Pumps (Германия - Тендер #41477651) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Германия (другие тендеры и закупки Германия) Организатор тендера: Fraunhofer-Gesellschaft - Einkauf B12 Номер конкурса: 41477651 Дата публикации: 05-05-2023 Источник тендера: Единая система закупок Европейского союза TED |
||
Pumps for the DistrictLAB - PR372895 - 3530 - W
Reference number: PR372895 - 3530 - WPR372895 - 3530 - W Pumps for the DistrictLAB
Fraunhofer IEE
Joseph-Beuys-Straße 8
34117 Kassel
The planning, design and construction of the scope of services are updated by the AN on the basis of this specification, the documents provided by the AG and taking into account the existing system structure and the structural conditions at the installation site.
It must be ensured that the scope of delivery and services are properly installed and operated correctly. If changes or additions are necessary beyond the scope described in this specification, these must be explicitly named and described when the offer is submitted, but at the latest before the order is placed.
The drawings attached to the specifications are not binding design drawings and are for information only. The Contractor must check the drawings provided for correctness. Any adjustments that may be necessary are to be carried out by the contractor in consultation with the client and after his written approval.
The Contractor is responsible for the proper and professional design and construction of the scope of delivery.
The handling of this project (meetings, documents, correspondence, documentation, etc.) takes place in German.
If not described elsewhere, the following documents are to be created by the contractor during project execution or "if attached to the specification" to be supplemented or adapted on an ongoing basis.
The technical specifications from the documentation must be taken into account.
EFRE
Directlink to documents with Selection criteria: (URL) https://vergabe.fraunhofer.de/NetServer/SelectionCriteria/54321-Tender-187dcd7f77b-7dc4b08312f0902a
Directlink to documents with Selection criteria: (URL) https://vergabe.fraunhofer.de/NetServer/SelectionCriteria/54321-Tender-187dcd7f77b-7dc4b08312f0902a
Directlink to documents with Selection criteria: (URL) https://vergabe.fraunhofer.de/NetServer/SelectionCriteria/54321-Tender-187dcd7f77b-7dc4b08312f0902a
In the event that subcontractors are used, they must be named and their suitability is likewise to be substantiated on the basis of the listed documents under III.1). Furthermore, it must be confirmed that they will be available if the order is placed; their share in the scope of the contractual object must be stated.
not applicable
EFRE
Applications for review are not permitted if more than 15 calendar days have passed since receipt of notification from the contracting authority that it is unwilling to redress an objection (section 160 (3) sentence 1 no. 4 of the German Competition Act (Gesetz gegen Wettbewerbsbeschränkungen, GWB)). Additionally, applications for review are not permitted if an award has been made before the public procurement tribunal has informed the contracting authority about the application for review (sections 168 (2) sentence 1 and 169 (1) GWB). Contracts may be awarded 15 calendar days after the tenderer information pursuant to section 134 (1) GWB has been sent. If the information is sent electronically or by fax, the period shall be reduced to ten calendar days (section 134 (2) GWB). The period shall begin on the day after which the contracting authority sends the information; the date of receipt by the tenderer and candidate in question shall be irrelevant. The admissibility of a review application also requires that the applicant notified the contracting authority about the claimed violations of public procurement provisions within ten calendar days of becoming aware of them (section 160 (3) sentence 1 no. 1 GWB). Violations of public procurement provisions which become apparent from the tender notice must be notified to the contracting authority by the end of the time limit for the application or the submission of a tender specified in the notice (section 160 (3) sentence 1 no. 2 GWB). Violations of public procurement provisions which only become apparent from the procurement documents must be notified to the contracting authority by the end of the time limit for the application or the submission of a tender (section 160 (3) sentence 1 no. 3 GWB).
Applications for review are not permitted if more than 15 calendar days have passed since receipt of notification from the contracting authority that it is unwilling to redress an objection (section 160 (3) sentence 1 no. 4 of the German Competition Act (Gesetz gegen Wettbewerbsbeschränkungen, GWB)). Additionally, applications for review are not permitted if an award has been made before the public procurement tribunal has informed the contracting authority about the application for review (sections 168 (2) sentence 1 and 169 (1) GWB). Contracts may be awarded 15 calendar days after the tenderer information pursuant to section 134 (1) GWB has been sent. If the information is sent electronically or by fax, the period shall be reduced to ten calendar days (section 134 (2) GWB). The period shall begin on the day after which the contracting authority sends the information; the date of receipt by the tenderer and candidate in question shall be irrelevant. The admissibility of a review application also requires that the applicant notified the contracting authority about the claimed violations of public procurement provisions within ten calendar days of becoming aware of them (section 160 (3) sentence 1 no. 1 GWB). Violations of public procurement provisions which become apparent from the tender notice must be notified to the contracting authority by the end of the time limit for the application or the submission of a tender specified in the notice (section 160 (3) sentence 1 no. 2 GWB). Violations of public procurement provisions which only become apparent from the procurement documents must be notified to the contracting authority by the end of the time limit for the application or the submission of a tender (section 160 (3) sentence 1 no. 3 GWB).
Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V.