Страна: Великобритания (Англия, Шотландия, Уэльс) (другие тендеры и закупки Великобритания (Англия, Шотландия, Уэльс)) Организатор тендера: Transport for Wales Номер конкурса: 41503854 Дата публикации: 05-05-2023 Источник тендера: Государственные закупки Уэльса (часть Соединённого Королевства Великобритании и Северной Ирландии) |
||
| Title: | TfW Core Valley Lines Transformation - Rhymney Valley, Coryton and Bay Lines Electrification |
| OCID: | ocds-kuma6s-131228 |
| Published by: | Transport for Wales |
| Authority ID: | AA50685 |
| Publication Date: | 05/05/2023 |
| Deadline Date: | |
| Deadline Time: | |
| Notice Type: | 03 Contract Award Notice - Successful Supplier(s) |
| Has Documents: | No |
| Has SPD: | No |
| Abstract: |
The CVL Transformation programme of works forms an important part of the South Wales Metro and includes an ambitious and extensive range of rail works including electrification of circa
170km of track, new stations, major refurbishment / extension of stations and associated ancillary works. The overarching deliverables for the works are: - Establish and manage a materials distribution center (MDC) within a locality of the works which facilitates storage and expeditious delivery of materials to the worksites. - Provision of a comprehensive materials quality control & material management system which can, but not be limited to the following functions: receive inputs (AFC designs, bills of materials, programme dates, track all stages of installation and associated quality checks and the like), take cognisance of stock levels, produce outputs (material order details) and align material allocations to site locations. - Establish and provide a team of subject matter experts to undertake detailed design and manage the works from works delivery and contract administration standpoint. - Procurement of materials required for construction of OLE system. - Delivery of a full OLE system from foundations to final registration for 13.205 single track kilometers (STK) on the Queen Street North route section, 1.5 STK on the Bay route section, and 45.555 STK on the Rhymney route section. The works that form the basis of this procurement event are partly funded by European Regional Development Funds (ERDF) resulting in prescriptive dates by which the ERDF monies must be expended. This therefore dictates the following completion dates for the works: - Final Registration of Queen Street North route section by 23/10/2023 - Final Registration of Bay route section by 15/06/2023 - Final Registration of Rhymney route section by 01/05/24 Specific OLE deliverables include, but are not limited to the design and construction of: - Foundation Installation – Circular Hollow Sections (CHS) piles, auger piles, concrete pads, plunge piles. - Mast Installation – single track cantilever masts, self-supporting anchor masts, twin track cantilever masts, portal masts. - Booms. - Ties, struts and small part steel including tensioning system etc - Switching including platforms as required - Wiring. - Final registration. CPV: 45234100, 45234100. |
Results of the procurement procedure
Transport for Wales
3 Llys Cadwyn, Taff Street
Pontypridd
CF37 4TH
UK
Telephone: +44 2921673434
E-mail: TFW.Procurement@tfwrail.wales
NUTS: UKL
Internet address(es)
Main address: http://www.tfwrail.wales
Address of the buyer profile: https://www.sell2wales.gov.wales/search/Search_AuthProfile.aspx?ID=AA50685
The contract is awarded by a central purchasing body
Body governed by public law
Other: Rail
TfW Core Valley Lines Transformation - Rhymney Valley, Coryton and Bay Lines Electrification
II.1.2) Main CPV code45234100
II.1.3) Type of contractWorks
II.1.4) Short descriptionThe CVL Transformation programme of works forms an important part of the South Wales Metro and includes an ambitious and extensive range of rail works including electrification of circa 170km of track, new stations, major refurbishment / extension of stations and associated ancillary works.
The overarching deliverables for the works are:
- Establish and manage a materials distribution center (MDC) within a locality of the works which facilitates storage and expeditious delivery of materials to the worksites.
- Provision of a comprehensive materials quality control & material management system which can, but not be limited to the following functions: receive inputs (AFC designs, bills of materials, programme dates, track all stages of installation and associated quality checks and the like), take cognisance of stock levels, produce outputs (material order details) and align material allocations to site locations.
- Establish and provide a team of subject matter experts to undertake detailed design and manage the works from works delivery and contract administration standpoint.
- Procurement of materials required for construction of OLE system.
- Delivery of a full OLE system from foundations to final registration for 13.205 single track kilometers (STK) on the Queen Street North route section, 1.5 STK on the Bay route section, and 45.555 STK on the Rhymney route section.
The works that form the basis of this procurement event are partly funded by European Regional Development Funds (ERDF) resulting in prescriptive dates by which the ERDF monies must be expended. This therefore dictates the following completion dates for the works:
- Final Registration of Queen Street North route section by 23/10/2023
- Final Registration of Bay route section by 15/06/2023
- Final Registration of Rhymney route section by 01/05/24
Specific OLE deliverables include, but are not limited to the design and construction of:
- Foundation Installation – Circular Hollow Sections (CHS) piles, auger piles, concrete pads, plunge piles.
- Mast Installation – single track cantilever masts, self-supporting anchor masts, twin track cantilever masts, portal masts.
- Booms.
- Ties, struts and small part steel including tensioning system etc
- Switching including platforms as required
- Wiring.
- Final registration.
II.1.6) Information about lotsThis contract is divided into lots: No
II.1.7) Total value of the procurementValue excluding VAT: 38 000 000.00 GBP
45234100
II.2.3) Place of performanceNUTS code:
UKL
II.2.4) Description of the procurementDesign and installation of Overhead Line Equipment for the electrification of rail lines in Wales.
II.2.5) Award criteriaQuality criterion: Quality / Weighting: 35%
Price / Weighting: 65%
II.2.11) Information about optionsOptions: No
II.2.13) Information about European Union fundsThe procurement is related to a project and/or programme financed by European Union funds: Yes
Open procedure
IV.1.8) Information about Government Procurement Agreement (GPA)The procurement is covered by the Government Procurement Agreement: Yes
Notice number in the OJ S:
2022/S 180-510896
A contract/lot is awarded: Yes
31/03/2023
V.2.2) Information about tendersNumber of tenders received: 1
Number of tenders received from SMEs: 0
Number of tenders received from tenderers from EU Member States: 0
Number of tenders received from tenderers from non-EU Member States: 1
Number of tenders received by electronic means: 1
The contract has been awarded to a group of economic operators: No
V.2.3) Name and address of the contractorAmey Rail Limited
10 Furnival Street
London
EC4A1AB
UK
Telephone: +44 7718168421
NUTS: UK
The contractor is an SME: No
V.2.4) Information on value of the contract/lot (excluding VAT)Total value of the contract/lot: : 38 000 000.00 GBP
V.2.5) Information about subcontracting(WA Ref:131228)
High Court
Royal Courts of Justice, The Strand
London
WC2A 2LL
UK
Telephone: +44 2079477501
03/05/2023
Information added to the notice since publication.
Additional information added to the notice since it"s publication.| No further information has been uploaded. |
| Main Contact: | TFW.Procurement@tfwrail.wales |
| Admin Contact: | N/a |
| Technical Contact: | N/a |
| Other Contact: | N/a |
| ID | Title | Parent Category |
|---|---|---|
| 45234100 | Railway construction works | Construction work for railways and cable transport systems |
| ID | Description |
|---|---|
| 1022 | Cardiff and Vale of Glamorgan |
| 1015 | Central Valleys (Merthyr Tydfil, Rhondda Cynon Taf) |
The buyer has restricted the alert for this notice to suppliers based in the following regions.
Alert Region Restrictions| There are no alert restrictions for this notice. |