Decarbonisation Programme - Project CoPPA (Великобритания (Англия, Шотландия, Уэльс) - Тендер #42971110) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Великобритания (Англия, Шотландия, Уэльс) (другие тендеры и закупки Великобритания (Англия, Шотландия, Уэльс)) Организатор тендера: Network Rail Infrastructure Ltd Номер конкурса: 42971110 Дата публикации: 20-06-2023 Источник тендера: Государственные закупки Уэльса (часть Соединённого Королевства Великобритании и Северной Ирландии) |
||
| Title: | Decarbonisation Programme - Project CoPPA |
| OCID: | ocds-h6vhtk-03d7a7 |
| Published by: | Network Rail Infrastructure Ltd |
| Authority ID: | AA73642 |
| Publication Date: | 20/06/2023 |
| Deadline Date: | |
| Deadline Time: | |
| Notice Type: | VEAT |
| Has Documents: | No |
| Has SPD: | No |
| Abstract: |
The procurement falls outside the scope of application of the regulations Explanation: This notice relates to a permitted modification to revise the price of a corporate power purchase agreement (the cPPA) originally awarded on 28 July 2022, following a competitive award process using the negotiated procedure in accordance with the Utilities Contracts Regulations 2016 (UCR). The cPPA is a national contract for the supply to NR of a target P50 volume of 63.8GWh per annum of renewable electricity for 15 years. The renewable electricity will be generated by a solar PV facility to be constructed, operated and maintained by the supplier. The solar PV facility will have a target installed capacity of 60 MWp ± 10%, with the supplier guaranteeing a minimum technical availability of 93%. The renewable electricity to be supplied to NR under the cPPA will be supplied on an "as available" basis using a sleeving arrangement with a third party licensed electricity supplier and the relevant volumes supplied will be utilised by NR"s non-traction business (e.g. managed stations, offices and depots). Please note that certain of the core supplier requirements referred to above differ from those listed in the contract award notice published on 19 August 2022 as the core supplier requirements stated herein represent the final core supplier requirements in the executed cPPA entered into between NR and the supplier on 28 July 2022. The cPPA was made conditional on the supplier achieving a final investment decision (FID) by 31 March 2023 (FID Milestone Delivery Date). Following a series of successive, substantial and unforeseen rises in the European Central Bank (ECB) interest rates for Main Refinancing Operations (fixed rate tenders) over the period from 30 November 2021 to 12 May 2022, the underlying financial model supporting the original cPPA pricing could no longer produce a return on investment for the supplier to reach FID. Accordingly, the supplier has proposed, and NR has agreed to make, a revision to the total price of the cPPA that results in an increase of under 50%, from £53.32 million to £79.80 million. The price increase involves the ECB interest rates increasing from 0% in November 2021 to 3.75% in May 2023.. There will also be a new FID Milestone Delivery Date of 30 September 2023 in the revised cPPA. NR is revising the cPPA through a variation agreement. The revision of the cPPA by NR is a permitted modification under the UCR. It is permitted by the exemption in Regulation 88(1)(c). For completeness, and to maximise transparency, NR will also publish a modification notice under Regulation 88(2) in due course after the variation agreement is entered into. The revision is permitted by Regulation 88(1)(c) because: (1) The need for modification has been brought about by circumstances which a diligent utility could not have foreseen: those circumstances are the unprecedented rise in ECB interest rates impacting the supplier"s financing of the project to an unmanageable degree, and the need for modification is brought about because of the impact of that rise on the viability of the new renewable energy site that the cPPA concerns, and the wider impact on the energy generation sector which means there are no viable alternative solutions at the original cPPA pricing. Neither the supplier nor NR, nor any diligent utility, could have foreseen the scale of the interest rate rises and the speed at which these would be introduced. In awarding the cPPA, NR had an express, overarching aim of delivering additionality, helping bring forward a new renewable energy site that would not otherwise have been developed. The revision described in this notice is a proportionate response to the unforeseen circumstances and what is needed to deliver this new renewable energy project, set in the context of achieving that overarching aim. (2) The modification does not alter the overall nature of |
Directive 2014/25/EU
Network Rail Infrastructure Ltd
2904587
Waterloo General Offices
London
SE1 8SW
UK
Telephone: +44 1908781000
E-mail: procrement@networkrail.co.uk
NUTS: UK
Internet address(es)
Main address: www.networkrail.co.uk
Address of the buyer profile: www.networkrail.co.uk
I.6) Main activity
Railway services
Decarbonisation Programme - Project CoPPA
II.1.2) Main CPV code09300000
II.1.3) Type of contractSupplies
II.1.4) Short descriptionThe procurement falls outside the scope of application of the regulations
Explanation:
This notice relates to a permitted modification to revise the price of a corporate power purchase agreement (the cPPA) originally awarded on 28 July 2022, following a competitive award process using the negotiated procedure in accordance with the Utilities Contracts Regulations 2016 (UCR). The cPPA is a national contract for the supply to NR of a target P50 volume of 63.8GWh per annum of renewable electricity for 15 years. The renewable electricity will be generated by a solar PV facility to be constructed, operated and maintained by the supplier. The solar PV facility will have a target installed capacity of 60 MWp ± 10%, with the supplier guaranteeing a minimum technical availability of 93%. The renewable electricity to be supplied to NR under the cPPA will be supplied on an "as available" basis using a sleeving arrangement with a third party licensed electricity supplier and the relevant volumes supplied will be utilised by NR"s non-traction business (e.g. managed stations, offices and depots).
Please note that certain of the core supplier requirements referred to above differ from those listed in the contract award notice published on 19 August 2022 as the core supplier requirements stated herein represent the final core supplier requirements in the executed cPPA entered into between NR and the supplier on 28 July 2022.
The cPPA was made conditional on the supplier achieving a final investment decision (FID) by 31 March 2023 (FID Milestone Delivery Date).
Following a series of successive, substantial and unforeseen rises in the European Central Bank (ECB) interest rates for Main Refinancing Operations (fixed rate tenders) over the period from 30 November 2021 to 12 May 2022, the underlying financial model supporting the original cPPA pricing could no longer produce a return on investment for the supplier to reach FID.
Accordingly, the supplier has proposed, and NR has agreed to make, a revision to the total price of the cPPA that results in an increase of under 50%, from £53.32 million to £79.80 million. The price increase involves the ECB interest rates increasing from 0% in November 2021 to 3.75% in May 2023.. There will also be a new FID Milestone Delivery Date of 30 September 2023 in the revised cPPA.
NR is revising the cPPA through a variation agreement. The revision of the cPPA by NR is a permitted modification under the UCR. It is permitted by the exemption in Regulation 88(1)(c). For completeness, and to maximise transparency, NR will also publish a modification notice under Regulation 88(2) in due course after the variation agreement is entered into.
II.1.6) Information about lotsThis contract is divided into lots: No
II.1.7) Total value of the procurementValue excluding VAT: 79 800 000.00 GBP
09310000
II.2.3) Place of performanceNUTS code:
UK
Main site or place of performance:
Throughout the UK
II.2.4) Description of the procurementThe procurement falls outside the scope of application of the regulations
Explanation:
This notice relates to a permitted modification to revise the price of a corporate power purchase agreement (the cPPA) originally awarded on 28 July 2022, following a competitive award process using the negotiated procedure in accordance with the Utilities Contracts Regulations 2016 (UCR). The cPPA is a national contract for the supply to NR of a target P50 volume of 63.8GWh per annum of renewable electricity for 15 years. The renewable electricity will be generated by a solar PV facility to be constructed, operated and maintained by the supplier. The solar PV facility will have a target installed capacity of 60 MWp ± 10%, with the supplier guaranteeing a minimum technical availability of 93%. The renewable electricity to be supplied to NR under the cPPA will be supplied on an "as available" basis using a sleeving arrangement with a third party licensed electricity supplier and the relevant volumes supplied will be utilised by NR"s non-traction business (e.g. managed stations, offices and depots).
Please note that certain of the core supplier requirements referred to above differ from those listed in the contract award notice published on 19 August 2022 as the core supplier requirements stated herein represent the final core supplier requirements in the executed cPPA entered into between NR and the supplier on 28 July 2022.
The cPPA was made conditional on the supplier achieving a final investment decision (FID) by 31 March 2023 (FID Milestone Delivery Date).
Following a series of successive, substantial and unforeseen rises in the European Central Bank (ECB) interest rates for Main Refinancing Operations (fixed rate tenders) over the period from 30 November 2021 to 12 May 2022, the underlying financial model supporting the original cPPA pricing could no longer produce a return on investment for the supplier to reach FID.
Accordingly, the supplier has proposed, and NR has agreed to make, a revision to the total price of the cPPA that results in an increase of under 50%, from £53.32 million to £79.80 million. The price increase involves the ECB interest rates increasing from 0% in November 2021 to 3.75% in May 2023.. There will also be a new FID Milestone Delivery Date of 30 September 2023 in the revised cPPA.
NR is revising the cPPA through a variation agreement. The revision of the cPPA by NR is a permitted modification under the UCR. It is permitted by the exemption in Regulation 88(1)(c). For completeness, and to maximise transparency, NR will also publish a modification notice under Regulation 88(2) in due course after the variation agreement is entered into.
The revision is permitted by Regulation 88(1)(c) because:
(1) The need for modification has been brought about by circumstances which a diligent utility could not have foreseen: those circumstances are the unprecedented rise in ECB interest rates impacting the supplier"s financing of the project to an unmanageable degree, and the need for modification is brought about because of the impact of that rise on the viability of the new renewable energy site that the cPPA concerns, and the wider impact on the energy generation sector which means there are no viable alternative solutions at the original cPPA pricing. Neither the supplier nor NR, nor any diligent utility, could have foreseen the scale of the interest rate rises and the speed at which these would be introduced. In awarding the cPPA, NR had an express, overarching aim of delivering additionality, helping bring forward a new renewable energy site that would not otherwise have been developed. The revision described in this notice is a proportionate response to the unforeseen circumstances and what is needed to deliver this new renewable energy project, set in the context of achieving that overarching aim.
(2) The modification does not alter the overall nature of the contract. It remains an agreement for the supply of renewable electricity to NR from the same renewable source, meeting the same technical requirements, generated at the same new site, for a 15 year supply period, continuing to meet the overarching aim of additionality that underpinned NR"s original cPPA award.
II.2.11) Information about optionsOptions: No
II.2.13) Information about European Union fundsThe procurement is related to a project and/or programme financed by European Union funds: No
II.2.14) Additional informationNR will not enter into the amendment agreement to revise the cPPA until after a period of at least 10 days beginning with the day after the date on which this notice is published.
Award of a contract without prior publication of a call for competition
Justification for selected award procedure:
The procurement falls outside the scope of application of the Directive
Explanation:
See II.2.4) Description of the procurement for explanation.
IV.1.8) Information about Government Procurement Agreement (GPA)The procurement is covered by the Government Procurement Agreement: No
16/06/2023
V.2.2) Information about tendersThe contract has been awarded to a group of economic operators: No
V.2.3) Name and address of the contractorEDF Energy Renewables Ltd
06456689
Alexander House, 1 Mandarin Road, Rainton Bridge Business Park, Houghton Le Spring
Sunderland
DH4 5RA
UK
NUTS: UK
The contractor is an SME: No
V.2.4) Information on value of the concession and main financing terms (excluding VAT) V.2.5) Information about subcontractingThe contract/concession is likely to be subcontracted
NR will not enter into the amendment agreement to revise the cPPA until after a period of at least 10 days beginning with the day after the date on which this notice is published.
The High Court
Little George St, London Town
London
SW1P 3BD
UK
19/06/2023
Information added to the notice since publication.
Additional information added to the notice since it"s publication.| No further information has been uploaded. |
| Main Contact: | procrement@networkrail.co.uk |
| Admin Contact: | N/a |
| Technical Contact: | N/a |
| Other Contact: | N/a |
| ID | Title | Parent Category |
|---|---|---|
| 09310000 | Electricity | Electricity, heating, solar and nuclear energy |
| 09300000 | Electricity, heating, solar and nuclear energy | Petroleum products, fuel, electricity and other sources of energy |
| ID | Description |
|---|---|
| 100 | UK - All |
The buyer has restricted the alert for this notice to suppliers based in the following regions.
Alert Region Restrictions| There are no alert restrictions for this notice. |