Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Neubau u. Elektrifizierung Illertalbahn - Vermessungsleistungen, 4 Lose
Reference number: 22FEI57627
II.1.2)Main CPV code
71240000 Architectural, engineering and planning services
II.1.3)Type of contract
Services
II.2)Description
II.2.2)Additional CPV code(s)
71240000 Architectural, engineering and planning services
II.2.3)Place of performance
NUTS code: DE273 Kempten (Allgäu), Kreisfreie Stadt
II.2.4)Description of the procurement at the time of conclusion of the
contract:
Neubau u. Elektrifizierung Illertalbahn - Vermessungsleistungen
Los 4: Süd Hbf Kempten
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 19/08/2022
End: 22/12/2023
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
23/08/2022
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaire
Official name: GI-CONSULT GmbH
Postal address: Fanny-Zobel-Str. 5
Town: Berlin
NUTS code: DE300 Berlin
Country: Germany
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammer des Bundes
Postal address: Villemomblerstr. 76
Town: Bonn
Postal code: 53123
Country: Germany
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
Die Geltendmachung der Unwirksamkeit einer Auftragsvergabe in einem Nachprüfungsverfahren ist fristgebunden. Es wird auf die in § 135 Abs. 2 GWB genannten Fristen verwiesen. Nach
§ 135 Abs. 2 S. 2 GWB endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der
Europäischen Union. Nach Ablauf der jeweiligen Frist kann eine Unwirksamkeit nicht mehr festgestellt werden.
VI.5)Date of dispatch of this notice:
02/05/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
71240000 Architectural, engineering and planning services
VII.1.2)Additional CPV code(s)
71240000 Architectural, engineering and planning services
VII.1.3)Place of performance
NUTS code: DE273 Kempten (Allgäu), Kreisfreie Stadt
Main site or place of performance:
VII.1.4)Description of the procurement:
Neubau u. Elektrifizierung Illertalbahn - Vermessungsleistungen
Los 4: Süd Hbf Kempten
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 19/08/2022
End: 22/12/2023
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
VII.1.7)Name and address of the contractor/concessionaire
Official name: GI-CONSULT GmbH
Postal address: Fanny-Zobel-Str. 5
Town: Berlin
NUTS code: DE300 Berlin
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
NT01 - Brückenvermessung Lichte Höhe und Lichte Weite mit einem Distomat. Diese Angaben waren für die GP Fachplaner zur
Erstellung der BIM-Modellstruktur notwendig.
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b)
of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
NT01 - Die Firma GI-Consult war mit den Vermessungsleistungen der Lph 2 im Bereich Los 4 beauftragt. Die im Nachtrag 01
enthaltener Mehraufwand, war nicht Bestandteil der Beauftragten Leistungen. Ein Wechsel des AN ist, aus wirtschaftlichen
Gründen, nicht möglich.
VII.2.3)Increase in price