Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Frankfurt/Main Hbf, Umstrukturierung Nordbau und B-Ebene, Planungsleistungen Lph 5 - 6 und optional Lph 7
Reference number: 14TEI09642
II.1.2)Main CPV code
71200000 Architectural and related services
II.1.3)Type of contract
Services
II.2)Description
II.2.2)Additional CPV code(s)
71240000 Architectural, engineering and planning services
II.2.3)Place of performance
NUTS code: DE712 Frankfurt am Main, Kreisfreie Stadt
II.2.4)Description of the procurement at the time of conclusion of the
contract:
Frankfurt/Main Hbf, Umstrukturierung Nordbau und B-Ebene, Planungsleistungen Lph 5 - 6 und optional Lph 7
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 01/08/2014
End: 30/04/2019
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
Contract No: 14TEI09642_92219060_NT47
Title:
Frankfurt/Main Hbf, Umstrukturierung Nordbau und B-Ebene, Planungsleistungen Lph 5 - 6 und optional Lph 7
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
29/07/2014
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaire
Official name: BIEGE FTG mbH + Schmidt & Pütz GmbH
Postal address: Stühlinger Straße 15
Town: Berlin
NUTS code: DE300 Berlin
Postal code: 10318
Country: Germany
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Total value of the procurement: 5 581 357.23 EUR
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammer des Bundes
Postal address: Villemomblerstr. 76
Town: Bonn
Postal code: 53123
Country: Germany
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
Die Geltendmachung der Unwirksamkeit einer Auftragsvergabe in einem Nachprüfungsverfahren ist fristgebunden. Es wird auf die in § 135 Abs. 2 GWB genannten Fristen verwiesen. Nach
§ 135 Abs. 2 S. 2 GWB endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der
Europäischen Union. Nach Ablauf der jeweiligen Frist kann eine Unwirksamkeit nicht mehr festgestellt werden.
VI.5)Date of dispatch of this notice:
21/06/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
71200000 Architectural and related services
VII.1.2)Additional CPV code(s)
71240000 Architectural, engineering and planning services
VII.1.3)Place of performance
NUTS code: DE712 Frankfurt am Main, Kreisfreie Stadt
Main site or place of performance:
VII.1.4)Description of the procurement:
Frankfurt/Main Hbf, Umstrukturierung Nordbau und B-Ebene, Planungsleistungen Lph 5 - 6 und optional Lph 7
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 01/08/2014
End: 30/04/2019
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
Total value of the contract/lot/concession: 97 428.54 EUR
VII.1.7)Name and address of the contractor/concessionaire
Official name: BIEGE FTG mbH + Schmidt & Pütz GmbH
Postal address: Stühlinger Straße 15
Town: Berlin
NUTS code: DE300 Berlin
Postal code: 10318
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
NT47: Einfluss der Planungsänderung auf den derzeitigen gesamten Planungsstand
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b)
of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Art und Umfang der Änderungen (mit Angabe möglicher früherer Vertragsänderungen):
Durchführung einer Machbarkeitsstudie hinsichtlich der Umsetzung o.g.
Planungsänderungen sowie den Einfluss der möglichen Planungsänderungen auf
den aktuellen Planungsstand.
Die Umsetzbarkeit folgender Umplanungen geprüft werden:
• Umplanung 2.OG/DG - Gastronomie und Co-Working (Anstatt Büro)
• Umplanung 1.OG -Entfall Verbindung EG/1.OG, Büro statt Retailflächen
• Umplanung EG - Änderung Querbahnsteig, Entfall Verbindung EG/1.OG
• Umplanung KG - Änderung Querbahnsteig, Sozialraumpools in
Nordbau, Nordkopf entfällt
VII.2.3)Increase in price
Updated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU,
average inflation in the Member State concerned)
Value excluding VAT: 15 948 985.93 EUR
Total contract value after the modifications
Value excluding VAT: 16 046 414.47 EUR