Description
CONTACT INFORMATION|4|N792.06|2C1|215-697-0275|patrick.j.horan23.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY
REQUIREMENT|8|x|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO
TYPE||TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF
SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE
AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC (NOV23)|5|||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| BUY AMERICAN-FREE TRADE
AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2023))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL
REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13|336413|1250|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS,
ANDENERGY PROGRAM USE (APR 2008))|2||x| NAVSUP WSS has been granted a class deviation (CL-00-203) that permits us to use the award forms currently available in our automated procurement
system instead of the SF 1449 when conducting procurements for commercial items. This procurement is being conducted in accordance with FAR Part 12, Acquisition of Commercial Products.
Information appearing on the face of the DD Form 1155 or SF 26 that conflicts with clauses or provisions contained elsewhere in this solicitation shall be disregarded. Addendum to FAR
52.212-4 Contract Terms and Conditions Commercial Products Under paragraph(a) "Inspection and Acceptance" add the following: 1. FAR Clause 52.246-2 Inspection of Supplies-Fixed Price
applies as amended herein. All product audits performed at the discretion of the DCMA QAR shall be conducted by witnessing contractor inspections or tests on a non-interference basis. 2.
The contractor shall maintain a quality system that addresses the elements of ISO9001-2000/AS9100B, Quality System Model for Quality Assurance in Design/Development, Production,
Installation and Servicing, and a calibration system that addresses the elements of ISO-10012-1, ANSI/NCSL Z540 or an equivalent program approved by the Navy. 3. The government reserves
the right to assess the contractors compliance to its documented quality system throughout the performance of this contract. The quality system procedures, planning, and all other
documentation, media, and data which comprise the quality system shall be made available to the government for their review and use. The acceptance of non-conforming suppliessupplies is a
prerog is a prerogative of and shall be as prescribed by the government. The government reserves the right to disapprove the quality system or portions there of when it fails to meet its
intended objectives. 4. The Contractor shall not make any configuration changes, engineering changes or part number changes to the contract/purchase order items, including, but not
limited to, the items hardware, software or firmware, unless approved by the Procurement Contracting Officer (PCO). In addition, approval by the appropriate technical authority may also
be required. Guidance on how to submit a proposed engineering or part number change may be obtained from the PCO. 5. The Contractor shall not manufacture any item for acceptance by the
Government that incorporates a known departure from technical or contractual requirements unless a request for a deviation has been approved. Authorized deviations are a temporary
departure from the requirements only and do not authorize a change to the items configuration baseline. Any deviation, major or minor, must be approved by the PCO prior to acceptance. ALL
CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERSDELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT
WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENTS ACCEPTANCE OF THE CONTRACTORS PROPOSAL
CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred.