Engineering services (Франция - Тендер #48193733) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Франция (другие тендеры и закупки Франция) Организатор тендера: RTE Réseau de Transport d"Electricité Номер конкурса: 48193733 Дата публикации: 17-11-2023 Источник тендера: Единая система закупок Европейского союза TED |
||
Geophysical and Geotechnical Surveys for installation engineering of Offshore Substations and Submarine Cables Routes
Reference number: 23659RTE, the French electricity transmission system operator, is responsible for the development, implementation and operation of the connection of offshore wind farms to the French public power transmission system.
In this context, RTE intends to carry out Geophysical and Geotechnical surveys for its future Offshore Substations and Submarine Cables.
The purpose of this Contract notice is to introduce the call for tender gathering 5 lots of subsequent framework contract for Surveys dedicated to the Offshore Substations and Submarine Cables. The 5 lots at stake are the following:
- Lot 1. Geophysical survey for Offshore Substations and Submarine Cables Routes
- Lot 2. Geophysical UXO survey
- Lot 3. Geotechnical survey for Offshore Substations
- Lot 4. Geotechnical survey for Submarine Cables Routes
- Lot 5. Geotechnical Landfall survey for Submarine Cables Routes
- Lot 1. Geophysical survey for Offshore Substations and Submarine Cables Routes
- Lot 2. Geophysical UXO survey
- Lot 3. Geotechnical survey for Offshore Substations
- Lot 4. Geotechnical survey for Submarine Cables Routes
- Lot 5. Geotechnical Landfall survey for Submarine Cables Routes
Geophysical survey for Offshore Substations and Submarine Cable Routes
Lot No: 1Offshore, nearshore waters and estuary : Channel sea, Atlantic ocean and Mediterranean sea
The Contractor will be in charge of full geophysical survey covering (i) the Submarine Cable Routes from Landfall (5 meters water depth) to Offshore Substation (min. 40 meters water depth) and (ii) Offshore Substation fondation, including :
- Review or perform bibliographical studies
- Review Employer data
- Define the methodology of the Survey to be carried out with the appropriate tools
- Produce Procedures (technical, QHSE, Management and operational)
- Mobilize the correct means, in due time to meet the schedule constraints
- Complete the Scope of Services - as per Employer specification and schedule
- Analyse data further to the operation and produce report to the Employer
Organisation, Ability to work on several projects at once and ability to communicate efficiently are important and part of the procurement.
Renewal option : 3 x 2 years
A maximum number of six (6) candidates getting the highest technical score with a minimum of 60/100 and being not eliminated on the administrative and financial criteria will be shortlisted and selected to receive the Invitation To Tender.
Options will be described in the tender package.
RTE reserves the right to award the framework contract on the basis of the initial offers without negotiation.
Geophysical UXO survey
Lot No: 2Offshore and nearshore waters : Channel sea, Atlantic ocean and Mediterranean sea
The Contractor will be in charge of full geophysical UXO survey covering (i) the detection of UXO before geotechnical survey (including provision of ALARP certificate) and (ii) identification of UXO before validation of Submarine Cable Routes and Offshore Substation fondation, including :
- Review or perform bibliographical studies
- Review Employer data
- Definite the methodology of the Survey to be carried out with the appropriate tools
- Produce Procedures (technical, QHSE, Management and operational)
- Mobilize the correct means, in due time to meet the schedule constraints
- Complete the Scope of Services - as per Employer specification and schedule
- Analyse data further to the operation and produce report to the Employer
Organisation, Ability to work on several projects at once and ability to communicate efficiently are important and part of the procurement.
Renewal option : 3 x 2 years
A maximum number of six (6) candidates getting the highest technical score with a minimum of 60/100 and being not eliminated on the administrative and financial will be shortlisted and selected to receive the Invitation To Tender.
RTE reserves the right to award the framework contract on the basis of the initial offers without negotiation.
Geotechnical survey for Offshore Substations
Lot No: 3Offshore waters : Channel sea, Atlantic ocean and Mediterranean sea
The Contractor will be in charge of full geotechnical survey covering the future location of Offshore Substation fondation (deep water), including :
- Review or perform bibliographical studies
- Review Employer data
- Define the methodology of the Survey to be carried out with the appropriate tools
- Produce Procedures (technical, QHSE, Management and operational)
- Mobilize the correct means, in due time to meet the schedule constraints
- Complete the Scope of Services - as per Employer specification and schedule
- Analyse data further to the operation and produce report to the Employer
Organisation, Ability to work on several projects at once and ability to communicate efficiently are important and part of the procurement.
Renewal option : 3 x 2 years
A maximum number of six (6) candidates getting the highest technical score with a minimum of 60/100 and being not eliminated on the administrative and financial will be shortlisted and selected to receive the Invitation To Tender.
Options will be described in the tender package.
RTE reserves the right to award the framework contract on the basis of the initial offers without negotiation.
Geotechnical survey for Submarine Cable Routes
Lot No: 4Offshore and nearshore waters : Channel sea, Atlantic ocean and Mediterranean sea
The Contractor will be in charge of full geotechnical survey covering the future location of Submarine Cable Routes, including :
- Review or perform bibliographical studies
- Review Employer data
- Define the methodology of the Survey to be carried out with the appropriate tools
- Produce Procedures (technical, QHSE, Management and operational)
- Mobilize the correct means, in due time to meet the schedule constraints
- Complete the Scope of Services - as per Employer specification and schedule
- Analyse data further to the operation and produce report to the Employer
Organisation, Ability to work on several projects at once and ability to communicate efficiently are important and part of the procurement.
Renewal option : 3 x 2 years
A maximum number of six (6) candidates getting the highest technical score with a minimum of 60/100 and being not eliminated on the administrative and financial will be shortlisted and selected to receive the Invitation To Tender.
Options will be described in the tender package.
RTE reserves the right to award the framework contract on the basis of the initial offers without negotiation.
Geotechnical Landfall survey for Submarine Cable Routes
Lot No: 5Nearshore, foreshore waters and estuary : Channel sea, Atlantic ocean and Mediterranean sea
The Contractor will be in charge of full geotechnical survey covering the future Submarine Cable Routes at Landfall location, including :
- Review or perform bibliographical studies
- Review Employer data
- Define the methodology of the Survey to be carried out with the appropriate tools
- Produce Procedures (technical, QHSE, Management and operational)
- Mobilize the correct means, in due time to meet the schedule constraints
- Complete the Scope of Services - as per Employer specification and schedule
- Analyse data further to the operation and produce report to the Employer
Organisation, Ability to work on several projects at once and ability to communicate efficiently are important and part of the procurement.
Renewal option : 3 x 2 years
A maximum number of six (6) candidates getting the highest technical score with a minimum of 60/100 and being not eliminated on the administrative and financial will be shortlisted and selected to receive the Invitation To Tender.
Options will be described in the tender package.
RTE reserves the right to award the framework contract on the basis of the initial offers without negotiation.
For candidates registered in France:
- Numéro d"identification unique
- ou Carte d’identification justifiant de l’inscription au répertoire des métiers (original ou copie) datant de moins de 3 mois par rapport à la date limite de réponse à l"avis de marché
For candidates registered out of France :
- a less than 3 months old document issued by an official authority certifying the registration of the Candidate on a professional Register or a document issued by the official authorities holding the professional register or an equivalent document certifying this registration.
For all candidates :
- a dated and signed statement under oath certifying that the Candidate is not in one of the case prohibiting it to tender as stated in articles L. 2141-1 to L. 2141-6 and in articles L. 2141-7 to L. 2141-11 of the french code de la commande publique and is compliant with articles L. 5212-1 à L. 5212-11 of the French labour code regarding the employment of disabled workers.
- if the Candidate is subject to insolvency procedures, all court orders and notifications shall be provided.
The excel file "23659-PQQ_Rev.0" available under the link https://rte-france.bravosolution.com shall be filled in by each candidate and submitted in the RFI under the link https://rte-france.bravosolution.com.
Minimum turnover required per lot is set out in the excel file "23659-PQQ_Rev.0" enclosed in the dossier "RFI-23659 : Geophysical and Geotechnical Surveys for installation engineering of Offshore Substations and Submarine Cable Routes" available under the link https://rte-france.bravosolution.com. The excel file "23659-PQQ_Rev.0" shall be filled in by each candidate and submitted in the RFI under the link https://rte-france.bravosolution.com.
For all lots:
- Provide the portions of the turnover associated to the type of services requested for each lot in the contract notice for the the last 3 years (2020, 2021, 2022)
- Provide a brief summary of Candidate"s history and also an organizational chart detailing the Candidate organization (mentioning the number of employees)
- Present the Candidate entity from a legal point of view
- Provide the name of the direct parent company and the ultimate holding company of the Candidate
- Provide the shareholding diagram of the Candidate.
- In case the Candidate plans to subcontract a part of its activities related the contract notice, please provide the scope of work planned to be subcontracted and the subcontractor name if known at that time.
The excel file "23659-PQQ_Rev.0" available under the link https://rte-france.bravosolution.com shall be filled in by each candidate and submitted in the RFI under the link https://rte-france.bravosolution.com.
Technical criteria are defined in the excel file "23659-PQQ_Rev.0" enclosed in the dossier "RFI-23659 : Geophysical and Geotechnical Surveys for installation engineering of Offshore Substations and Submarine Cable Routes" available under the link https://rte-france.bravosolution.com. The excel file "23659-PQQ_Rev.0" shall be filled in by each candidate and submitted in the RFI under the link https://rte-france.bravosolution.com.
If applicable, such conditions will be specified in the Invitation to Tender.
Payment conditions : 49 days from the issuance date of the invoice accepted by RTE.
RTE reserves the right to request to the group of economic operators its transformation into a group where all members are jointly and severally liable at framework contract award, should this transformation be necessary to the good execution of the framework contract.
In case of group application, all the documents requested from III.1.1) to III.1.3) shall be provided by each of the group members.
Except as stipulated in the article R.2142-26 of the French Code de la Commande Publique, the group members shall not be modified between the answer to the contract notice and the signature of the framework contract.
RTE reserves the right to award the framework contract on the basis of the initial offers without negotiation.
A claim in a pre-contractual summary proceeding is possible as stated in articles 5 et seq. of Order NO.2009-515 of 7 May of 2009 related to complaint proceedings applicable to public procurement contracts.
The appeal must be lodged before the conclusion of the contract.
A claim in a pre-contractual summary proceeding is possible as stated in articles 11 et seq. of Order NO.2009-515 of 7 May of 2009 related to complaint proceedings applicable to public procurement contracts.
The appeal must be lodged at the latest on the thirty first (31st) day following the publication of the contract award notice in the Official Journal of the European Union or, for the contracts based on a framework agreement or on a dynamic purchasing system, following the notification of the contract signature.
In the absence of publication of the award notice or in the absence of notification of the contract signature, an application to the competent court may be made until the expiry of a six (6) months period starting at the day after the contract award as stated in article 1441-3 of the Civil Procedure Code.
A claim in a pre-contractual summary proceeding is possible as stated in articles 5 et seq. of Order NO.2009-515 of 7 May of 2009 related to complaint proceedings applicable to public procurement contracts.
The appeal must be lodged before the conclusion of the contract.
A claim in a pre-contractual summary proceeding is possible as stated in articles 11 et seq. of Order NO.2009-515 of 7 May of 2009 related to complaint proceedings applicable to public procurement contracts.
The appeal must be lodged at the latest on the thirty first (31st) day following the publication of the contract award notice in the Official Journal of the European Union or, for the contracts based on a framework agreement or on a dynamic purchasing system, following the notification of the contract signature.
In the absence of publication of the award notice or in the absence of notification of the contract signature, an application to the competent court may be made until the expiry of a six (6) months period starting at the day after the contract award as stated in article 1441-3 of the Civil Procedure Code.
Tribunal de Grande Instance de Nanterre