geprüft
und sind mittels Änderungsantrag nachgewiesen.
Ein wesentlicher Gesichtspunkt für die Auftragsvergabe war hier auch das Bestreben, den zeitlichen Bauablauf nicht zu gefährden.
VII.2.3)Increase in price
Updated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU,
average inflation in the Member State concerned)
Value excluding VAT: 123 048.00 EUR
Total contract value after the modifications
Value excluding VAT: 148 106.02 EUR