Tow and Dismantlement of Ex-ARDENT (MCM 12), Ex-SCOUT (MCM 8), and Ex-CHAMPION (MCM 4) (Соединенные Штаты Америки - Тендер #41359189) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Соединенные Штаты Америки (другие тендеры и закупки Соединенные Штаты Америки) Организатор тендера: DEPT OF THE NAVY Номер конкурса: 41359189 Дата публикации: 01-05-2023 Источник тендера: Государственные закупки США |
||
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
The Contractor shall prepare the ships for tow, including ballasting the ship if needed, and tow MCMs (4, 8, & 12)
from the INACTSHIPMAINTO location at the Naval Station San Diego, California to the Contractor’s facility in
San Diego County, CA or by transport above water via heavy lift to an awardee’s facility located in the Continental
U.S. (CONUS). The tow must be in conformance with CDRL A001, which includes completion of the U.S. Navy
Tow Manual SL740-AA-MAN-010 Appendix H as well as a schematic of the rigging. Upon review and
confirmation of conformity of the documentation, the Navy’s technical authority for towing or a representative will
provide approval for tow. The Contractor shall ensure the stability of the vessel during the tow. The U.S Navy Tow
Manual can be obtained at
https://www.navsea.navy.mil/Portals/103/Documents/SUPSALV/Salvage%20Docs/Towing%20Manual.pdf
The Contractor shall complete the dismantling of the ships in a San Diego facility or a facility located in the
CONUS and remove and properly dispose of all regulated or hazardous materials/wastes in accordance with all
Federal, State, and local laws and regulations. The Contractor shall ensure the stability of the vessel during the
dismantlement. The Contractor shall process and sell all scrap and reusable equipment/material removed from the
vessel. The Contractor shall retain the sale proceeds to offset its costs of performance.
| Document | File Size | Access | Updated Date |
|---|---|---|---|
| N0002423R4204 Attachment J-12 MCM 4 Cut Out Section Drawings.pdf (opens in new window) |
3 MB
|
Public |
May 01, 2023
|
| N0002423R4204 Attachment J(S)-2 Past Performance Questionnaire.pdf (opens in new window) |
400 KB
|
Public |
May 01, 2023
|
| N0002423R4204 Attachment J-8 CDRLs.pdf (opens in new window) |
338 KB
|
Public |
May 01, 2023
|
| N0002423R4204 Attachment J(S)-3 Reference Information Sheet.pdf (opens in new window) |
109 KB
|
Public |
May 01, 2023
|
| N0002423R4204 Attachment J(S)-1 Pre-Proposal Information (PPI) Form.pdf (opens in new window) |
19 KB
|
Public |
May 01, 2023
|
| N0002423R4204 Solicitation.pdf (opens in new window) |
1 MB
|
Public |
May 01, 2023
|