NETWORK CONTRACTING OFFICE 2 Albany/Bath/Bronx/Canandaigua/Northport/Syracuse Medical Centers Hudson Valley/New Jersey/New York Harbor Healthcare Systems WNY Upstate New York Healthcare
System STATEMENT OF WORK Fisher House Renovate Bldg. 56 VAMC, 113 Holland Ave., Albany, NY I. BACKGROUND AND PROJECT DESCRIPTION The Samuel S. Stratton Albany VA Medical Center Fisher
House is currently seeking to renovate the interior of the Fisher House. The items for the Scope of Work in the Fisher house include, but not limited to the following: Contractor shall
provide all labor, materials, and travel to renovate seven (7) bedrooms this will include Removing @2,700 sq ft of carpet and installing prefinished hardwood flooring. Patch and paint
@400 sq ft of ceilings Patch and paint @12,000 sq ft of walls Paint 20 doors. Replace light fixtures Install and finish @550 lin ft of baseboard and shoe base trim Renovate existing
bathrooms 1 in each room. To include Remove existing tub enclosure. Install walk in shower. Install new shower trim kit Tile @450 sq ft of floors Install new vanity. (Handicap accessible
in rooms 1 and 2) Install new toilet Install new faucet Remove wallpaper (rooms 6 and 7) Repair wallboard as necessary Install new baseboard and shoe base trim Paint @1,900sq ft of wall
Paint @400 sq ft of ceilings Paint @9-bathroom doors Install new bath accessories Install new glass shower doors installed. Contractor shall provide all labor, materials, and travel to
renovate Upstairs hallway and first floor common areas. This will include. Remove wallpaper and chair rail in Foyer and Dining Room Patch and paint @1,300 sq ft of walls. Patch and paint
@500 sq ft of ceilings. Refinish @1400 sq ft of hardwood flooring. The contractor shall work with the Fisher House Interior Designer for appropriate selection of higher-end finishes and
light fixtures to accomplish a warm, more comforting atmosphere to the area. II. ADDITIONAL INFORMATION The Contractor shall provide all labor, supervision, and materials necessary to
perform the work as indicated in this scope of work, and project specifications attached. The Contractor shall make every effort to maintain the existing conditions that are not part of
the project. In addition to following FAR 52.236-9, Protection of Existing, Structures, Equipment, Utilities, and Improvements the Contractor shall remove or alter existing work in such a
manner to prevent injury or damage to any portions of the existing work, which is to remain. The Contractor shall repair or replace portions of the existing work, which have been altered
or damaged during construction operations to match existing or adjoining work, as approved by the Contracting Officer and at no cost to the government. At the completion of operations,
the existing work shall be in a condition equal to or better than that which existed before new work started. The Contractor shall verify all existing conditions on the site and in the
facility infrastructure that the proposed project may affect before the commencement of any construction. This includes but is not limited to, verifying the locations and elevations of
existing utilities, verifying site items as shown on the any applicable project drawings and taking appropriate field measurements. The government will not be held responsible for bidding
errors made or the failure to adequately inspect the job site for existing conditions, dimensions or to fully review manufacturer s information related to the project. All bidders are
strongly encouraged to inspect the job site prior to submitting bids. All discrepancies between the specifications and manufacturer s recommendations shall be brought to the attention of
the Contracting Officer s Representative prior to the commencement of work. The Contractor shall abide by the Scope of Work regardless of whether or not a manufacturer calls for the task,
level of preparation, etc. in question. The only exception is where the Contracting Officer agrees in writing that the item or task specifically voids a manufacturer s warranty and may be
omitted. A credit for the work not performed may be due to the government in such circumstances at the discretion of the Contracting Officer. For this project the C&A requirements do
not apply, and that a Security Accreditation Package is not required. III. SCHEDULES The work shall be substantially complete no later than 90 calendar days after receipt of the Notice to
Proceed unless otherwise agreed to in writing with the Contracting Officer. Provide the government a construction project timeline that includes but is not limited to submittal submission
dates, start of construction, milestones, completion of construction, and final hand over to government for occupancy that is less than or equal to 90 calendar days. IV. CONTRACTOR
PERFORMANCE Use good construction practices and standards in completing all work. All work shall be performed by laborers that are fully versed and experienced in the trade that they are
employed to do. Coordination with the government, of project and scheduled items, shall be a regular occurrence, initiated by the Contractor. The VA s Contracting Officer s Representative
shall monitor all work done during the project duration. The Contractor will immediately correct any work that the Contracting Officer s Representative deems unacceptable or not in
accordance with the plans or specifications.