Description
CONTACT INFORMATION|4|N743.49|WVG|7176052147|benjamin.t.spangler.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY
REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE
AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|N39040 -
Certifications, S4306A - Material |N50286|TBD|133.2|N/A|N/A|N39040 - Certifications |N/A |N/A|SEE DD FORM 1423 |PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL BENJAMIN.T.SPANGLER.CIV@US.NAVY.MIL|
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year
from date of delivery.|One year from date of delivery.||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC
(JAN2023))|3|||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY
AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (DEC 2022))|3|||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL
REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13|333613|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
This amendment is issued to extend the closing date to 17NOV23. 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2.
Portsmouth NSYs DODAAC has changed from N00102 to N50286. Any reference toN00102 within this order should be updated to N50286. 3. All contractual documents (i.e. contracts, purchase
orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail,
transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Governments acceptance of the contractors proposal constitutes bilateral agreement to "issue"
contractual documents as detailed here in. 4.The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance
of certification CDRLS 6 working days after receipt PRODUCTION RADIOGRAPHY (PR) 135 DAYS AFTER APPROVAL OF RSS SD APPROVAL OF PR 30 DAYS AFTER RECEIPT Weld procedure and qual data 120
days adc LT Approval of weld procedures and qual data 60 days after receipt Final delivery of material (365 days) 5.NAVSUP WSS Mech will be considering past performance in the evaluation
of offers. See Clause 252.213-7000. 6. Drawings can be accessed thru: SAM.gov 7. This order is issued pursuant to Emergency Acquisition Flexibilities (EAF). 1. SCOPE 1.1 The material
covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in
serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I,
Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the
event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence.
Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Identification of Classified Documents
- This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD
Form 254). The classified documents and security level are: ;830-6404016 - CONFIDENTIAL; 2.3 Applicable Documents - The document(s) listed below form a part of this contract/purchase
order including modifications or exclusions. 2.3.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or
newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/.
This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer
specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every
contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are
listedwithin CSD155 or elsewhere within this contract. 2.3.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an
award is made. 2.3.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING
DATA=ERB553-1003-MF03450 |96169| A| |D|0001 | A|49998|0032647 DRAWING DATA=ERB553-1003-MF03450 |96169| A| |D|0001.A | A|49998|0041250 DRAWING DATA=ERB553-1003-MF03450 |96169| A| |D|0002 |
A|49998|0018549 DRAWING DATA=ERB553-1003-MF03450 |96169| A| |D|0003 | A|49998|0020330 DRAWING DATA=ERB553-1003-MF03450 |96169| A| |D|0004 | A|49998|0034988 DRAWING
DATA=ERB553-1003-MF03450 |96169| A| |D|0004.A | A|49998|0014187 DRAWING DATA=ERB553-1003-MF03450 |96169| A| |D|0005 | A|49998|0053007 DRAWING DATA=ERB553-1003-MF03450 |96169| A| |D|0006 |
A|49998|0042477 DRAWING DATA=ERB553-1003-MF03450 |96169| A| |D|0007 | A|49998|0036752 DRAWING DATA=ERB553-1003-MF03450 |96169| A| |D|0008 | A|49998|0052601 DRAWING
DATA=ERB553-1003-MF03450 |96169| A| |D|0009 | A|49998|0038926 DRAWING DATA=ERB553-1003-MF03450 |96169| A| |D|0010 | A|49998|0038916 DRAWING DATA=ERB553-1003-MF03450 |96169| A| |D|0011 |
A|49998|0049740 DRAWING DATA=ERB553-1003-MF03450 |96169| A| |D|0012 | A|49998|0032950 DRAWING DATA=ERB553-1003-MF03450 |96169| A| |D|0013 | A|49998|0027549 DRAWING
DATA=ERB553-1003-MF03450 |96169| A| |D|0014 | A|49998|0044189 DRAWING DATA=ERB553-1003-MF03450 |96169| A| |D|0015 | A|49998|0005209 DRAWING DATA=ERB553-1003-MF03450 |96169| A| |D|0016 |
A|49998|0011895 DRAWING DATA=ERB553-1003-MF03450 |96169| A| |D|0017 | A|49998|0008180 DRAWING DATA=ERB553-1003-MF03450 |96169| A| |D|0018 | A|49998|0018601 DRAWING
DATA=ERB553-2200-MF00140 |96169| A| |D|0001 | A|49998|0056831 DRAWING DATA=ERB553-2200-MF00140 |96169| A| |D|0002 | A|49998|0036178 DRAWING DATA=ERB553-2200-MF00140 |96169| A| |D|0003 |
A|49998|0067084 DRAWING DATA=ERB553-2200-MF00140 |96169| A| |D|0004 | A|49998|0020551 DRAWING DATA=ERB553-2200-MF00140 |96169| A| |D|0005 | A|49998|0041619 DRAWING
DATA=ERB553-2200-MF00140 |96169| A| |D|0006 | A|49998|0036523 DRAWING DATA=ERB553-2200-MF00140 |96169| A| |D|0007 | A|49998|0039219 DRAWING DATA=ERB553-2200-MF00140 |96169| A| |D|0008 |
A|49998|0037181 DRAWING DATA=ERB553-2200-MF00140 |96169| A| |D|0009 | A|49998|0017405 DRAWING DATA=ERB553-2200-MF00181 |96169| A| |D|0001 | A|49998|0050954 DRAWING
DATA=ERB553-2200-MF00181 |96169| A| |D|0002 | A|49998|0026818 DRAWING DATA=ERB553-2200-MF00181 |96169| A| |D|0003 | A|49998|0070451 DRAWING DATA=ERB553-2200-MF00181 |96169| A| |D|0004 |
A|49998|0037409 DRAWING DATA=ERB553-2200-MF00181 |96169| A| |D|0005 | A|49998|0024070 DRAWING DATA=ERB553-2200-MF00181 |96169| A| |D|0006 | A|49998|0027789 DRAWING
DATA=ERB553-2200-MF00181 |96169| A| |D|0007 | A|49998|0055237 DRAWING DATA=ERB553-2200-MF00181 |96169| A| |D|0008 | A|49998|0040651 DRAWING DATA=ERB553-2200-MF00181 |96169| A| |D|0009 |
A|49998|0041691 DRAWING DATA=ERB553-2200-MF00181 |96169| A| |D|0010 | A|49998|0039731 DRAWING DATA=ERB553-2200-MF00181 |96169| A| |D|0011 | A|49998|0039657 DRAWING
DATA=ERB553-2200-MF00181 |96169| A| |D|0012 | A|49998|0033413 DRAWING DATA=ERB553-2200-MF00181 |96169| A| |D|0013 | A|49998|0007370 DRAWING DATA=ERB553-2200-MF00181 |96169| A| |D|0014 |
A|49998|0019031 DRAWING DATA=ERB553-2200-MF00181 |96169| A| |D|0015 | A|49998|0014926 DRAWING DATA=ERB553-2200-MF01530 |96169| A| |D|0001 | A|49998|0033997 DRAWING
DATA=ERB553-2200-MF01530 |96169| A| |D|0001.A | A|49998|0045157 DRAWING DATA=ERB553-2200-MF01530 |96169| A| |D|0002 | A|49998|0021918 DRAWING DATA=ERB553-2200-MF01530 |96169| A| |D|0003 |
A|49998|0023584 DRAWING DATA=ERB553-2200-MF01530 |96169| A| |D|0004 | A|49998|0020593 DRAWING DATA=ERB553-2200-MF01530 |96169| A| |D|0005 | A|49998|0045293 DRAWING
DATA=ERB553-2200-MF01530 |96169| A| |D|0006 | A|49998|0042351 DRAWING DATA=ERB553-2200-MF01530 |96169| A| |D|0007 | A|49998|0035542 DRAWING DATA=ERB553-2200-MF01530 |96169| A| |D|0008 |
A|49998|0016157 DRAWING DATA=ERB553-2200-MF03425 |96169| A| |D|0001 | A|49998|0031704 DRAWING DATA=ERB553-2200-MF03425 |96169| A| |D|0001.A | A|49998|0043765 DRAWING
DATA=ERB553-2200-MF03425 |96169| A| |D|0002 | A|49998|0016566 DRAWING DATA=ERB553-2200-MF03425 |96169| A| |D|0003 | A|49998|0020977 DRAWING DATA=ERB553-2200-MF03425 |96169| A| |D|0004 |
A|49998|0015831 DRAWING DATA=ERB553-2200-MF03425 |96169| A| |D|0004.A | A|49998|0011033 DRAWING DATA=ERB553-2200-MF03425 |96169| A| |D|0005 | A|49998|0069238 DRAWING
DATA=ERB553-2200-MF03425 |96169| A| |D|0006 | A|49998|0015814 DRAWING DATA=ERB553-2200-3G00008 |96169| A| |D|0001 | A|49998|0029799 DRAWING DATA=ERB553-2200-3G00008 |96169| A| |D|0002 |
A|49998|0030924 DRAWING DATA=ERB553-2200-3G00008 |96169| A| |D|0003 | A|49998|0007940 DRAWING DATA=ERB553-2200-3G00008 |96169| A| |D|0004 | A|49998|0015367 DRAWING
DATA=ERB553-2200-3G00008 |96169| A| |D|0005 | A|49998|0013292 DRAWING DATA=1385861 |53711| H| |D|0001 | H|49998|0762439 DRAWING DATA=6404016 |53711| B| |F|0001 | B|00026|0000000 DRAWING
DATA=7409397 |53711| A| |D|0000.A | A|49998|0033695 DRAWING DATA=7409397 |53711| A| |D|0001 | A|49998|0064297 DRAWING DATA=7409397 |53711| A| |D|0002 | A|49998|0030482 DRAWING
DATA=7409397 |53711| A| |D|0003 | A|49998|0012305 DRAWING DATA=7409397 |53711| A| |D|0004 | A|49998|0013958 DRAWING DATA=7409397 |53711| A| |D|0005 | A|49998|0028080 DRAWING DATA=7409397
|53711| A| |D|0006.1 | A|49998|0063000 DRAWING DATA=7409397 |53711| A| |D|0006.2 | A|49998|0065929 DRAWING DATA=7409397 |53711| A| |D|0006.3 | A|49998|0063879 DRAWING DATA=7409397 |53711|
A| |D|0006.4 | A|49998|0063933 DRAWING DATA=7409397 |53711| A| |D|0006.5 | A|49998|0017595 DRAWING DATA=7409397 |53711| A| |D|0006.6 | A|49998|0041814 DRAWING DATA=7409397 |53711| A|
|D|0007.1 | A|49998|0033641 DRAWING DATA=7409397 |53711| A| |D|0007.2 | A|49998|0037140 DRAWING DATA=7409397 |53711| A| |D|0007.3 | A|49998|0033499 DRAWING DATA=7409397 |53711| A|
|D|0007.4 | A|49998|0035238 DRAWING DATA=7409397 |53711| A| |D|0008 | A|49998|0013266 DRAWING DATA=7409397 |53711| A| |D|0009 | A|49998|0050808 DRAWING DATA=7409397 |53711| A| |D|0010 |
A|49998|0072086 DRAWING DATA=7409397 |53711| A| |D|0011 | A|49998|0155498 DRAWING DATA=7409397 |53711| A| |D|0012 | A|49998|0110719 DRAWING DATA=7409397 |53711| A| |D|0013 |
A|49998|0107679 DRAWING DATA=7409397 |53711| A| |D|0014 | A|49998|0121411 DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01|
DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=QQ-N-281 | | |D |851023|A|2 | | DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | | DOCUMENT REF DATA=MIL-STD-792 | |
|F |060519|A| | | DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=ASTM-E1417 | | | |160615|A| | | DOCUMENT REF DATA=ASTM-E1444 | | | |160601|A| | | DOCUMENT REF
DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=MIL-STD-2132 | | |D |080310|F| |01| DOCUMENT REF DATA=ASTM-D4066 | | | |130701|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A|
| | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-DTL-15024 | | |G |180303|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=QPL 25027
| | |17 |000207|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=A-A-59004 | | |B |181118|A| | |
DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=AIA/NAS NASM 17828 | | |1 |130430|A| | | DOCUMENT REF
DATA=AIA/NAS NASM 25027 | | |1 |121221|A| | | DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF
DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 ;The ball joint must be in accordance with NAVSEA drawing 596-7409397 Assembly A along with all Engineering
Reports provided, except as amplified or modified herein.; 3.2 ;NOTE: Reference to Note 47 on drawing 7409397 must be disregarded for Stud, Part Number 20.; 3.3 Material for Parts
Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Lower Body, Part Number 1;
Retainer, Part Number 2; Ball, Part Number 5; and Flange, Part Number 6 of drawing 7409397; Material - ;QQ-N-281, Class A, Form 2, Condition Forged, High Tensile and Stress Relieved; Part
- ;Stud, Continuous Thread, Part Number 20 of drawing 7409397; Material - ;MIL-DTL-1222, QQ-N-286, Hot Finished or Cold Drawn, Annealed and Age Hardened; PART - ;Self-Locking Nut, Part
Number 21 of drawing 7409397; MATERIAL - QQ-N-281, class A annealed (hot finished or cold drawn) or class B cold drawn. All material must be from the same class. SELF-LOCKING ELEMENT-
ASTM-D4066, Group 01, Class 1, Grade 1 3.4 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts
(if any) per applicable drawings is still required, but certifications are only required as listed below. Test - ;Visual and Dye Penetrant Inspection (final layer); Item - ;Joint Number
J2031; Performance - ;T9074-AS-GIB-010/271; Acceptance - ;MIL-STD-2035; Test - ;Hydrostatic testing; Item - ;Each Assembly; Performance - ;Note 7018 of drawing 7409397; Acceptance - ;Note
7018 of drawing 7409397; Attribute - Annealing and Age Hardening Item - ;Stud, Continuous Thread, Part Number 20 of drawing 7409397; Performance - QQ-N-286 Test - ;Liquid Penetrant
Inspection; Item - ;Stud, Continuous Thread, Part Number 20 of drawing 7409397; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222 Test - ;Dye
Penetrant Inspection for Non-Magnetic Grades; Item - ;Self-Locking Nut, Part Number 21 of drawing 7409397; Performance - T9074-AS-GIB-010/271 or ASTM-E1417/ASTM-E1444 (Method C solvent
removal techniques must not be used on thread) Acceptance - ;NASM25027; Test - Quality Conformance Tests Item - Self-Locking Nuts Performance - ;NASM25027; Acceptance - ;NASM25027;
Attribute - Certificate of Completion Item - Self-Locking Nut Nonmetallic Insert Performance - ;ASTM-D4066, Group 01, Class 1, Grade 1; Attribute - Certificate of Compliance Item -
Self-Locking Nuts Performance - This Certificate must state that self-locking nuts were manufactured by an approved source. Approved sources are those listed on QPL-25027 for the
appropriate fastener. This QPL may also be considered as approved sources for Heavy Hex self-locking nuts. Test - Ultrasonic Inspection on Starting Material Item - ;All Items requiring
certification made from QQ-N-286 with a diameter or minimum distance between parallel surfaces of 4 inches or greater of the starting material, or when required by a drawing or
specification invoked elsewhere in this contract; Performance - T9074-AS-GIB-010/271 or MIL-STD-2132, and QQ-N-286 Acceptance - QQ-N-286 Test - Non-Destructive Tests Item - ;Weld Repair
(as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification 3.5 Radiography is required on ;Joint Number J2031 and must
be identified to the weld joint; . 3.6 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where
pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure
tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest
multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off
to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing,
detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this
contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and
including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.7 Confidential
Hydrostatic Test Pressures - When test pressures are confidential, certification must reference ;830-6404016, Rev B; and the item number to which the item was tested in lieu of the actual
pressures. Any drawing requirement to mark the working pressure on the item does not apply and is strictly prohibited. 3.8 Chemours Company (formerly DuPont) Teflon Coating 850G-204 and
852G-201. Use of Chemours Company (formerly DuPont) Teflon Coating 851N-204 and 852N-201 is acceptable until exhausted - Teflon coating of ball(s) must be in accordance with general note
;7002 and 7003; of drawing ;7409397; . 3.8.1 Naval Ordnance Systems Command OD 10362 First Revision dated 15 Aug 1961 is provided by Contract Support Library Reference Number CSD018 in
ECDS at https://register.nslc.navy.mil/ 3.8.2 CSD099 provides guidance for acceptance/rejection of teflon-coated valve balls after valve assembly production testing. 3.9 Ball Spherical
Surface Waviness - Unless otherwise specified on drawing, all sealing area surfaces must have a spherical surface waviness which does not exceed 0.0005 inches of height per inch of
spherical surface. Roughness and waviness ratings must apply in a direction which yields the maximum rating, normally perpendicular to the lay. 3.10 ;Surface waviness must be verified
prior to Teflon coating.; 3.11 K-MONEL Fasteners - Material must be heat treated per QQ-N-286. 3.11.1 Fasteners that have been hot or cold headed or roll threaded must be solution
annealed followed by age hardening subsequent to all heading and thread rolling operations. The mechanical properties on certifications must be actual properties of the annealed and age
hardened material and must meet the requirements of QQ-N-286. 3.11.2 QQ-N-286 fasteners that have been headed and/or roll threaded must not beage hardened unless the material has been
solution annealed subsequent to the heading and threading operations. Threads formed after the final age hardening heat treatment must be cut or ground only. 3.12 K-MONEL Fasteners -
K-MONEL externally threaded fasteners must have mechanical properties determined in accordance with MIL-DTL-1222. Test results must include Tensile, Yield, Elongation and Hardness as
required by MIL-DTL-1222. (The Hardness tests must be performed on a full size fastener.) 3.12.1 Studs require an Axial Tensile test in accordance with MIL-DTL-1222. 3.12.2 Headed
fasteners require a Wedge Tensile test as specified elsewhere in this contract/purchase order. 3.13 Internal Threads - All internal threads must be formed by cutting. Cold forming of
internal threads is not acceptable. 3.14 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and
inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.14.1 System 21
of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.14.2 For Navy
and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing
specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System
22, such as certain thread types of MIL-DTL-1222. 3.14.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not
applicable to the specified inspection system. 3.15 Thread Lubricant - Thread lubricants containing molybdenum disulfide must not be used on this material. Bacteria in water, especially
seawater, causes molybdenum disulfide to break down. The by-products of the breakdown form compounds which attack the fasteners. Anti-galling compound A-A-59004 must be used as a
replacement when thread lubricant is required for assembly. 3.16 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications.
When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for
inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and
tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded
from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at
https://register.nslc.navy.mil/ 3.17 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test of QQ-N-286 must be performed by one of the following laboratories:
Huntington Alloys, a Special Metals Company Attn: Bill Bolenr 3200 Riverside Drive Huntington, WV 257059 Phone: (304) 526-5889 FAX: (304) 526-5973 Metallurgical Consultants, Inc. Attn: W.
M. Buehler 4820 Caroline PO Box 88046 Houston, TX 77288-0046 Phone: (713) 526-6351 FAX: (713) 526-2964 Naval Surface Warfare Center, Carderock Division Attn: Eric Focht Code 614 9500
Macarthur Blvd West Bethesda, MD 20817-5700 Phone: (301) 227-5032 FAX: (301) 227-5576 Teledyne Allvac Attn: Dr. W. D. Cao 2020 Ashcraft Ave. Monroe, NC 28110 Phone: (704) 289-4511 FAX:
(704) 289-4269 Westmoreland Mechanical Testing and Research Inc. Attn: Andrew Wisniewski P.O. Box 388 Youngstown, PA 15696-0388 Mannesmann Rohrenwerke Mannesmann Forschungsinstitut (MFI)
Attn: Dr. Weiss Postfach 251160 47251 Duisburg Germany Phone: 011-49-0203-9993194 FAX: 011-49-0203-9994415 ThyssenKrupp VDM USA, Inc. Attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite
120 Houston, TX 77065-4939 Phone: (281) 955-6683 3.18 Thread Forming - The following provides the official interpretation of paragraph 4.5.2.7 of MIL-DTL-1222. 3.18.1 In order to qualify
for "Alternate Mechanical Testing" found in MIL-DTL-1222J paragraph 4.5.2.7 and utilize the mechanical properties for the starting bar stock in lieu of performing yield strength or proof
stress testing on finished fasteners, all of the subsequent provisions found in MIL-DTL-1222J paragraphs 4.5.2.7 a through e must be met. If any single provision is not met, all required
mechanical testing must be performed on the finished full sized fasteners. These provisions are explained as follows: a. Proper product lot control and traceability must be in place. b.
No heat treatment (including hot heading and hot forming), cold forming, drawing, rolling and thread rolling may be performed on the starting bar, fastener blanks or finished fasteners
after the completion of the mechanical testing on the starting bar. c. and d. The proper size starting bar must be selected to ensure mechanical properties of finished fasteners are
represented by the mechanical properties of the starting bar. e. The mandatory testing, axial tensile (studs) and wedge tensile (screws and bolts) must be performed on full sized
fasteners. Note that there is a typographical error in paragraph 4.5.2.7 and that the axial load test is a mandatory test that must be performed on studs as required in paragraph
4.5.2.7.e. 3.18.2 Thread rolling is a cold working process and is not considered to be a machining or grinding operation. Therefore, fasteners which have rolled threads do not satisfy the
provisions of MIL-DTL-1222J paragraph 4.5.2.7.b and are not eligible for the "Alternate Mechanical Testing" provision. 3.18.3 Thread rolling alone is not a sufficient cold working process
to qualify a fastener to be in the cold worked (CW) condition. This condition is only applicable to some 300 series stainless steel studs, screws and nuts. These CW condition fasteners
must be manufactured from cold worked bar stock or be cold headed in order to qualify. The threads may subsequently be rolled, machined or ground. Testing of the finished fasteners and/or
reporting of the starting bar stock material properties is subject to the same provisions found in MIL-DTL-1222J paragraph 4.5.2.7 and discussed above. 3.19 Specification Change - For
QQ-N-281, Class B material: 1 - Footnote 9 to Table II of QQ-N-281 does not apply. 2 - When starting material is Round Bar greater than 3" dia, the mechanical properties of Hex Bar apply.
3.20 Component Identification Description (CID) - When applicable drawing(s) and/or specification(s) specify that a nameplate or identification plate is required, the CID number ( ;CID
990997177; ) must be added. When no plate is specified, an identification plate in accordance with MIL-DTL-15024, Type "C" on brass or Type "H" on aluminum must be securely attached to
each assembly showing the above CID number. No assembly must be shipped without the CID number attached. 3.21 Welding or Brazing - When welding, brazing, and allied processes are
required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications,
or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing, personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or
0900-LP-001-7000, as applicable. Repair welding is not permitted on ;QQ-N-286; . Procedures and Qualification Data must be submitted for review and approval prior to performing any
welding or brazing. 3.22 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components
furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.23 Configuration Control - The Contractor
must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government
in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.23.1 Waivers/Deviations - All waivers and deviations, regardless of significance or
classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this
request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation
(non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics
support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about
remedial action being taken to prevent reoccurrence of the non-conformance. 3.23.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS
Contracting Specialist via eMail. 3.23.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or
interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment
covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and
change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change
and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or
retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals,
spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost
impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.24 Mercury Free - Mercury and mercury containing compounds must not
be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.25 NAVSEA
0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order.
The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.25.1 Marking of material with a Material Designator per the Drawing
is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. ^ QUALITY ASSURANCE REQUIREMENTS ^
3.26 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must
include the contractors name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractors or authorized personnels signature. Test
certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be
referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.27 Quality System Requirements - The Contractor furnishing items under this
contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or
ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.27.1 The
Contractors quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to
determine the systems effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.27.2 The Contractors quality system must be documented and must be
available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon
notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.27.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All
suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to
award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement.
3.27.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the
Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government
inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local
Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.27.5 Any changes made by the Contractor to a qualified quality system
will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.28 Contractor Inspection Requirements - The Contractor must
maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities
approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.28.1 The suppliers gages, measuring and
test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the suppliers
personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.28.2 All documents and reference data applicable to this contract
must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions
provided by the Government representative. 3.29 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not
manufactured or performed within the contractors facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a
subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being
purchased. When the Government elects to perform source inspection at the subcontractors facility, applicable purchase documents must be annotated with the following statement: "A
Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that
appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA)
Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.29.1 The prime contractors program
must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any
purchase document. 3.29.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine
the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.29.3 The prime contractor must ensure that the
purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the
effect of the purchased product on the end item represented by this contract. 3.29.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their
ability to supply the product in accordance with the prime contractors requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort
must be available for review by the government. 3.29.5 The prime contractors supplier quality assurance program must provide for a review of purchase documents to assure applicable
quality requirements are included or referenced in the documentation for compliance by the supplier. 3.30 Government Furnished Material and/or Equipment (GFM/GFE) - When material or
equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.30.1 Visual examination upon receipt to detect
damage during transit. 3.30.2 Inspection for completeness and proper type. 3.30.3 Verification of material quality received. 3.30.4 Periodic inspection and precautions to assure adequate
storage conditions and to guard against damage from handling and deterioration during storage. 3.30.5 Functional testing, either prior to or after installation, or both, as required by
the Contract to determine satisfactory operation. 3.30.6 Identification and protection from improper use or disposition. 3.30.7 Reporting to the Government, any GFM or GFE property found
damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and
necessity for withholding the material from use. 3.30.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate
storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.30.9 Material returned to
the contractor must be handled as GFM. 3.31 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that
traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must
completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3,
Section C of this contract/purchase order. 3.31.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in
DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in
this Contract/Purchase Order. 3.32 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as
applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the materials chemical composition and mechanical
properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for
the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to
the finished component. 3.32.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if
applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is
required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an
available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that
specified in the specification or drawing. 3.32.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8
inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material. 3.32.3 Traceability markings
must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely
attached to the assembly identifying the part number, piece number, traceability number, and the location of the permanent mark. 3.32.4 Marking must be legible and must be located so as
to not affect the form, fit, and function of the material. ; ; 3.33 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data
requirements specified in DI-MISC-81020, the following material certification requirements apply: 3.33.1 Quantitative chemical and mechanical analysis of material traceable to
traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material
supplied. 3.33.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters its properties. If the starting material or raw
stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties,
as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the
original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the
altered condition. The altered material must be uniquely re-identified. The properties thus determined and documented, are required for final certification and must conform to the
material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification forchemical composition must be overstamped
and annotated with the unique traceability material and at a minimum contain the information below. TRACEABILITY MARKING ________________________________________________ (marking on
finished item) IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO HEAT/LOT NUMBER ______________ AND HEAT TREAT NUMBER _____________________ (when applicable)
_________________________________________ DATE _____________________ (name and signature of auth. co. rep.) 3.33.3 Material certification data forwarded by the manufacturer must contain a
signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract
requirements. Transcription of certification data is prohibited. 3.33.4 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best
of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.33.5 If material is received without the required certification papers or with
incorrect/missing data on the certification papers, the material will be rejected. 3.34 Material Handling - The written material control process must include the following: 3.34.1 All raw
materials must have traceability markings (except as specified below). 3.34.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not
requiring traceability. 3.34.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately
restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must
be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability marking must be
reapplied upon completion of the final manufacturing process. 3.34.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies
requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a minimum, material verification must consist of inspection
of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the
correct type and grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure
conformance with the above requirements on welds performed by their subcontractors. 3.34.5 Purchase orders for raw material must specify that the material be traceable to material
certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in DI-MISC-81020 must be invoked by
the prime contractor on all subcontractors supplying Level I material. 3.34.6 The material control process must include requirements for the maintenance of traceability for items sent out
for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking location for remarking. The contractor must
also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.35 Receiving inspection - 3.35.1 Products and services produced
by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime
contractors plant or shipment to another location. 3.35.2 Receiving Inspection must include as a minimum - Verification that the traceability marking on the material agrees with that on
the certification test reports. Verification that certification test reports are legible and complete. Verification that the contents of the certification test reports are in compliance
with the contractually invoked specifications and requirements. 3.36 Discrepancy reporting - 3.36.1 Nonconforming products from sub-tier suppliers must be identified and processed in
accordance with the prime contractors procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to the responsible
sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for review by the government Quality Assurance Representative
(QAR). 3.37 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.37.1 Material Sampling - Material must be inspected for form,
fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable
military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must
be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size
must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.37.2 The Manufacturer may elect to use Statistical Process Control (SPC) to
assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the
Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.37.3 All data concerning material
verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be
100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.37.4 All material requiring traceability must be 100% inspected for
traceability marking and that the marking is legible. 3.38 See CDRLs DI-MISC-80875 (welding procedures) and DI-MISC-80876 (weld procedure qualification data) - When production or repair
welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below
must be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds. 3.38.1 Approval of the Contractors
qualification data must be obtained prior to performing any welding (production or repair). 3.38.2 If the Contractors qualification data has previously been approved by the Navy for other
contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must
reference the applicable welding procedure and qualification data report identification/number. Prior ap