Description
CONTACT INFORMATION|4|N743.4|WVF|717-605-3354|amanda.l.bailey50.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY
REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification sections C and E. | INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE
AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material |N/A|TBD|N00104 |TBD|N39040 |N50286
|TBD|133.2|N/A|N/A|N39040 |N/A|N/A|SEE DD F ORM 1423 |PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL | NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL
OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|365 days after acceptances of material|365 days after acceptances of material||||| WARRANTY OF
DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION
2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB
2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|13|332722|500|||||||||||| NOTICE OF PRIORITY
RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| DD1423 Data Item A001 may be waived if already on file at NAVSUP WSS Mechanicsburg. Any
contract awarded as a result of this solicitation will be "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). NAVSUP WSS
Mechanicsburg will be considering past performance in the evaluation of offers in accordance with FAR 13.106(a)(2) and DFARS 252.213-7000. If drawings are included in the solicitation,
access needs to be requested on the individual solicitation page on Contracts Opportunities on the Governments SAM website. After requesting access, send an email to the Primary POC
listed on the solicitation. 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would
create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been
designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2.
APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of
this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been
obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The
specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library
Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification
revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released
revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or
re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Documents,
drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 "Document References" listed below must be obtained by
the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=4558724 |80064| C| |D|0001 | C|49998|0274254 DOCUMENT REF DATA=FED-STD-H28
| | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-B150 | | | |190401|A| | |
DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | |
|050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT
REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3.
REQUIREMENTS 3.1 ;Nut, retaining to be in accordance with BUSHIPS drawing 845-4558724, piece 8, except as amplified or modified herein.; 3.2 Material for Parts Requiring Certification -
Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Nut, Retaining; Material - ;ASTM-B150, alloy C63200,
temper TQ50; 3.3 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable
drawings is still required, but certifications are only required as listed below. Test - Non-Destructive Tests Item - ;Weld Repair and/or Production Weld (as applicable); Performance -
Per applicable fabrication specification Acceptance - Per applicable fabrication specification 3.4 Welding or Brazing - When welding, brazing, and allied processes are required, as
invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or
S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or
0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.5 NAVSEA 0948-LP-045-7010 - Any
applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are
for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.5.1 Marking of material with a Material Designator per the Drawing is also prohibited, with
the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. 3.6 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL)
The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement
document, including any/all invoked specifications and drawings. 3.7 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of
proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the
Contract/Purchase Order. 3.7.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer.
Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below.
a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number
of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being
utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.7.2
All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.7.3 ECPs - The Government will maintain configuration
control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an
Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the
following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for
that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled
by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit
should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the
product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation
of the engineering change. 3.8 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection
gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.8.1 System 21 of
FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.8.2 For Navy and
Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing
specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System
22, such as certain thread types of MIL-DTL-1222. 3.8.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not
applicable to the specified inspection system. 3.9 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or
supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.10 O-ring grooves and mating sealing surfaces must be inspected per the
contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance
Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be
accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data
that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support
Library Reference Number CSD008 at https://register.nslc.navy.mil/ ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.11 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed,
listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractors name, address and date, quantity inspected, identified to the
contract/purchase order and item number, and the Contractors or authorized personnels signature. Test certifications must reference the standard/specification, including the revision, to
which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint
and layer. 3.12 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as
amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration
system requirements of MIL-STD-4 3.12.1 The Contractors quality system and products supplied under the system are subject to evaluation, verification inspection, and
acceptance/nonacceptance by the Government representative to determine the systems effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.12.2 The
Contractors quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life
of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.12.3 See CDRL
DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the
Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring
Activity may request the PCO waive this requirement. 3.12.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may
not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant
so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency
(DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.12.5 Any changes made by the
Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.13 Contractor
Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and
type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected.
3.13.1 The suppliers gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements.
When conditions warrant, the suppliers personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.13.2 All documents and
reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished
in accordance with the instructions provided by the Government representative. 3.14 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies
or services that were not manufactured or performed within the contractors facility. Such inspection can only be requested by or under authorization of the Government representative. Any
purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that
apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractors facility, applicable purchase documents must be annotated with the
following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally
services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense
Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately."
3.14.1 The prime contractors program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the
contract, prior to the issuance of any purchase document. 3.14.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic
review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.14.3
The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the
purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.14.4 The prime contractor must evaluate the requirements of
the contractand select suppliers based on their ability to supply the product in accordance with the prime contractors requirements and the contract. Criteria for selection and evaluation
must be established. Records of this effort must be available for review by the government. 3.14.5 The prime contractors supplier quality assurance program must provide for a review of
purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.15 Government Furnished Material and/or
Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.15.1
Visual examination upon receipt to detect damage during transit. 3.15.2 Inspection for completeness and proper type. 3.15.3 Verification of material quality received. 3.15.4 Periodic
inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.15.5 Functional testing, either prior to or
after installation, or both, as required by the Contract to determine satisfactory operation. 3.15.6 Identification and protection from improper use or disposition. 3.15.7 Reporting to
the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier
must determine and record probable cause and necessity for withholding the material from use. 3.15.8 For GFE material, and as required by the terms of the bailment agreement, the supplier
must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be
maintained. 3.15.9 Material returned to the contractor must be handled as GFM. 3.16 Traceability and Certification Requirements - To assure that correct materials are installed in Level
I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The
material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data
are identified within Paragraph 3, Section C of this contract/purchase order. 3.16.1 The following provides the minimum requirements for maintaining material traceability and supplements
the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements
stated herein and elsewhere in this Contract/Purchase Order. 3.17 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot
number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the materials
chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once
in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations
including any subcontracted operations, to the finished component. 3.17.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements.
Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or
specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate
marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this
contract/purchase order and differs from that specified in the specification or drawing. 3.17.2 Traceability markings for items with precision machined or plated surfaces, or material
with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed
to the material. 3.17.3 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. ; ; 3.18 See CDRL DI-MISC-81020 (Chemical and
Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply: 3.18.1
Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition,
grade, type, finish, and/or composition, as applicable, of the material supplied. 3.18.2 Re-identification and re-certification of material is required when the material is subjected to a
process which alters its properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original
certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties
is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of
the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified. The properties thus determined and documented, are
required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original
certification forchemical composition must be overstamped and annotated with the unique traceability marking used with the altered material and at a minimum contain the information below.
TRACEABILITY MARKING ________________________________________________ (marking on finished item) IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO HEAT/LOT NUMBER ______________ AND HEAT
TREAT NUMBER ____________________ (when applicable) _________________________________________ DATE _____________________ (name and signature of auth. co. rep.) 3.18.3 Material
certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full
compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited. 3.18.4 Statements on material certification documents must be
positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.18.5 If material is received
without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.19 Material Handling - The written material control
process must include the following: 3.19.1 All raw materials must have traceability markings (except as specified below). 3.19.2 Stored raw materials requiring traceability must be
segregated to preclude intermingling with materials not requiring traceability. 3.19.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking
must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as
a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss
of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.19.4 Brazing or weld filler metals for strength welds forming or integral
with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a minimum,
material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the
point of consumption to assure use of the correct type and grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the
responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors. 3.19.5 Purchase orders for raw material must specify
that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements
contained in DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material. 3.19.6 The material control process must include requirements for the
maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and
marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.20 Receiving
inspection - 3.20.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the
prime prior to further processing within the prime contractors plant or shipment to another location. 3.20.2 Receiving Inspection must include as a minimum - Verification that the
traceability marking on the material agrees with that on the certification test reports. Verification that certification test reports are legible and complete. Verification that the
contents of the certification test reports are in compliance with the contractually invoked specifications and requirements. 3.21 Discrepancy reporting - 3.21.1 Nonconforming products
from sub-tier suppliers must be identified and processed in accordance with the prime contractors procedures for controlling nonconforming products. The prime contractor must report the
receipt of any nonconforming products to the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for
review by the government Quality Assurance Representative (QAR). 3.22 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.22.1
Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in
accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the
absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES -
For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.22.2 The
Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used
provides acceptable products to the Government. However, the Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute
sampling plan outlined above. 3.22.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking),
and nondestructive test (NDT) certifications for material must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.22.4 All
material requiring traceability must be 100% inspected for traceability marking and that the marking is legible. 3.23 Welding Requirements - When production or repair welding is required,
the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as
part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds. 3.23.1 Approval of the Contractors qualification data must be
obtained prior to performing any welding (production or repair). 3.23.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the
original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable
welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures
for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF.
The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. WP-123 and QD-123 are
submitted for the weld joint between pieces 1 and 2 on drawing ABC. WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ) 3.23.3 The PCOs authorization for the use
of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010,
S9074-AR-GIB-010A/278,248d the contract. 3.23.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained
via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs
deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure
Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data
Submission (ECDS) application. 3.23.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer
to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.23.6 When drawings require hardfacing surface
Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test
results must be submitted as part of the qualification data. 3.23.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible
photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential elements and any elements not listed in
S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element. 3.23.8 Preparation and retention of
weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.23.9 When production or repair welding is required on titanium materials, theapplicable fabrication
plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval. 3.23.10 If the contractors fabrication plan, facilities
procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with
the applicable documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or
any future contracts. The contractors fabrication plan, facilities procedure, training plan, and active welder qualification must be submitted at the same time as the applicable welding
procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF. 3.23.11 A Certificate of
Compliance is required for all weld filler metals used for production or repair welding, and must include the following: a) Filler Metal LOT number(s) b) Specification and Type c) A
positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements. d) A positive statement verifying that the
weld filler metals were the correct material type or grade prior to consumption. 3.23.12 When production welds or repair welds are performed by a subcontractor, the requirement for
submission of all certification documentation required herein must be passed down to the subcontractor. 3.24 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of
compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractors name, address and date. 2. The
contract/purchase order number (for example: N00104-11-P-FA12) 3. The National Stock Number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two
digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (for example: 1H 4820 012345678 L1) ("N/A" when Not Applicable). 4. Lubricants, sealants, anti-seize, and/or thread
locking compounds ("N/A" when Not Applicable). 5. Certification that O-rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or
sub-assembly, prior to expiration of the shelf life ("N/A" when Not Applicable). 6. Manufacturers compound number ("N/A" when Not Applicable). 7. When weld procedure submittal is required
by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 8. A
statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked
conformance/compliance test performed by name and that it was performed satisfactorily. 9. Contractors or authorized personnels signature. 4. QUALITY ASSURANCE 4.1 Notes to DCMA QAR and
the Contractor - 4.1.1 DCMA QAR and the Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged
individually on the basis of the effect, if any, on contractual requirements. When there is a disagreement between the Contractor and the Government representative as to the effect on
contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition. 4.1.2 DCMA QAR and the Contractor for proprietary designs - All
records of departures from Contractor imposed requirements must be maintained and available for review at the Contractors facility. A copy must be given to the local Government
representative. A record of these departures, traceable to the applicablepart number and contract number must be submitted to the PCO. 4.1.3 DCMA QAR and the Contractor for proprietary
designs - For proprietary designs, the contractors part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other
contractual requirements. 4.1.4 DCMA QAR - It is the responsibility of DCMA QAR to review Non-Destructive Testing (NDT) procedures for NAVSUP Contracts/Purchase Orders. 4.1.5 DCMA QAR and
the Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions and to submit questions and clarifications, and waiver requests on
Contracts and Solicitations. ECDS can be found at: https://register.nslc.navy.mil/ 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and
Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Several
definitions of terms that apply to CSI items are listed below. All terms may not apply to every item. 6.1.1 The ECDS (Electronic Contractor Data Submission) system is at:
https://register.nslc.navy.mil/ This application will require advance registration using a PKI Digital Certificate on a CAC. A Vendor User Guide is available as CSD001 in the CSD
(Contract Support Document) Library within ECDS. 6.1.2 Critical Safety Item (CSI) - Any ship part, assembly, or support equipment containing a critical characteristic whose failure,
malfunction, or absence of which could cause a catastrophic or critical failure resulting in loss of, or serious damage to the ship, or unacceptable risk of personal injury or loss of
life. 6.1.3 Critical Process - As determined by the TWH, any process, operation or action performed on a Ship CSI that serves to establish a critical characteristic (such as welding,
soldering, machining, polishing, cleaning, or assembling) or confirm that a critical characteristic is within drawing or specification compliance (such as, testing, measurement, or
non-destructive evaluation). 6.1.4 First Article - Pre-production models, initial product samples, test samples produced to ensure a manufacturers capability to meet full specification
requirements. 6.1.5 First Article Test (FAT) - Contractually required testing and inspection of a suppliers pre-production, production, or "production representative" specimens to
evaluate a manufacturers ability to produce conforming product prior to the Governments commitment to receive subsequent production items. First Article Testing is product specific and
does not assess manufacturing process controls nor does it assure the effectiveness of the manufacturers quality program. 6.1.6 Government Source Inspection (GSI) - GSI is independent
oversight performed by a government representative usually a DCMA Quality Assurance Representative (QAR)) to assure that those unique product quality and system elements, identified by
the Contracting Agency as important, are observed and evaluated. 6.1.7 Quality Assurance Letter of Instruction (QALI) - A QALI is a formal document initiated by a contracting activity
that provides essential requirements and instructions for contracted materials to be independently verified and accepted by a government representative prior to shipment. 6.1.8 Objective
Quality Evidence (OQE) - The quantitative and qualitative data of all mechanical, chemical, and performance tests performed (as required by the applicable specification, drawing, or
purchase document) to prove that the material supplied conforms to the specified requirements. 6.1.9 Surface Discontinuity - Any surface irregularity, marking, or localized change in
physical character of the surface, other than dimensional, that exists infrequently at one or several places. (Examples: burrs, dents, nicks, scratches, gouges, pits, center-punches,
scribes, and tool marks) Surface discontinuities less than 0.005-inch in depth are acceptable provided they do not violate any other design requirements specified in this
Contract/Purchase Order. 6.1.10 Traceability Code - A code or number providing traceability to the actual chemical and mechanical properties of the specified heat, batch, or form from
which the material originated. 6.1.11 Verification - An examination performed to determine compliance with a specific requirement. 6.1.12 Nonconformance - A nonconformance is defined as
affecting or violating the following: - The requirements of this contract/purchase order. - Contractually invoked drawings (i.e. envelope dimensions, interface dimensions with mating
parts/equipment, center of gravity, weights, piece part identification, material, etc.). - Contractually invoked federal, military, or commercial specifications and/or standards. - Form,
fit, function, performance to contract requirements, reliability, maintainability, interchangeability, safety of personnel or equipment, or additional cost to the Government. 6.1.13
Waiver - A written authorization to accept an item, which during manufacture, or after having been submitted for Government inspection or acceptance, is found to depart from specified
requirements, but nevertheless is considered suitable for use as is or after repair by an approved method. 6.1.14 Deviation - A specific written authorization (granted prior to the
manufacture of an item) to depart from a particular requirement(s) of an items current approved configuration documentation for a specific number of units or a specified period of time,
and to accept an item which is found to depart from specified requirements, but nevertheless is considered suitable for use "as is" or after repair by an approved method. 6.1.15 Critical
Waiver/Deviation - This waiver/deviation consists of a departure involving safety. 6.1.16 Major Waiver/Deviation - This waiver/deviation consists of a departure involving: - Performance -
Interchangeability, Reliability, Survivability, Maintainability, or Durability of the item or its repair parts - Health or Safety - Effective Use or Operation - Weight, Stability, or
Structural Integrity - System design parameters as schematics, flows, pressures or temperatures - Compartment arrangements or assigned function 6.1.17 Minor Waiver/Deviation - This
waiver/deviation consists of a departure which does not involve any of the factors listed as critical or major. 6.1.18 Engineering Change (EC) - A change to the current approved
configuration documentation of a configuration item at any point in the life cycle of the item. 6.1.19 Engineering Change Proposal (ECP) - A proposed Engineering Change and the
documentation by which the change is described, justified, and submitted to the Government for approval or disapproval. 6.1.20 Class I ECP - A class I ECP is approved by the Governments
Configuration Control Board and authorized with a contract modification. 6.1.21 Class II ECP - A class II change is typically reviewed for concurrence in classification by the local
government representative, unless otherwise specified elsewhere in the contract/purchase order. 6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S.
Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those
documents and drawings. 6.2.1 There are 7 (seven) separate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A...
approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their
contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander,
Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data
in accordance with OPNAVINST 5510.161. 6.3 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides
product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and
other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are
required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications,
Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable
societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head
Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To
Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for
the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including
Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa.
17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding
Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing
Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and
Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.4 Recent Updates - A short description of recent updates to the technical requirements
of this item are listed below, along with an implementation date for each issue. The notes below are only a generic quick reference and are provided for convenience only, detailed
requirements will be defined elsewhere in the technical sections of this Contract/Purchase Order. ;- 10/20/2016 - Updated ECDS URL - Feb 26 2009 - Clarified testing and certs only apply
to pieces listed - Oct 29 2010 - Added Sampling Std for LI In-Process testing - Dec 20 2022 - Removed requirement for vender to submit Waivers/Deviations in ECDS - Jan 05 2012 - Added
WAWF to forward Approved Waivers/Deviations with final OQE - Sep 30 2008 - Thread Inspection Requirements were clarified - Dec 17 2011 - Moved Quality Assurance Text location for
Readability - Apr 15 2009 - Clarified the sample size for large and small lot sizes - Jan 19 2011 - Added notification of DCMA upon contract award - May 02 2009 - Added Lubricants and
Sealants to the C of C - Aug 27 2014 - Took out contractors phone number requirement - Dec 01 2011 - Moved "Notes to DCMA QAR" to QA Section - Jan 5 2017 - ECDS/CSD info was added to
Definitions in the Notes section; DATE OF FIRST SUBMISSION=ASREQ Paragraph 10.4 of DI-QCIC-81110 does not apply. DATE OF FIRST SUBMISSION=ASREQ Block 12 - Certification data must be
submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in
WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil No material is to be shipped prior to the
receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply. Block 12 - Certification data must be
submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in
WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil No material is to be shipped prior to the
receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted
to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as
follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil No material is to be shipped prior to the receipt of
Acceptance.