Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Rhein-Ruhr-Express (RRX), EÜ Dhünn inkl. LSW, EÜ BAB 542, FU Katzbergstr. inkl. LSW
Reference number: 19FEI40760
II.1.2)Main CPV code
45223500 Reinforced-concrete structures
II.1.3)Type of contract
Works
II.2)Description
II.2.2)Additional CPV code(s)
45223500 Reinforced-concrete structures
II.2.3)Place of performance
NUTS code: DEA24 Leverkusen, Kreisfreie Stadt
Main site or place of performance:
51373 Leverkusen / 40764 Langenfeld
II.2.4)Description of the procurement at the time of conclusion of the
contract:
Erweiterung der EÜ/FU z.T. inkl. Errichtung LSW (Bauausführung inkl. Ausführungsplanung)
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 18/12/2019
End: 13/02/2023
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
Title:
Rhein-Ruhr-Express (RRX), EÜ Dhünn inkl. LSW, EÜ BAB 542, FU Katzbergstr. inkl. LSW
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
10/12/2019
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaire
Official name: Bauunternehmen Echterhoff GmbH & Co. KG
Postal address: Industriestrasse 9
Town: Westerkappeln
NUTS code: DEA37 Steinfurt
Postal code: 49492
Country: Germany
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Total value of the procurement: 5 921 790.15 EUR
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Vergabekammer des Bundes
Postal address: Villemomblerstr. 76
Town: Bonn
Postal code: 53123
Country: Germany
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
Die Geltendmachung der Unwirksamkeit einer Auftragsvergabe in einem Nachprüfungsverfahren ist fristgebunden. Es wird auf die in § 135 Abs. 2 GWB genannten Fristen verwiesen. Nach
§ 135 Abs. 2 S. 2 GWB endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der
Europäischen Union. Nach Ablauf der jeweiligen Frist kann eine Unwirksamkeit nicht mehr festgestellt werden.
VI.5)Date of dispatch of this notice:
13/02/2023
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
45223500 Reinforced-concrete structures
VII.1.2)Additional CPV code(s)
45223500 Reinforced-concrete structures
VII.1.3)Place of performance
NUTS code: DEA24 Leverkusen, Kreisfreie Stadt
Main site or place of performance:
51373 Leverkusen / 40764 Langenfeld
VII.1.4)Description of the procurement:
Erweiterung der EÜ/FU z.T. inkl. Errichtung LSW (Bauausführung inkl. Ausführungsplanung)
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 18/12/2019
End: 13/02/2023
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
Total value of the contract/lot/concession: 5 921 790.15 EUR
VII.1.7)Name and address of the contractor/concessionaire
Official name: Bauunternehmen Echterhoff GmbH & Co. KG
Postal address: Industriestrasse 9
Town: Westerkappeln
NUTS code: DEA37 Steinfurt
Postal code: 49492
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
MKA 85 - EÜ Dhünn - LSW-Lückenschluss EÜ-Dhünn/Stützwand IV
(MKLA 85_52)
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b)
of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Aufgrund eines baulichen Hindernisses bei der LSW-Herstellung bei km 12,161 bahnlinks nördlich der Stützwand IV (Los VE1241) sind zusätzliche Planungs- und Bauleistungen
erforderlich, um den Lückenschluss zwischen der LSW III (km 12,161) und der LSW III(e) auf der Eisenbahnüberführung EÜ-Dhünn bei km 12,174 (Los VE1541) herzustellen.
Der AN (Fa. Echterhoff) ist gemäß den vertraglichen Vereinbarungen mit der Herstellung der Lärmschutzwand LSW III(e) auf der EÜ-Dhünn ab km 12,174 beauftragt, und kann in
diesem Rahmen auch den Lückenschluss zwischen den Lärmschutzwänden herstellen. Die Vergabe dieser zusätzlichen Planungs- und Bauleistung an einen weiteren Auftragnehmer ist aus
terminlichen, sowie wirtschaftlichen Gründen nicht sinnvoll.
VII.2.3)Increase in price
Updated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU,
average inflation in the Member State concerned)
Value excluding VAT: 6 110 873.39 EUR
Total contract value after the modifications
Value excluding VAT: 6 230 873.39 EUR