RFP 26-0014 - RFP 26-0014 - Curb, Gutter and Sidewalks Installation (Канада - Тендер #70884865) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Канада (другие тендеры и закупки Канада) Организатор тендера: www.merx.com Номер конкурса: 70884865 Дата публикации: 24-02-2026 Источник тендера: www.merx.com |
||
Seeking a contractor to prepare and install approximately 1700m of concrete curb and gutter, as well as approximately 900m of concrete sidewalk as part of ongoing street rehabilitation projects.
00004914584
Issuing OrganizationCity of Prince Rupert
Solicitation TypeRFP - Request for Proposal (Formal)
Solicitation NumberRFP 26-0014
TitleRFP 26-0014 - Curb, Gutter and Sidewalks Installation
Source IDSCRIBE
British Columbia
Purchase TypeNot Stated
2026/02/23 08:20:00 AM EST
Closing Date2026/02/27 05:00:00 PM EST
Guneet Uppal, P.Eng
250-627-0960
guneet.uppal@princerupert.ca
The City has undergone an extensive infrastructure renewal program and is in the process of multiple full street rehabilitation projects. Part of the rehabilitation process is the installation
of curb, gutter and sidewalk. The city is looking for a proponent to prepare and install approximately 1700m of concrete curb and gutter, as well as approximately 900m of concrete
sidewalk.
Scope of Services
The services will comprise of repairs for Concrete Curb, Gutter and Sidewalk, including:
(i)Preparation of base and base materials (as per MMCD Specifications)
(ii)Installation of forms for curbs (to be inspected and approved by city)
(iii)Pour and place concrete for curbs (as per MMCD Specifications)
(iv)Establish curb letdowns per drawings, or stakes laid out by city
(v)Installation of form for sidewalk (to be inspected and approved by city)
(vi)Pour and place concrete for sidewalk (as per MMCD Specifications)
(vii)Protect concrete during curing process (hoarding may be required)
(viii)Concrete to be broom finished and sealed (as per MMCD Specifications)
(ix)Supply and install any and all backfill materials
(x)Adjustments requirements for any Catchbasins must be noted prior to and brought to the City’s attention. Repairs and adjustments, and who is to preform the works, will be discussed at the
time of.
(xi)Any and all traffic control, TMP and TCP needed during the duration of works
(xii)West/East bound traffic to be maintained at all times (Alternating is acceptable)
(xiii)BC Hydro Pole hold if required
(xiv)Coordination will all other utilities and utility companies