Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
ABS 38 Tüßling-Freilassing PA03: Baugrunderkundungen (Erkundungsfeinkonzept, Vergabe der Bohr- und Erkundungsleistungen, Bohrbegleitung, geotechnische Gutachten)
Reference number: 19FEI37912
II.1.2)Main CPV code
71240000 Architectural, engineering and planning services
II.1.3)Type of contract
Services
II.2)Description
II.2.2)Additional CPV code(s)
45111250 Ground investigation work
II.2.3)Place of performance
NUTS code: DE214 Altötting
Main site or place of performance:
II.2.4)Description of the procurement at the time of conclusion of the
contract:
Baugrunderkundungen ABS 38, PA03 Tüßling – Freilassing
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 13/09/2019
End: 27/04/2021
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
Title:
Los 3.4: Strecke 5723 km 39,776 - 49,460
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
03/09/2019
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaire
Official name: GTU Ingenieurgesellschaft mbH
Postal address: Sahlkamp 149
Town: Hannover
NUTS code: DE92 Hannover
Postal code: 30179
Country: Germany
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammer des Bundes
Postal address: Villemomblerstr. 76
Town: Bonn
Postal code: 53123
Country: Germany
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
Die Geltendmachung der Unwirksamkeit einer Auftragsvergabe in einem Nachprüfungsverfahren ist fristgebunden. Es wird auf die in § 135 Abs. 2 GWB genannten Fristen verwiesen. Nach
§ 135 Abs. 2 S. 2 GWB endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der
Europäischen Union. Nach Ablauf der jeweiligen Frist kann eine Unwirksamkeit nicht mehr festgestellt werden.
VI.5)Date of dispatch of this notice:
20/06/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
45111250 Ground investigation work
VII.1.2)Additional CPV code(s)
45111250 Ground investigation work
VII.1.3)Place of performance
NUTS code: DE214 Altötting
Main site or place of performance:
VII.1.4)Description of the procurement:
Baugrunderkundungen ABS 38, PA03 Tüßling – Freilassing
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 13/09/2019
End: 27/04/2021
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
VII.1.7)Name and address of the contractor/concessionaire
Official name: GTU Ingenieurgesellschaft mbH
Town: Hannover
NUTS code: DE92 Hannover
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
NA83 - Für 7 Bauwerke des PFA 3.4 ist ein geotechnisches Erkundungskonzept, die Koordinierung der Baugrunderkundungen,
geotechnische Laboruntersuchungen, sowie die Erstellung/Anpassung der geotechnischen Gutachten inkl. zeichnerischer
Darstellung erforderlich.
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b)
of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Im Rahmen der Baugrundgutachtenerstellung während der EP wurde festgestellt, dass für 7 Bauwerke des PFA 3.4 neben
den vorhandenen Baugrundaufschlüssen zusätzlich noch Großbohrungen notwendig werden, da die bisherigen Aufschlüsse nicht
tief genug sind und damit keine ausreichenden Daten für eine Bemessung der Bauwerksgründung liefern. Aus diesem Grund
müssen Nacherkundungen im Bereich der 7 Bauwerke durchgeführt werden, wodurch eine Beauftragung der in 2.1 genannten
Leistungen notwendig wird.
VII.2.3)Increase in price