Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Hauptbauleistungen A26 Linzer Autobahn, Etappe 1 Gesamtangebot (Loskombination)
Reference number: 0
II.1.2)Main CPV code
45221000 Construction work for bridges and tunnels, shafts and subways
II.1.3)Type of contract
Works
II.2)Description
II.2.1)Title:
HauptbauleistungenA26 Linzer Autobahn, Etappe 1Gesamtangebot (Loskombination)
II.2.3)Place of performance
NUTS code: AT Österreich
II.2.4)Description of the procurement at the time of conclusion of the
contract:
HauptbauleistungenA26 Linzer Autobahn, Etappe 1Gesamtangebot (Loskombination)
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 08/10/2018
End: 30/10/2024
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
Section V: Award of contract/concession
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
18/09/2018
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: yes
V.2.3)Name and address of the contractor/concessionaire
Official name: F Pile
Town: Wien
NUTS code: AT Österreich
Country: Austria
The contractor/concessionaire is an SME: yes
V.2.3)Name and address of the contractor/concessionaire
Official name: MAEG
Town: Vazzola
NUTS code: IT Italia
Country: Italy
The contractor/concessionaire is an SME: yes
V.2.3)Name and address of the contractor/concessionaire
Official name: ICM
Town: Vincenca
NUTS code: IT Italia
Country: Italy
The contractor/concessionaire is an SME: yes
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Total value of the procurement: 132 322 359.08 EUR
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
45221000 Construction work for bridges and tunnels, shafts and subways
VII.1.2)Additional CPV code(s)
VII.1.3)Place of performance
NUTS code: AT Österreich
Main site or place of performance:
VII.1.4)Description of the procurement:
Die gegenständliche Änderung gegenüber dem Bauvertrag liegt in einergeänderten Ausführung der Felssicherungen an der B127. Dabei haben sich sowohl Länge und Höhe der
Steinschlagnetze geändert.
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 08/10/2018
End: 30/10/2024
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
Total value of the contract/lot/concession: 1.00 EUR
VII.1.7)Name and address of the contractor/concessionaire
Official name: F Pile
Town: Wien
NUTS code: AT Österreich
Country: Austria
The contractor/concessionaire is an SME: no
VII.1.7)Name and address of the contractor/concessionaire
Official name: MAEG
Town: Vazzola
NUTS code: IT Italia
Country: Italy
The contractor/concessionaire is an SME: yes
VII.1.7)Name and address of the contractor/concessionaire
Official name: ICM
Town: Vincenca
NUTS code: IT Italia
Country: Italy
The contractor/concessionaire is an SME: yes
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
Die gegenständliche Änderung gegenüber dem Bauvertrag liegt in einergeänderten Ausführung der Felssicherungen an der B127. Dabei haben sich sowohl Länge und Höhe der
Steinschlagnetze geändert.
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b)
of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Ein Wechsel des Auftragnehmers ist aus technischen und wirtschaftlichen Gründen nicht möglich, da die gegenständliche Vertragsänderung in einem engen wirtschaftlichen bzw.
technischen Zusammenhang mit dem ursprünglichen Auftrag steht. Zudem würde ein Wechsel des Auftragnehmers für den Auftraggeber zu erheblichen Schwierigkeiten in der
Auftragsabwicklung führen, da eine zeitliche Unterbrechung des Auftrages die termingerechte Realisierung des Projektes gefährden und auch unzählige Schnittstellenprobleme
aufwerfen würde. In weiterer Folge wäre der Auftraggeber auch mit beachtlichen Zusatzkosten aufgrund von Einarbeitungen, Vorbereitungsmaßnahmen, unvermeidbare Parallelbearbeitung
bzw. allfälligen Stehzeiten konfrontiert.
VII.2.3)Increase in price
Updated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU,
average inflation in the Member State concerned)
Value excluding VAT: 160 949 698.18 EUR
Total contract value after the modifications
Value excluding VAT: 160 872 181.27 EUR