Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
DSTW Mainz, Planungsleistungen zu LOS 1: Leit- und Sicherungstechnik und Telekommunikation (LST und TK) LOS 2: elektrische Energieanlagen und Oberleitungsanlagen (EEA und OLA)
Reference number: 20FEI44203
II.1.2)Main CPV code
71240000 Architectural, engineering and planning services
II.1.3)Type of contract
Services
II.2)Description
II.2.2)Additional CPV code(s)
71240000 Architectural, engineering and planning services
II.2.3)Place of performance
NUTS code: DE712 Frankfurt am Main, Kreisfreie Stadt
II.2.4)Description of the procurement at the time of conclusion of the
contract:
Planungsleistungen für Leit- und Sicherungstechnik und Telekommunikation
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 09/11/2020
End: 31/08/2021
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
Contract No: 20FEI44203_92290242_NT56
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
09/11/2020
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaire
Official name: DB Engineering & Consulting GmbH, Region Deutschland Mitte, Planung Frankfurt am Main / Saarbrücken
Postal address: Hahnstr. 52
Town: Frankfurt am Main
NUTS code: DE712 Frankfurt am Main, Kreisfreie Stadt
Postal code: 60528
Country: Germany
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammer des Bundes
Postal address: Villemomblerstr. 76
Town: Bonn
Postal code: 53123
Country: Germany
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
Die Geltendmachung der Unwirksamkeit einer Auftragsvergabe in einem Nachprüfungsverfahren ist fristgebunden. Es wird auf die in § 135 Abs. 2 GWB genannten Fristen verwiesen. Nach
§ 135 Abs. 2 S. 2 GWB endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der
Europäischen Union. Nach Ablauf der jeweiligen Frist kann eine Unwirksamkeit nicht mehr festgestellt werden.
VI.5)Date of dispatch of this notice:
31/08/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
71240000 Architectural, engineering and planning services
VII.1.2)Additional CPV code(s)
71240000 Architectural, engineering and planning services
VII.1.3)Place of performance
NUTS code: DE712 Frankfurt am Main, Kreisfreie Stadt
Main site or place of performance:
VII.1.4)Description of the procurement:
Planungsleistungen für Leit- und Sicherungstechnik und Telekommunikation
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 09/11/2020
End: 31/08/2021
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
VII.1.7)Name and address of the contractor/concessionaire
Official name: DB Engineering & Consulting GmbH, Region Deutschland Mitte, Planung Frankfurt am Main / Saarbrücken
Postal address: Hahnstr. 52
Town: Frankfurt am Main
NUTS code: DE712 Frankfurt am Main, Kreisfreie Stadt
Postal code: 60528
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
Nachtrag 56: Der Nachtrag 56 beinhaltet die zusätzliche Fachplanung der Objekte der fehlende Nachbarstellwerke, die für den Projektbereich erforderlich sind. Hierzu wird eine
Planung im Gewerk TK in den Leistungsphasen 1-7 notwendig.
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b)
of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Ein Wechsel des AN würde erheblichen Mehraufwand und Verzögerungen im Leistungsablauf verursachen. Ein neuer Planer müsste sich erst in die vorhandenen komplexen Unterlagen und
in den Sachstand einarbeiten, dann die Lücken feststellen und bearbeiten. Dabei könnte nicht ausgeschlossen werden, dass dann wieder Widersprüche oder Lücken auftreten. Dies
stellt eine doppelte Bearbeitung dar, die sowohl zeitlich als auch finanziell nachteilig wäre.
VII.2.3)Increase in price