Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
ABS/NBS Karlsruhe - Basel Abschnitt 9, Bf Müllheim
Reference number: 20FEI49285
II.1.2)Main CPV code
45311200 Electrical fitting work
II.1.3)Type of contract
Works
II.2)Description
II.2.2)Additional CPV code(s)
34944000 Points heating system
45315100 Electrical engineering installation works
II.2.3)Place of performance
NUTS code: DE132 Breisgau-Hochschwarzwald
Main site or place of performance:
II.2.4)Description of the procurement at the time of conclusion of the
contract:
Bf Müllheim, Neubau Stromversorgung + 4 elektrische Weichenheizanlagen
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 15/03/2021
End: 30/11/2024
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: yes
Identification of the project:
Section V: Award of contract/concession
Title:
ABS/NBS Karlsruhe - Basel Abschnitt 9, Bf Müllheim
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
23/02/2021
V.2.2)Information about tenders
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Total value of the procurement: 1 216 931.31 EUR
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammer des Bundes
Postal address: Villemomblerstr. 76
Town: Bonn
Postal code: 53123
Country: Germany
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
Die Geltendmachung der Unwirksamkeit einer Auftragsvergabe in einem Nachprüfungsverfahren ist fristgebunden. Es wird auf die in § 135 Abs. 2 GWB genannten Fristen verwiesen. Nach
§ 135 Abs. 2 S. 2 GWB endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der
Europäischen Union. Nach Ablauf der jeweiligen Frist kann eine Unwirksamkeit nicht mehr festgestellt werden.
VI.5)Date of dispatch of this notice:
24/05/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
45311200 Electrical fitting work
VII.1.2)Additional CPV code(s)
34944000 Points heating system
45315100 Electrical engineering installation works
VII.1.3)Place of performance
NUTS code: DE132 Breisgau-Hochschwarzwald
Main site or place of performance:
VII.1.4)Description of the procurement:
Bf Müllheim, Neubau Stromversorgung + 4 elektrische Weichenheizanlagen
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 15/03/2021
End: 30/11/2024
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
Total value of the contract/lot/concession: 1.00 EUR
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
LÄA 32 - Aufgrund der örtlichen Gegebenheiten ist das Mittelspannungskabel in einem Kabelkanal zu führen. Der Kabelkanal ist mit entsprechenden Blitzmarkierungen/ Abdeckungen zu
versehen. Darüber hinaus ist das Mittelspannungskabel im Sand und mit einem zusätzlichen Flatterband zu verlegen.
VII.2.2)Reasons for modification
Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee (Art. 43(1)(c) of Directive 2014/23/EU, Art. 72(1)(c) of Directive
2014/24/EU, Art. 89(1)(c) of Directive 2014/25/EU)
Description of the circumstances which rendered the modification necessary and explanation of the unforeseen nature of these circumstances:
Aufgrund der örtlichen Gegebenheiten ist das Mittelspannungskabel in einem Kabelkanal zu führen. Der Kabelkanal ist mit entsprechenden Blitzmarkierungen/ Abdeckungen zu versehen.
Darüber hinaus ist das Mittelspannungskabel im Sand und mit einem zusätzlichen Flatterband zu verlegen. Die Zusatzkosten (Minderleistung) in Verbindung mit einer neuen
Ausschreibung wären höher als die Kosten bei einer Nachtragsbeauftragung.
VII.2.3)Increase in price
Updated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU,
average inflation in the Member State concerned)
Value excluding VAT: 1 216 931.31 EUR
Total contract value after the modifications
Value excluding VAT: 1 236 931.31 EUR