Description
CONTACT INFORMATION|4|n792.02|lpe|2156972582|timika.nicholson@navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY
REQUIREMENT|8|x|||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|invoice and receiving reports|n/a|n/a|n00383|n/a|n/a|n/a|n/a||||||||| NAVY USE OF ABILITYONE SUPPORT
CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|365 days|60 days after the last delivery
under this contract ||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC (NOV23)|5|||||| ALTERNATE
A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2023))|5|||||| BUY
AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13|336413|1250|||||||||||| FACSIMILE PROPOSALS
(OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| This requirement will be limited to Government approved
sources. This solicitation will be using competitive procedures. Submission of an offer indicates acceptance of, and compliance with, the requirement to be an approved source for this
item. Offers will be evaluated based on the non-price factors of capacity, delivery, and past performance, and when combined, those non-price factors being more important than price.
Proposal submission should include non-price factors and price on one document. Offerors are required to submit recent (within the past three years) and relevant past performance
references with the submission of their offer. Relevant past performance demonstrates the offerors past performance manufacturing (or repair) an item of the same or similar scope,
complexity and magnitude relative to the instant requirement. The submission of past performance should be limited to three relevant contracts. Any contract beyond three years will not be
accepted as relevant past performance. 1. SCOPE 1.1 Container shell material is ;PLASTIC; . 1.2 Manufacturing process is ;MOLDED AND FABRICATION; . 1.3 PRE-AWARD / POST AWARD
REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous
sources, a post-award conference may be recommended. 1.4 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;Aviation Supply Office; drawing
number ( ;80132; ) ;13414-017; , Revision ;Latest; and all details and specifications referenced therein. 1.5 Unless expressly provided for elsewhere in this clause, equipment such as
fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be
provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing
thereof that may be contained in any drawing or referenced specification. 1.6 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show
compliance with IPC/EIAJ-STD-001C. 1.7 When discrepancies exist between these requirements and those on current manufacturers drawings,contact code ;Buyer on Page One; or code N241.10 2.
APPLICABLE DOCUMENTS DRAWING DATA=13414 |80132|Q | |A| | | | DRAWING DATA=15064 |80132|H | |A| | | | 3. REQUIREMENTS 3.1 Reference to Cadmium plating shall be deleted and the following
substituted: "Finish shall be electrodeposited alkaline Zinc-Nickel Alloy in accordance with ASTM B 841 Class 1, Type B, Grade 3." 3.2 One third (1/3) unit of desiccant (MIL-D-3464, Type
II nondusting) per cubic foot of container interior volume shall be placed in desiccant holder of each container at time of shipment. Contact code ;Buyer on Page One; or code N241.10 to
arrange for First Article Test location When a First Article is required, the contractor shall submit a paper copy of the drawings (size 11" X 17"), contracts and approved ECPs ECOs,
deviations waivers, and modifications in the records recepticle or inside the container submitted for the First Article. FOR FMS CONTAINER BUYS NAMEPLATE "PROPERTY OF" STATEMENT WILL
DIFFER. CONTACT BUYER ON PAGE 1 OF CONTRACT FOR UPDATED NAMEPLATE INFORMATION. 4. QUALITY ASSURANCE 4.1 The tests to be performed under the First Article approval clause (FAR 52.209-4) of
the contract are listed below. 4.1.1 Dimensional test (special) ;Applies; 4.1.2 Requirements of: ;(80132) 13414-017 and sub drawings is applicable; 4.1.3 Form: ;applies; 4.1.4 Fit:
;applies; 4.1.5 Function ;applies; 4.1.6 Compliance with drawing ( ;80132; ) ;13414-017; , Revision ;latest; and specifications referenced therein. 4.2 In addition to the above tests, the
First Article(s) to be delivered hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with contract requirements requirements. 4.3 The
contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during testing. 4.4 The cost of the Government testing effort set forth in this
solicitation is estimated to be $ ;10000; for the first article testing. This cost factor will be added, for solicitation purposes, to the price of all offerors for whom the government
will require such testing. 4.5 Disposition of FAT samples 4.5.1 ;zero; Sample(s) shall not be returned to the contractor because they shall be destroyed during testing. 4.5.2 ;All; Unless
otherwise provided for in the contract, sample(s) shall be returned to the contractor and may be considered as production items under the contract provided the sample(s) can be
refurbished to ready for issue condition and provided the sample(s) have inspection approval from the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other
units required under the contract have been produced and are ready for shipment. ;N/A; Sample(s) shall be returned to the contractor but shall not be considered as production due. 4.6
Test Sample Coating Instructions 4.6.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative.This paragraph does NOT apply to shipping containers. 4.7
FAT Approval Criteria 4.7.1 FAR 52.209-4 applies (A) The contractors shall deliver ;One (1); ; unit(s) of the following CAGE ( ;80132; ; ) Part Number ;13414-017; ; , Revision ;Latest; ;
within ;120; ; calendar days from the date of this contract to the Government at ;Contact Buyer on Page One; ; Marking of test sample(s) shipping container shall be as follows, citing
this contract number: "FOR FIRST ARTICLE TESTING. NOT RFI MATERIAL. DO NOT TAKE UP IN STOCK CONTRACT NUMBER:____________" For First Article Test, the shipping documentation shall contain
this contract number and lot/item identification. The characteristics that the First Article must meet and the testing requirements are specified elsewhere in this contract. (B) Upon
shipment of First Article sample(s), two (2) copies of the Material Inspection and Receiving Report (DD Form 250) bearing the QARs signature and indication of preliminary inspection shall
be forwarded to the NAVICP- Philadelphia code cited in Block 10.a of SF33, with duplicate copies to NAVICP code 072 and to the designated test facility. The envelopes shall be clearly
marked: "DO NOT OPEN IN MAIL ROOM". Within ;90; ; days after receipt of the samples, the test site shall complete testing/evaluation and submit two (2) copies of their test report with
conclusions and recommendations to the NAVICP code cited in Block 10.a of the SF33. (C) Within ;120; ; calendar days after the Government receives the First Article, the contracting
officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval
shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall
state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government
request, shall submit an additional First Article for testing. After each request, the contractor shall make any necessary changes, modifications, or repairs to the First Article or
select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The
contractor shall furnish any additional First Article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this
First Article within the time limit specified in paragraph (B) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the
delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to deliver any First Article on time, or the contracting officer
disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract (F) Unless otherwise provided in
the contract, the contractor - (1) May deliver the approved First Article as part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed
or destroyed in testing: and (2) Shall remove and dispose of any First Article from the Government test facility at the contractors expense. (G) If the Government does not act within the
time specified in paragraph (B) or (C) above the contracting officer shall, upon timely written request from the contractor, equitably adjust under the changes clause of this contract the
delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) The contractor is responsible for providing operating and maintenance
instructions, spare parts support, and repair of the First Article during any First Article test. (I) Before First Article approval, the acquisition of materials or components for, or the
commencement of production of, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocable to this
contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government (J) The contractor shall produce both the First
Article and the production quantity at the same facility and shall submit a certification to this effect with each First Article. (K) The contractor shall provide specific written
notification to the procuring contracting officer informing him/her of the shipment of any article(s) furnished in accordance with this clause. Such notification must be addressed to the
attention of the NAVICP code specified in Block 10.a of the SF33, with copies to NAVICP code 072 and to the testing activity. Failure to provide such notification shall excuse the
Government from any delay in performing First Article Testing and informing the contractor of the results thereof. (L) Fourteen (14) days prior to shipment of First Article Samples, the
contractor shall notify the designated test facility in writing of the anticipated shipping date, with an information copy to the PCO, NAVICP Philadelphia, Attn: (Cite code found in Block
10.a of the SF33). The contractor shall also arrange for preliminary inspection of test samples by the DCMC/QAR. 4.8 Alternate Offers - Waiver of First Article Approval Requirements. (The
following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the
solicitation, the Naval Inventory Control Point reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical
production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence
with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for
this requirement is the same as used for the previous production run Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer,
stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and
accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or
waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the
making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of
First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First
Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver
of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval
Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of
calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the
offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offerors Proposed Alternate Delivery Schedule (Based on
Waiver of First Article Approval Requirements) Within Days: Item No. _______________ Quantity:_______ After Date of Contract:__________ ALL COSTS AND RESPONSIBILITIES RELATED TO THE FIRST
ARTICLE TEST SUBMISSION CONTAINER SHIPMENT TO AND FROM THE FIRST ARTICLE TEST FACILITY ARE TO BE BORNE BY THE CONTRACTOR. Instrumented drop tests are not required for these containers.
The design has been proven over years of use and the FAT should test the integrity of the first article rather than the design capability. 4.9 100% PRODUCTION LEAK TEST. Each container
shall be prepared for testing by sealing all breathing devices and inserting suitable pressurized fittings and gauges. The container shall be closed and sealed in a normal manner. Each
container, uninstrumented and without dummy load, shall then be subjected to a single 18 inch flat drop. The Pneumatic-Pressure Technique of Method 5008 of Federal Test Method Standard
No. 101C shall be used to detect leakage. An initial setting equal to 0.5 + 0.1 - 0 PSIG shall be used. After stabilization, pressure shall be monitored for thirty minutes. Any loss in
pressure over a 30 minute period that exceeds 25% of the stabilized pressure shall be cause for rejection; tests shall be conducted to ascertain sources of leaks and corrective action
taken. Any deformation of the container shell while pressurized which is greater than three-quarters of an inch beyond its point at ambient pressure shall also be cause for rejection.
WARNING Container may explode or fasteners may fail during test. Use protective barriers to avoid injury to personnel. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN
THE SCHEDULE 6. NOTES - NOT APPLICABLE Aggressive Industries is an approved source for this container and is waived ofFAT requirements. Their P/N is (0JPL8) 700-001.