Тендеры России
Поиск
Senegal Municipal Solid Waste Management Project (Сенегал - Тендер #65342864) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Сенегал (другие тендеры и закупки Сенегал) Организатор тендера: The World Bank Номер конкурса: 65342864 Дата публикации: 10-07-2025 Источник тендера: Тендеры всемирного банка |
||
P161477
Senegal Municipal Solid Waste Management Project
Senegal
OP00367364
Contract Award
Published
SN-PROMOGED-360650-CS-QCBS
Quality And Cost-Based Selection
English
Jul 09, 2025
Project: P161477-
Loan/Credit/TF Info: IDA-65530
Bid/Contract Reference No: SN-PROMOGED-360650-CS-QCBS
Procurement Method: QCBS-Quality And Cost-Based Selection
Scope of Contract: Sélection et l’emploi d’un cabinet pour les études de préfaisabilité pour la mise en place d’un (PPP) pour le financement, la construction et
l’exploitation: CIVD de Kandiaye, Saré Bidjil et Diende
Notice Version No: 0
| Name | Nationality | Residence Country | Conditions Met |
|---|---|---|---|
| Mouhoud MOURAD | DZ | Algeria | Directly or indirectly holding 25% or more of the shares |
| Name | Nationality | Residence Country | Conditions Met |
|---|---|---|---|
| Pierre Merlin | FR | France | Directly or indirectly holding 25% or more of the shares |
| Patrick Merlin | FR | France | Directly or indirectly holding 25% or more of the shares |
| Name | Nationality | Residence Country | Conditions Met |
|---|---|---|---|
| François DE LAAGE DE MEUX | FR | France | Directly or indirectly holding 25% or more of the shares |
| Name | Nationality | Residence Country | Conditions Met |
|---|---|---|---|
| Pierre MERLIN | FR | France | Directly or indirectly holding 25% or more of the shares |
| Patrick MERLIN | FR | France | Directly or indirectly holding 25% or more of the shares |
| Name | Nationality | Residence Country | Conditions Met |
|---|---|---|---|
| Pelisson EMMANUEL | FR | France | Directly or indirectly holding 25% or more of the shares |
| Technical: | 83.50 | |
| Consultant Specific Experience: | 9 | |
| Methodology: | 15.5 | |
| Key Personnel: | 55 | |
| Transfer of Knowledge: | 4 | |
| Financial: | 100 | |
| Combined: | 86.8 | |
| Rank: | 1 | |