AB-2025-05137 - Kitchen Flooring Replacement & Painting Project - Smithfield Lodge (Westlock) (Канада - Тендер #65930019) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Канада (другие тендеры и закупки Канада) Организатор тендера: www.merx.com Номер конкурса: 65930019 Дата публикации: 02-08-2025 Источник тендера: www.merx.com |
||
00004658705
Issuing OrganizationHomeland Housing
Solicitation TypeITB - Invitation to Bid (Formal)
Solicitation NumberAB-2025-05137
TitleKitchen Flooring Replacement & Painting Project - Smithfield Lodge (Westlock)
Source IDSCRIBE
Alberta
Purchase TypeNot Stated
2025/08/01 03:58:00 PM EDT
Closing Date2025/08/18 04:00:00 PM EDT
Jennifer McLeod
jmcleod@homelandhousing.ca
Smithfield Lodge is approximately 43 years old with renovations having been completed in 2003. The Kitchen flooring is currently in poor condition with multiple patches having been completed
and we are requesting a quote for replacement of the flooring throughout the Kitchen. This is a 104 suite Lodge with residents that have their own suite and meal services are provided to them
in the communal Dining Room. The lodge facility functions 24/7 and 7 days/per week. There is staff on site 24 hrs per day. The flooring/painting project will interrupt both our residents and
staff. The plan/schedule for this installation will be extremely important to plan out and arrange around all aspects of the facility’s function to minimize disruptions to both the residents
and staff. Contractor will be required to supply a mobile kitchen to be parked on the property for meal service to be able to continue. For the mobile kitchen, it must contain the following:
walk-in cooler, walk-in freezer, range, oven (convection oven if possible), grill, steamer, dishwasher and a minimum of three prep tables with sinks. Propane and/or a super silent generator is
the preferred method for powering the kitchen. Water and fuel for running the kitchen equipment is to be provided by the contractor. An example of a mobile kitchen floor plan is shown below
with a full size drawing attached to this Bid Contract Package. The contractor will also be responsible for moving items out of the kitchen and into the mobile kitchen and then back in to the
kitchen once the exhaust system work has been completed. The stainless steel tables located in the back of the kitchen will be rearranged and new location will be discussed with the successful
contractor. The convection oven and range may need to remain in the room. They may need to be set onto castors to be moved around but limited moving is likely expected. The following are
pictures of the kitchen to show items that will be required to be moved and stored in an assigned location.
Information/Pre-bid Meeting
Thu•Aug 7, 2025•2:00 pm (MT)