Reference Number
|
12657284
|
|
Procuring Entity
|
BARANGAY ALI-IS - BAYAWAN CITY, NEGROS ORIENTAL
|
|
Title
|
DRAINAGE CANAL
|
|
Area of Delivery
|
Negros Oriental
|
Printable Version
|
|
Solicitation Number:
|
NONE
|
|
Trade Agreement:
|
ADB Procurement Guidelines
|
|
Procurement Mode:
|
Public Bidding
|
|
Classification:
|
Goods
|
|
Category:
|
Construction Materials and Supplies
|
|
Estimated Budget for the Contract:
|
PHP 200,000.00
|
|
Delivery Period:
|
30 Day/s
|
|
Client Agency:
|
|
|
|
Contact Person:
|
Juliefreda P. Basilio
Barangay Treasurer
Proper Ali-is.
Bayawan City
Negros Oriental
Philippines
63-063-09539281263
juliefredapalomarbasitio@gmail.com
|
|
Status
|
Active
|
|
Associated Components
|
Order
|
|
Bid Supplements
|
0
|
|
Document Request List
|
0
|
|
Date Published
|
09/01/2026
|
|
Last Updated / Time
|
09/01/2026 12:00 AM
|
|
Closing Date / Time
|
23/01/2026 5:00 PM
|
|
Description
|
DETAILED ESTIMATES
NAME/LOCATION CONSTRUCTION OF DRAINAGE CANAL DATE : Dec. 03, 2025
OF PROJECT
BARANGAY ALI-IS, BAYAWAN CITY
DESCRIPTION QUANTITY ESTIMATED DAYS/WEEK NUMBER OF DAYS DAILY RATE TOTAL COST
EQUIPMENT
Fuel, oil and lubricants SUB - TOTAL ( A ) 0.00%
DESCRIPTION NUMBER OF PERSON NUMBER OF DAYS DAILY RATE TOTAL COST
L A B O R Senior Foreman 1 20 445.00 8,900.00
Mason 1 20 405.00 8,100.00
Carpenter 1 5 405.00 2,025.00
Welder 1 18 405.00 7,290.00
Painter 2 5 405.00 4,050.00
Labor 5 20 280.00 28,000.00
SUB - TOTAL ( B ) 29.18% 58,365.00
Item Number. DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST
M A T E R I A L S I 1 LOT CEMENT
1 CEMENT, Portland (40kgs/bag) 150 bag/s 214.00 32,100.00
II 1 LOT AGGREGATE, SAND AND GRAVEL
2 SAND, Washed, Mixing/Screened (Delivered on Site) 10 cu.m. 1,250.00 12,500.00
3 GRAVEL, Crushed/Screened, Mixing & Washed, max. Size 25mm ø (Deliver on Site) 20 cu.m. 1,400.00 28,000.00
4 AGGREGATE Sub-base Course, Item #200 cu.m. 1,250.00 -
III 1 LOT CONCRETE HOLLOW BLOCK
5 HOLLOW BLOCK, Concrete, 10cm x 20cm x 40cm 321 pc/s 17.00 5,457.00
IV 1 LOT BARS
6 DEFORMED BAR, 10mm dia x 20" (6m), grade 275 40 length/s 165.00 6,600.00
7 DEFORMED STEEL BAR, 16mm ø x 6m, Grade 415 15 length/s 414.00 6,210.00
8 ANGLE BAR, 4.5mm x 25mm x 25mm x 6m 68 length/s 665.00 45,220.00
V 1 LOT CONSTRUCTION MATERIALS
9 TIE WIRE, # 16 15 kg/s 80.00 1,200.00
10 BLADE, Hacksaw , ½" x 12", 18TPI (pc), (Excellent Quality) 5 pc/s 60.00 300.00
11 NAILS, Common Wire, 62mm 5 kg/s 120.00 600.00
VI 1 LOT CUTTING MATERIALS
12 CUTTING DISC, 100mm dia, for metal 20 pc/s 35.00 700.00
Item Number. DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST
M A T E R I A L S VII 1 LOT WELDING MATERIALS
13 ROD/Electrode, Welding, E6013, 1/8" (bx)) (Matchless Quality, ISO 9001, 2000 Certified, 20 Kg/Box) 1 box/es 1,984.00 1,984.00
VII 1 LOT PAINTING MATERIALS
14 PAINT PRIMER, Metal, Red Oxide (gal) 2 gal/s 610.00 1,220.00
15 BRUSH, PAINT, 50mm, Hair type 2 pc/s 41.00 82.00
SUB - TOTAL ( C ) 71.09% 142,173.00
T O T A L ( A + B + C ) 200,538.00
DIRECT COST . . . . . . . . . . . . . 100.27% 200,538.00
INDIRECT COST . . . . . . . . . . . . . ROW COMPENSATION . . . . . . 0.00%
TRAVELLING EXPENSES… 0.00%
CONTINGENCY . . . . . . . . . . . 0.00% 2.00
CONSTRUCTION COST . . . . . . . . . . . 100.27% 200,540.00
|
|
|
|
Pre-bid Conference
|
|
Date
|
Time
|
Venue
|
|
16/01/2026
|
9:00 AM
|
BRGY. ALI-IS, BAYAWAN CITY NEGROS ORIENTAL
|
|
|
|
|
|
|
|
Created by
|
Juliefreda P. Basilio
|
|
Date Created
|
03/12/2025
|
|
|
|
|