Страна: Таджикистан (другие тендеры и закупки Таджикистан) Организатор тендера: The World Bank Номер конкурса: 64848653 Дата публикации: 20-06-2025 Источник тендера: Тендеры всемирного банка |
||
P150816
Nurek Hydropower Rehabilitation Project Phase I
Tajikistan
OP00364679
Request for Expression of Interest
Published
TJ NHPP CS 06-2025
Consultant Qualification Selection
English
Jun 26, 2025 17:00
Jun 19, 2025
OJSC Barqi Tojik
Daler Irmatov
64, Ismoili Somoni str, Dushanbe
Tajikistan
Tajikistan
+(992)-37 235-87-64
www.barqitojik.tj
Request for Expression of Interest
(consulting services – firms selection)
for consultancy to hold public consultations, information sharing and conduct an assessment of beneficiary satisfaction with citizen engagement mechanism in the frame of Nurek Hydropower Rehabilitation Project Phase I
Republic of Tajikistan
Nurek Hydropower Rehabilitation Project
OJSC “Barqi Tojik”
Loan No. IDA 60240
Reference No.: TJ NHPP CS 06-2025
The Republic of Tajikistan has received financing from the World Bank toward the cost of the Nurek Hydropower Rehabilitation Project, and intends to apply part of the proceeds for consulting services. The consulting services include holding public consultations, information sharing and conduct an assessment of beneficiary satisfaction with citizen engagement mechanism.
The executing agency for the project is Open Joint Stock Company “Barqi Tojik” (BT), a state-owned enterprise, which is responsible for generation of electricity and manages major HPPs and TPPs in the Republic of Tajikistan.
One of the key facilities for the generation of electricity in the country, which supplies more than 70% of the total power generation is Nurek Hydropower Plant (HPP). The construction of Nurek HPP has started in 1961 and completed in 1979s. The initially installed capacity of the plant was 2700 MW, and then in 1988 it was increased to 3000 MW by upgrading of hydro turbines. After four decades of operations, the Nurek HPP now requires major rehabilitation of its generating units and a series of works to ensure its continued safe operation.
The rehabilitation of the Nurek HPP is being carrying out in two phases. The first phase comprises the rehabilitation of four (4) generating units, balance of plant rehabilitation and critical dam safety works. The remaining five (5) units and the remaining balance of plant will be rehabilitated in the phase II of the project. The World Bank and other donor agencies provided the financing for the Nurek Hydropower Rehabilitation Project.
The assignment set out in the ToR consists of two tasks. Task 1 – Project Public consultation and information sharing and Task 2 - Assess beneficiary satisfaction with citizen engagement mechanism.
The objective of consulting assignment under:
The detailed ToR can be found at the following website:
https://drive.google.com/drive/folders/1gYAXsn0WYMECOnJUH9MMP6aUodtLRTix?usp=sharing
OJSC “Barqi Tojik” now invites eligible consulting companies to indicate their interest in providing the above mentioned services. Interested companies must provide information indicating that they are qualified to carry out the mentioned services (brochures, description of similar assignments, experience in similar conditions, availability of appropriate skills among staff, etc.).
Consulting Company will be selected in accordance with the Consultant’s Qualifications Selection (CQS) procedures in accordance with Section VII, paragraphs 7.11 and 7.12 of “Procurement Regulations for IPF Borrowers” February 2025 (“Procurement Regulations”).
The attention of interested Consultants is drawn to Section III, paragraphs, 3.15 and 3.16 of the World Bank’s Procurement Regulations, setting forth the World Bank’s policy on conflict of interest. For details on evaluation criteria Consultants shall refer to the ToR clause no.7.
Expressions of interest must be prepared in English language (with preferrable translation to Russian) and delivered electronically to the email below, by 17:00 (Dushanbe local time) on June 26, 2025.
Mr. Shukurzoda Farhod
Executive Director
PRG “Energy Loss Reduction”
OJSC “Barqi Tojik”
Fax: (+992-37) 235-87-64
E-mail: elrpbt@gmail.com