Invitation to Tender: Pembrokeshire Demonstration Zone - MOS Onshore Surveys Procurement -Technical (Великобритания (Англия, Шотландия, Уэльс) - Тендер #42968773) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Великобритания (Англия, Шотландия, Уэльс) (другие тендеры и закупки Великобритания (Англия, Шотландия, Уэльс)) Организатор тендера: Celtic Sea Power Limited Номер конкурса: 42968773 Дата публикации: 20-06-2023 Источник тендера: Государственные закупки Уэльса (часть Соединённого Королевства Великобритании и Северной Ирландии) |
||
| Title: | Invitation to Tender: Pembrokeshire Demonstration Zone - MOS Onshore Surveys Procurement -Technical |
| OCID: | ocds-kuma6s-131639 |
| Published by: | Celtic Sea Power Limited |
| Authority ID: | AA80992 |
| Publication Date: | 20/06/2023 |
| Deadline Date: | |
| Deadline Time: | |
| Notice Type: | Contract Award Notice |
| Has Documents: | No |
| Has SPD: | No |
| Abstract: |
Celtic Sea Power are looking to appoint a specialist to provide technical input into the scope of work for a later Onshore Surveys ITT which will be for a full suite of onshore surveys as
set out in the Scoping report and response from NRW found at the following link https://publicregister.naturalresources.wales/Search/Download?RecordId=139646 The surveys routes are currently dependent on the output of the Electricity System Operators, Holistic Network Design Follow Up Exercise, which is due to be announced in June 2023. However, for the purposes of this tender, bidders will be asked to provide a fixed fee for their proposals on the routes included in Figure 2 below (the shape files of these can be found in Appendix 2) and based on the assumptions listed below. • Assumption 1 – Surveys will be carried out in a similar time window. • Assumption 2 – CSP will secure landowner agreement to access land for survey purposes. The output of this commission should be suite of documents that covers the full survey methodology for each survey undertaken, a completed Bill of Quantities with P80 budgets for each route and provision of all survey data in both raw and PDF Plan format. Work Package A: Review Scoping Opinion comments from NRW. The primary purpose of this work package is to review the Scoping Report and Scoping Opinion from NRW in relation to the onshore survey scope. The output of this review is to ensure that all survey requirements contained within the Scoping Report and NRW"s response is accounted for in the Service Specification. The Successful bidder will be required to provide CSP with confirmation in writing that the outputs meet both the scoping report and the comments made in NRW’s response. All files are available on the NRW Website. Work Package B: Service specification for the scope of work for all required Onshore Surveys ITT Working with the Survey and Consents Manager, the supplier will be expected to finalize the full scope of a survey campaign including types of survey, seasonal considerations, meeting of technical requirements, methodologies to adhere to, equipment and calibrations to be used, appropriateness of organisational structure and capability, health and safety and how the data will need to be presented. The completed scope will therefore be required to characterise the environmental aspects of the onshore export cable corridor area of the Electric Cable Corridor for EIA purposes in line with the expectations of the Owner and the Licensing Authority. This forms the main technical input to a future ITT that will see to procure the surveys as set out in this ITT. Celtic Sea Power require the supplier to provide the following support. a. Support the Survey and Consents Manager to identify suitable Onshore Survey contractors. Work Package C: PDZ Onshore Surveys Bill of Quantities for each route. To enable CSP’s evaluation a Bidders" future response to later ITT, CSP will require the bidder to supply Onshore Surveys Bill of Quantities for each route, to be populated with a budget to P80 level of confidence in the MS Excel format. Work Package D: Schedule in MS Project format A required output of this commission will be for the successful bidder to provide specialist support in forecasting milestones for delivery, the timings of the surveys with suggested budgets and payment schedules. Therefore, a schedule of works will be required for the complete surveys campaign to characterise the environmental aspects of the onshore export cable corridor area of the Electric Cable Corridor for EIA purposes in line with the expectations of the Owner and the Licensing Authority in Microsoft Projects format. |
CONTRACT AWARD NOTICE – NATIONAL |
|||||||||||||||||||
| Notice Type: SERVICES | |||||||||||||||||||
1 Authority Details |
|||||||||||||||||||
1.1 |
Authority Name and Address |
||||||||||||||||||
|
|||||||||||||||||||
2 Contract Details |
|||||||||||||||||||
2.1 |
TitleInvitation to Tender: Pembrokeshire Demonstration Zone - MOS Onshore Surveys Procurement -Technical |
||||||||||||||||||
2.2 |
Description of the contractCeltic Sea Power are looking to appoint a specialist to provide technical input into the scope of work for a later Onshore Surveys ITT which will be for a full suite of onshore surveys as set out in the Scoping report and response from NRW found at the following link https://publicregister.naturalresources.wales/Search/Download?RecordId=139646 The surveys routes are currently dependent on the output of the Electricity System Operators, Holistic Network Design Follow Up Exercise, which is due to be announced in June 2023. However, for the purposes of this tender, bidders will be asked to provide a fixed fee for their proposals on the routes included in Figure 2 below (the shape files of these can be found in Appendix 2) and based on the assumptions listed below. • Assumption 1 – Surveys will be carried out in a similar time window. • Assumption 2 – CSP will secure landowner agreement to access land for survey purposes. The output of this commission should be suite of documents that covers the full survey methodology for each survey undertaken, a completed Bill of Quantities with P80 budgets for each route and provision of all survey data in both raw and PDF Plan format. Work Package A: Review Scoping Opinion comments from NRW. The primary purpose of this work package is to review the Scoping Report and Scoping Opinion from NRW in relation to the onshore survey scope. The output of this review is to ensure that all survey requirements contained within the Scoping Report and NRW"s response is accounted for in the Service Specification. The Successful bidder will be required to provide CSP with confirmation in writing that the outputs meet both the scoping report and the comments made in NRW’s response. All files are available on the NRW Website. Work Package B: Service specification for the scope of work for all required Onshore Surveys ITT Working with the Survey and Consents Manager, the supplier will be expected to finalize the full scope of a survey campaign including types of survey, seasonal considerations, meeting of technical requirements, methodologies to adhere to, equipment and calibrations to be used, appropriateness of organisational structure and capability, health and safety and how the data will need to be presented. The completed scope will therefore be required to characterise the environmental aspects of the onshore export cable corridor area of the Electric Cable Corridor for EIA purposes in line with the expectations of the Owner and the Licensing Authority. This forms the main technical input to a future ITT that will see to procure the surveys as set out in this ITT. Celtic Sea Power require the supplier to provide the following support. a. Support the Survey and Consents Manager to identify suitable Onshore Survey contractors. Work Package C: PDZ Onshore Surveys Bill of Quantities for each route. To enable CSP’s evaluation a Bidders" future response to later ITT, CSP will require the bidder to supply Onshore Surveys Bill of Quantities for each route, to be populated with a budget to P80 level of confidence in the MS Excel format. Work Package D: Schedule in MS Project format A required output of this commission will be for the successful bidder to provide specialist support in forecasting milestones for delivery, the timings of the surveys with suggested budgets and payment schedules. Therefore, a schedule of works will be required for the complete surveys campaign to characterise the environmental aspects of the onshore export cable corridor area of the Electric Cable Corridor for EIA purposes in line with the expectations of the Owner and the Licensing Authority in Microsoft Projects format. |
||||||||||||||||||
2.3 |
Notice Coding and Classificationa) Commodity Codes
|
||||||||||||||||||
2.4 |
Estimated Total Value |
||||||||||||||||||
3 Procedure |
|||||||||||||||||||
3.1 |
Type of ProcedureSingle stage |
||||||||||||||||||
4 Award of Contract |
|||||||||||||||||||
4.1 |
Successful Bidders |
||||||||||||||||||
4.1.1 |
Name and Address of successful supplier, contractor or service providerContract No: MAY437562
|
||||||||||||||||||
5 Other Information |
|||||||||||||||||||
5.1 |
Reference number attributed to the notice by the contracting authorityN/a |
||||||||||||||||||
5.2 |
Date of Contract Award15-06-2023 |
||||||||||||||||||
5.3 |
Number of tenders received2 |
||||||||||||||||||
5.4 |
Other Information(WA Ref:132505) |
||||||||||||||||||
5.5 |
Additional DocumentationN/a |
||||||||||||||||||
5.6 |
Publication date of this notice:20-06-2023 |
||||||||||||||||||
Information added to the notice since publication.
Additional information added to the notice since it"s publication.| No further information has been uploaded. |
| Main Contact: | brad.davies@celticseapower.co.uk |
| Admin Contact: | N/a |
| Technical Contact: | N/a |
| Other Contact: | N/a |
| ID | Title | Parent Category |
|---|---|---|
| 89 | Swansea Bay City Deal | Sell2Wales Projects |
| ID | Description |
|---|---|
| 1014 | South West Wales (Carmarthenshire, Pembrokeshire, Ceredigion) |
The buyer has restricted the alert for this notice to suppliers based in the following regions.
Alert Region Restrictions| There are no alert restrictions for this notice. |
| Hide related notices | |
| MAY437562: Invitation to Tender: Pembrokeshire Demonstration Zone - MOS Onshore Surveys Procurement -Technical | |
| Publication Date: | 16/05/2023 |
| Deadline: | 23/05/2023 |
| Notice Type: | Contract Notice |
| Authority name: | Celtic Sea Power Limited |
| JUN441341: Invitation to Tender: Pembrokeshire Demonstration Zone - MOS Onshore Surveys Procurement -Technical | |
| Publication Date: | 20/06/2023 |
| Notice Type: | Contract Award Notice |
| Authority name: | Celtic Sea Power Limited |