Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Strecke 5500 Moosburg – Landshut,km 64,5 bis 67,8, Oberleitungsanpassung ÜberleitstelleBruckbergerau
Reference number: 21FEI51989
II.1.2)Main CPV code
45234160 Catenary"s construction works
II.1.3)Type of contract
Works
II.2)Description
II.2.2)Additional CPV code(s)
45234160 Catenary"s construction works
II.2.3)Place of performance
NUTS code: DE21B Freising
II.2.4)Description of the procurement at the time of conclusion of the
contract:
Strecke 5500 Moosburg – Landshut, km 64,5 bis 67,8, Oberleitungsanpassung Überleitstelle Bruckbergerau
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 30/09/2021
End: 31/01/2023
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
Title:
Strecke 5500 Moosburg – Landshut,km 64,5 bis 67,8, Oberleitungsanpassung ÜberleitstelleBruckbergerau
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
27/09/2021
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaire
Official name: Rail Power Systems GmbH
Postal address: Garmischer Str. 35
Town: München
NUTS code: DE212 München, Kreisfreie Stadt
Postal code: 81373
Country: Germany
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Total value of the procurement: 2 474 955.10 EUR
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammer des Bundes
Postal address: Villemomblerstr. 76
Town: Bonn
Postal code: 53123
Country: Germany
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
Die Geltendmachung der Unwirksamkeit einer Auftragsvergabe in einem Nachprüfungsverfahren ist fristgebunden. Es wird auf die in § 135 Abs. 2 GWB genannten Fristen verwiesen. Nach
§ 135 Abs. 2 S. 2 GWB endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der
Europäischen Union. Nach Ablauf der jeweiligen Frist kann eine Unwirksamkeit nicht mehr festgestellt werden.
VI.5)Date of dispatch of this notice:
14/02/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
45234160 Catenary"s construction works
VII.1.2)Additional CPV code(s)
45234160 Catenary"s construction works
VII.1.3)Place of performance
NUTS code: DE21B Freising
Main site or place of performance:
VII.1.4)Description of the procurement:
Strecke 5500 Moosburg – Landshut, km 64,5 bis 67,8, Oberleitungsanpassung Überleitstelle Bruckbergerau
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 30/09/2021
End: 31/01/2023
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
Total value of the contract/lot/concession: 150 570.98 EUR
VII.1.7)Name and address of the contractor/concessionaire
Official name: Rail Power Systems GmbH
Postal address: Garmischer Str. 35
Town: München
NUTS code: DE212 München, Kreisfreie Stadt
Postal code: 81373
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
NT01 - Einsatz Doppelrammpfäle für Gründungen, statt einfacher Rammpfähle.
Die Analyse des Baugrundgutachtens vor Beginn der Arbeiten hat
ergeben, dass 14 Gründungen mit Doppelrammpfählen ausgeführt
werden müssen, statt wie angeboten mit einfachen Rammpfählen.
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b)
of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
NT01 - Die Gründungen müssen gesamthaft durch den gebundenen AN, in
Übereinstimmung mit der Bautechnologie der übrigen Leistungen
erfolgen. Eine Herauslösung und gesonderte Vergabe von 14 Gründungen, die
über das gesamte Baufeld verteilt sind, hat erhebliche negative zeitliche
und wirtschaftliche Folgen für das Projekt.
VII.2.3)Increase in price
Updated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU,
average inflation in the Member State concerned)
Value excluding VAT: 2 790 655.62 EUR
Total contract value after the modifications
Value excluding VAT: 2 941 226.60 EUR