Professional Land Surveying - USDA Natural Resources Conservation Service (Соединенные Штаты Америки - Тендер #51460331) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Соединенные Штаты Америки (другие тендеры и закупки Соединенные Штаты Америки) Номер конкурса: 51460331 Дата публикации: 16-02-2024 Источник тендера: Государственные закупки США |
||
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The United States Department of Agriculture (USDA), Farm Production and Conservation (FPAC) Business Center, Acquisition Division on behalf of USDA Natural Resources Conservation Service (NRCS) is requesting A&E qualification information (SF-330 Architect-Engineer Qualifications) of Professional Land Surveyors for the purpose of providing easement boundary surveys and re-surveys of easements under the Agricultural Conservation Easement Program components: Wetland Reserve Easements (WRE), Emergency Watershed Protection Program-Floodplain Easements (EWPP-FPE); Health Forest Reserve Program (HFRP); and all Farm Bill 2018 Regional Conservation Partnership Program (RCPP) U.S. held easements, RCPP-HRFP, and RCPP-WRE easements.
The Agricultural Conservation Easement Program helps landowners, land trusts, and other entities protect, restore, and enhance wetlands or protect working farms and ranches through conservation easements. The programs are voluntary, have annual enrollment periods, and include additional funding through the Inflation Reduction Act for the next five years.
As an integral part of the easement acquisition process, the boundary of a proposed easement area must be delineated in a manner that is suitable for recording. The exact recording requirements will vary from State to State. At a minimum, NRCS policy, NRCS easement programs land survey specifications, and State code must be met. See Attachments 1A and 1B.
SF-330 Architect-Engineer Qualifications received as result of this request will be maintained in accordance with FAR Subpart 36.603 and will be available for review by any USDA Contracting Officer to meet USDA Architect & Engineer (A&E) requirements for boundary surveying within states/territories of the United States.
At this time, the following states are anticipating requirements for boundary surveying:
Alabama Maine North Dakota
Arkansas Maryland Ohio
California Massachusetts Oklahoma
Connecticut Michigan Oregon
Delaware Minnesota Pennsylvania
Florida Mississippi Rhode Island
Georgia Missouri South Carolina
Idaho Montana South Dakota
Illinois Nebraska Tennessee
Indiana New Hampshire Texas
Iowa New Jersey Utah
Kansas New York Vermont
Kentucky North Carolina Wisconsin
Louisiana
SF-330 Qualifications received will be initially classified with respect to the firm’s location, and state of Professional Land Surveyor (PLS) licensure. Firms must have a minimum of one Professional Land Surveyor currently licensed in the state for which they are seeking consideration.
NRCS state program offices are developing their individual requirements: number of anticipated surveys, their geographic location in the state, and total anticipate dollar value.
It is anticipated that awards will be made on a state-by-state basis following formal selection procedures for architect-engineer services anticipated to be over the Simplified Acquisition Threshold ($250,000) in accordance with FAR 36.602; and following the short selection procedures for awards anticipated under the Simplified Acquisition Threshold in accordance with FAR 36.602-5.
When formal selection procedures are anticipated, an additional notice with specific details and evaluation criteria will be posted to this site. SF330 qualifications received as a result of this general notice, as well as any received as a result of the additional and specific public notice will be evaluated in accordance with 36.602-1 and detailed in the notice.
In cases where the short selection procedures can be utilized, and there are an adequate number of qualifications on hand, no additional notice will be made. Review and evaluation of the SF-330s submitted in response to this solicitation will be conducted by a Technical Evaluation Board in accordance with the evaluation criteria below, listed in order of importance:
Discussions will be held with at least the three (3) most highly qualified firms identified, and a selection report prepared recommending the three most highly qualified firms in order of preference. Negotiations will then commence with the firm determined to be most highly qualified. If a mutually satisfactory contract cannot be negotiated, negotiations will be held with the second most qualified firm identified, and so on.
This short selection process may be used to meet urgent needs, within the simplified acquisition threshold, until a more formal process can be completed or to accompany existing contracts already in place.
AE data files will be maintained in a secure database maintained by the FPAC Business Center, Acquisition Division and be protected as Source Selection Information in accordance with FAR 3.104-4.
SF330s submitted are valid for one year from the date of notification that the firm has been added to the database. Firms are encouraged to update their data annually by responding to an annual notice to provide new and/or updated qualifications. Qualifications included in the database will be retained for three years. An AE firm’s data will be removed and destroyed after three years if they have not resubmitted/updated their SF330, or the AE firm responds to the Contracting Officer that they no longer wish to be included.
Submission instructions
Firms wishing to submit qualifications should submit:
Attachments: Attachment 1A - Boundary Survey Specification
Attachment 1B - Boundary Re-survey Specification
SF330 form Part I and Part II