AB-2025-05765 - Various Shower House Push Button Mechanism Upgrades - Forestry and Parks, Central Region (Канада - Тендер #66711045) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Канада (другие тендеры и закупки Канада) Организатор тендера: www.merx.com Номер конкурса: 66711045 Дата публикации: 04-09-2025 Источник тендера: www.merx.com |
||
Seeking contractors to upgrade shower mechanisms in three provincial parks, with work divided into three phases that can be bid on separately.
00004700970
Issuing OrganizationForestry and Parks
Solicitation TypeRFQ - Request for Quote (Informal)
Solicitation NumberAB-2025-05765
TitleVarious Shower House Push Button Mechanism Upgrades - Forestry and Parks, Central Region
Source IDSCRIBE
Alberta
Purchase TypeNot Stated
2025/09/03 01:24:00 PM EDT
Closing Date2025/10/03 04:00:00 PM EDT
Breann Haskim
Breann.Haskim@gov.ab.ca
PROJECT LOCATIONS:
•Carson-Pegasus Provincial Park
•Crimson Lake Provincial Park
•Pigeon Lake Provincial Park – Zeiner Campground
Many of the push button mechanisms within the shower houses of the Central Region need upgraded. The scope of work for this project has been broken down into 3 phases. Bidders are welcome to
bid on one, two or all three phases of this project. Due to budget and time constraints the province may move forward with any combination of phases or none.
SCOPE OF WORK:
•Mobilization and Demobilization
•Remove current coin operated or push button shower controllers and dispose offsite
•Remove all solenoids that are currently connected to the pipes and dispose offsite
•Re-connect the pipes after removing the solenoids
•Wood framed walls: Colour match and replace RFP at each shower house on wall where the push button mechanisms are removed from •Cinder Block walls: Install stainless steel plate with
supports where the push button mechanisms are removed from
•Supply material, haul on site, relocate and install Symmons Showeroff 4-420, Symmons Showeroff 4-427-R shower limiting valve or equivalent in each shower stall
•Connect each commercial grade mechanical metering shower valve to existing plumbing
•Cap or remove all pipes no longer in use
•Clean up the site
•Once water is on in the shower houses in the spring of 2026, return to each site to commissioning valves
•Closeout documentation
Information/Pre-bid Meeting**Mandatory
Wed•Sep 17, 2025•9:30 am (MT)