Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Projektsteuerungsleistungen für den Umbau VST in Hessen in 8 Losen
Reference number: 21FEI50389
II.1.2)Main CPV code
71300000 Engineering services
II.1.3)Type of contract
Services
II.2)Description
II.2.2)Additional CPV code(s)
71300000 Engineering services
II.2.3)Place of performance
NUTS code: DE722 Lahn-Dill-Kreis
Main site or place of performance:
Verkehrsstation Dillenburg
II.2.4)Description of the procurement at the time of conclusion of the
contract:
Los 8 Projektsteuerung VST Dillenburg
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 23/09/2021
End: 30/06/2030
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
Contract No: 20FEI50389_92303060_NT05
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
15/10/2021
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaire
Official name: Ingenieurbüro Moser
Postal address: Prenzlauer Promenade 18
Town: Berlin
NUTS code: DE30 Berlin
Postal code: 13086
Country: Germany
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammer des Bundes
Postal address: Villemomblerstr. 76
Town: Bonn
Postal code: 53123
Country: Germany
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
Die Geltendmachung der Unwirksamkeit einer Auftragsvergabe in einem Nachprüfungsverfahren ist fristgebunden. Es wird auf die in § 135 Abs. 2 GWB genannten Fristen verwiesen. Nach
§ 135 Abs. 2 S. 2 GWB endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der
Europäischen Union. Nach Ablauf der jeweiligen Frist kann eine Unwirksamkeit nicht mehr festgestellt werden.
VI.5)Date of dispatch of this notice:
19/06/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
71300000 Engineering services
VII.1.2)Additional CPV code(s)
71300000 Engineering services
VII.1.3)Place of performance
NUTS code: DE722 Lahn-Dill-Kreis
Main site or place of performance:
Verkehrsstation Dillenburg
VII.1.4)Description of the procurement:
Los 8 Projektsteuerung VST Dillenburg
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 23/09/2021
End: 30/06/2030
In the case of framework agreements, provide justification for any duration exceeding 8 years:
Los 8 Projektsteuerungsleistungen für den Umbau VST in Hessen
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
VII.1.7)Name and address of the contractor/concessionaire
Official name: Ingenieurbüro Moser
Postal address: Prenzlauer Promenade 18
Town: Berlin
NUTS code: DE300 Berlin
Postal code: 13086
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
NT05: Der Nachtrag umfasst Mehrleistungen mit zusätzlichem Personalaufwand bezogen auf die folgenden Bereiche: - Nicht angekreuzte Leistungen der Leistungsstufe 1, Bereiche A und E
- Nicht beauftragte Ausschreibung Planungsleistungen; alle erbrachten Leistungen zur AU BIM-Planung
- Zusätzliche Besprechungen aufgrund der Terminverlängerung der Leistungsstufe 1 erforderlichen zusätzlichen Besprechungen, Berichtswesen, CRM etc.
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b)
of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Aufgrund der zum Zeitpunkt des Vertragsschlusses nicht bekannten Themen ist es zu einem erheblichen Mehraufwand in den beschriebenen Leistungsbereichen der Projektsteuerung
gekommen. Aus Besprechungen wurden zusätzliche Überarbeitungen notwendig, die aufbereitet, mit der TPL besprochen und vorgestellt werden müssen.
VII.2.3)Increase in price