6226142 - ITB Salmon Arm Primary Care Network Minor Renovations - General Contractor Services (Канада - Тендер #67921453) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Канада (другие тендеры и закупки Канада) Организатор тендера: www.merx.com Номер конкурса: 67921453 Дата публикации: 22-10-2025 Источник тендера: www.merx.com |
||
Interior Health is renovating existing office space to establish a Primary Care Network, including modifications to support clinical and workstation areas with comprehensive upgrades to flooring, lighting, plumbing, and infrastructure.
00004765219
Issuing OrganizationInterior Health Authority
Solicitation TypeITT - Invitation to Tender (Formal)
Solicitation Number6226142
TitleITB Salmon Arm Primary Care Network Minor Renovations - General Contractor Services
Source IDSCRIBE
British Columbia
Purchase TypeNot Stated
2025/10/22 07:27:00 AM EDT
Closing Date2025/11/17 05:00:00 PM EST
Interior Health Corporate Office
250-469-7070
Interior Health is renovating existing office space to establish a Primary Care Network (PCN). The scope includes modifications to support clinical and workstation areas to enhance Primary Care
Services.
The scope includes (but not limited too):-
• Replacement of flooring throughout the entire tenant space. (Area 4,293 sq. ft.)
• Ceiling tile replacement.
• Full repainting of all surfaces.
• Replacement of window coverings.
• Replacement of existing inadequate lighting and installation of additional lights throughout entire space.
• Supply and installation of two additional medical room sinks, plus replacement of existing washroom sinks.
• Supply and installation of cooling Split Heat Pump in the Data Room.
• Supply and installation of additional power receptacles.
• Fire Rating upgrades, including additional construction above existing demising walls.
• Supply and Installation of New doors and door hardware as required.
• Minor Mill-work and accessories installations.
Note:- Due to budget constraints, majority of the existing infrastructure will be re-purposed where possible.
2. The estimated construction budget for the Project is $ 360,000.00
3. Desired Ready-for-Takeover date is February 15, 2026