Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
20FEI45125 BIM Sachsenmagistrale, Restmaßnahmen, Teil Dresden Hbf – Freital Ost
Reference number: 20FEI45125
II.1.2)Main CPV code
71240000 Architectural, engineering and planning services
II.1.3)Type of contract
Services
II.2)Description
II.2.1)Title:
BIM Sachsenmagistrale, Restmaßnahmen, Teil Dresden Hbf – Freital Ost
II.2.3)Place of performance
NUTS code: DED21 Dresden, Kreisfreie Stadt
Main site or place of performance:
II.2.4)Description of the procurement at the time of conclusion of the
contract:
Leistungen gemäß II.1.4 mit folgenden Leistungsbildern:
— Objektplanung Verkehrsanlagen;
— Objektplanung Ingenieurbauwerke;
— Ingenieurbauwerke Tragwerksplanung;
— Technische Streckenausrüstung;
— Technische Ausrüstung.
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 29/09/2020
End: 31/12/2032
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
Title:
BIM Sachsenmagistrale, Restmaßnahmen, Teil Dresden Hbf – Freital Ost Referenznummer der Bekanntmachung: 20FEI45125
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
28/09/2020
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: yes
V.2.3)Name and address of the contractor/concessionaire
Official name: ARGE BIM SFM – Schüßler-Plan Frankfurt
Town: Frankfurt
NUTS code: DE712 Frankfurt am Main, Kreisfreie Stadt
Country: Germany
The contractor/concessionaire is an SME: no
V.2.3)Name and address of the contractor/concessionaire
Official name: Obermeyer Planen + Beraten GmbH
Town: Dresden
NUTS code: DED21 Dresden, Kreisfreie Stadt
Country: Germany
The contractor/concessionaire is an SME: yes
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammer des Bundes
Postal address: Villemomblerstr. 76
Town: Bonn
Postal code: 53123
Country: Germany
VI.5)Date of dispatch of this notice:
19/06/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
71240000 Architectural, engineering and planning services
VII.1.2)Additional CPV code(s)
VII.1.3)Place of performance
NUTS code: DEE03 Magdeburg, Kreisfreie Stadt
Main site or place of performance:
VII.1.4)Description of the procurement:
BIM Sachsenmagistrale, Restmaßnahmen, Teil Dresden Hbf – Freital Ost
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 29/09/2020
End: 31/12/2032
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
VII.1.7)Name and address of the contractor/concessionaire
Official name: ARGE BIM SFM – Schüßler-Plan Frankfurt
Town: Frankfurt
NUTS code: DE712 Frankfurt am Main, Kreisfreie Stadt
Country: Germany
The contractor/concessionaire is an SME: yes
VII.1.7)Name and address of the contractor/concessionaire
Official name: Obermeyer Planen + Beraten GmbH
Town: Dresden
NUTS code: DED21 Dresden, Kreisfreie Stadt
Country: Germany
The contractor/concessionaire is an SME: yes
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
Grobstudie "HOA-Stellgleis und Behandlungsgleis im Bf Tharandt"
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b)
of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Ein Wechsel des AN ist nicht möglich, da die zusätzlichen Planungsinhalte unmittelbar in die beauftragten Planungsteilewirken (u.a. Gradiente, Gleislage, technische Ausrüstung
und VA) und damit zu ständigen Wechselwirkung in der Planung führen.Eine Trennung von Planungen einzelner Gewerke würde zu erheblichen Schwierigkeiten bei der Findung
einergenehmigungsfähigen, richtlinienkonformen gesamtwirtschaftlichen Variante führen und die weiterführende Planung ab Lph 3 undsomit den geplanten Baubeginn verzögern.
Verantwortlichkeiten bei Mängelansprüchen im Schnittstellenbereich ließen sich nichtmehr zweifelsfrei zuordnen.
VII.2.3)Increase in price