Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
A11 Karawankentunnel, Vollausbau Karawankentunnel 2. Röhre
Reference number: 0
II.1.2)Main CPV code
45000000 Construction work
II.1.3)Type of contract
Works
II.2)Description
II.2.1)Title:
A11 Karawankenautobahn, Vollausbau Karawankentunnel, 2. Röhre
II.2.3)Place of performance
NUTS code: AT Österreich
II.2.4)Description of the procurement at the time of conclusion of the
contract:
A11 Karawankenautobahn, Vollausbau Karawankentunnel, 2. Röhre
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 02/08/2021
End: 01/04/2024
In the case of framework agreements, provide justification for any duration exceeding 4 years:
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: yes
Identification of the project:
ARES(2017)5550210-14/11/2017
Section V: Award of contract/concession
Title:
A11 Karawankenautobahn, Karawankentunnel 2. Röhre; BL - Vollausbau Karawankentunnel
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:
02/08/2018
V.2.2)Information about tenders
The contract/concession has been awarded to a group of economic operators: yes
V.2.3)Name and address of the contractor/concessionaire
Official name: Swietelsky Tunnelbau GmbH & Co KG
Postal address: Innsbrucker Bundestraße 61
Town: Salzburg
NUTS code: AT Österreich
Postal code: 5020
Country: Austria
The contractor/concessionaire is an SME: no
V.2.3)Name and address of the contractor/concessionaire
Official name: Swietelsky Baugesellschaft m.b.H.
Postal address: Edlbacherstraße 10
Town: Linz
NUTS code: AT Österreich
Postal code: 4020
Country: Austria
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion
of the contract;excluding VAT)
Total value of the procurement: 89 879 579.18 EUR
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
45000000 Construction work
VII.1.2)Additional CPV code(s)
VII.1.3)Place of performance
NUTS code: AT Österreich
Main site or place of performance:
Projektgebiet und Villach
VII.1.4)Description of the procurement:
Der Untergrund im Arbeitsbereich der aufzubrindenen Fugenbänder auf der Zwischendecke und des Gewölbes im Abluftkanal muss aufgeraut werden. Die Flächen müssen zwischen Beton
und Kleber eine Haftzugfestigkeit von min. 1,50 N/mm2 erreichen (MKF83/ÄA77).
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or
concession
Start: 02/08/2021
End: 01/04/2024
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
Total value of the contract/lot/concession: 88 330.61 EUR
VII.1.7)Name and address of the contractor/concessionaire
Official name: Swietelsky Tunnelbau GmbH & Co KG
Postal address: Innsbrucker Bundestraße 61
Town: Salzburg
NUTS code: AT Österreich
Postal code: 5020
Country: Austria
The contractor/concessionaire is an SME: no
VII.1.7)Name and address of the contractor/concessionaire
Official name: Swietelsky Baugesellschaft m.b.H.
Postal address: Edlbacherstraße 10
Town: Linz
NUTS code: AT Österreich
Postal code: 4020
Country: Austria
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modifications
Nature and extent of the modifications (with indication of possible earlier changes to the contract):
Der Untergrund im Arbeitsbereich der aufzubrindenen Fugenbänder auf der Zwischendecke und des Gewölbes im Abluftkanal muss aufgeraut werden. Die Flächen müssen zwischen Beton
und Kleber eine Haftzugfestigkeit von min. 1,50 N/mm2 erreichen (MKF83/ÄA77).
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b)
of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Ein Wechsel des Auftragnehmers ist aus technischen und wirtschaftlichen Gründen nicht möglich, da die gegenständliche Vertragsänderung in einem engen wirtschaftlichen bzw.
technischen Zusammenhang mit dem ursprünglichen Auftrag steht. Zudem würde ein Wechsel des Auftragnehmers für den Auftraggeber zu erheblichen Schwierigkeiten in der
Auftragsabwicklung führen, da eine zeitliche Unterbrechung des Auftrages die termingerechte Realisierung des Projektes gefährden und auch unzählige Schnittstellenprobleme
aufwerfen würde. In weiterer Folge wäre der Auftraggeber auch mit beachtlichen Zusatzkosten aufgrund von Einarbeitungen, Vorbereitungsmaßnahmen, unvermeidbare Parallelbearbeitung
bzw. allfälligen Stehzeiten konfrontiert.
VII.2.3)Increase in price
Updated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU,
average inflation in the Member State concerned)
Value excluding VAT: 98 269 471.87 EUR
Total contract value after the modifications
Value excluding VAT: 98 357 802.48 EUR