Competitive and Livable City of Karachi Project (Пакистан - Тендер #69835452) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Пакистан (другие тендеры и закупки Пакистан) Организатор тендера: The World Bank Номер конкурса: 69835452 Дата публикации: 09-01-2026 Источник тендера: Тендеры всемирного банка |
||
P161402
Competitive and Livable City of Karachi Project
Pakistan
OP00419815
Invitation for Bids
Published
PK-SID-530225-CW-RFQ
Request for Quotations
English
Jan 12, 2026 15:00
Jan 08, 2026
Sindh Investment Department
Behzad Memon
FTC Building Karachi
Pakistan
Pakistan
0322-2736737
https://sindhinvestment.gos.pk/download
REQUEST FOR QUOTATION
(RFQ)
HIRING OF CONTRACTOR / FIRM FOR RENOVATION, INTERIOR & MEP WORKS OF SINDH BUSINESS FACILITATION CENTER (SBFC), CLIFTON – KARACHI
REF: No. PK-SID-530225-CW-RFQ
ISSUE DATE: 31st December 2025
M/S ____________________
Project Director (CLICK)
Sindh Investment Department
Government of Sindh
Address: First Floor, Block B ,
FTC Building, Shahra-e-Faisal, Karachi
Telephone: +92-21-99207512-14
RENOVATION & INTERIOR WORKS
SINDH BUSINESS FACILITATION CENTER (SBFC), CLIFTON – KARACHI
The Sindh Business Facilitation Center (SBFC) at Clifton is being established as a centralized, modern, citizen-facing facility to support investors, entrepreneurs and businesses through a one-window environment. To meet functional, safety and aesthetic requirements, the existing premises are to be renovated and upgraded through comprehensive Civil, Interior Design (ID), Electrical, and Public Health (PH) works.
The renovation works shall include, but not be limited to, dismantling, civil alterations, flooring & tiling, partitions, ceilings, joinery & built-in furniture base, painting, plumbing fixtures, piping & drainage, and electrical distribution, lighting and low current provisions as detailed in Annexure–A: Renovation & Interior BOQ.
OVERALL OBJECTIVE OF THE ASSIGNMENT
The overall objective of this assignment is to renovate, upgrade and fit-out the SBFC Clifton facility into a fully functional, safe, accessible and modern business facilitation center that:
3. SUB-OBJECTIVES
4. SCOPE OF WORK
The Contractor shall be responsible for end-to-end execution of all works under this assignment, including the following major components (as per Annexure–A: Renovation & Interior BOQ):
4.1 Civil & Structural / Dismantling
4.2 Partitions, Ceilings & Finishes
4.3 Joinery & Built-in Elements
4.4 Public Health (PH) Fixtures & Fittings
4.5 Electrical & Allied Works (LV)
The detailed item-wise description and quantities are given in Annexure–A: Renovation & Interior BOQ, which forms an integral part of this RFQ and the resulting Contract.
5. RISK MANAGEMENT, MONITORING & COORDINATION
6. DELIVERABLES AND TIMELINES
From date of Contract signing
|
Sr. No. |
Deliverable |
Timeline |
|
1 |
Mobilization & Detailed Work Program (including methodology, safety plan, QA/QC plan) |
Within 1 week |
|
2 |
Completion of Dismantling & Civil Alterations (including rough plaster, base screeds) |
Within 4 weeks |
|
3 |
Completion of Partitions, Ceilings, Piping & First Fix Electrical (concealed works) |
Within 8 weeks |
|
4 |
Completion of Flooring, Tiling, Joinery, PH Fixtures & Second Fix Electrical |
Within 10 weeks |
|
5 |
Final Finishes, Testing & Commissioning, Snag Rectification & Handover |
Within 12 weeks |
7. DURATION OF ASSIGNMENT
The total duration of the assignment shall be twelve (12) weeks from the date of Contract signing, subject to site access and approvals. The Contractor shall plan resources to comply with this timeframe.
PRICE SCHEDULE
(To be filled by Bidder – Lump Sum amounts based on Annexure–A BOQ. GST, if applicable, must be shown separately.)
|
S. NO |
DESCRIPTION |
Unit |
Quoted Amount in PKR (Lump Sum) |
|
1 |
Dismantling & Site Preparation Works (as per Annexure–A, Section A) |
Comprehensive Solution |
________ |
|
2 |
Civil Works – Masonry, Plaster, Screeds, Termite Treatment, Waterproofing (Section B) |
________ |
|
|
3 |
Partitions & Cladding – Gypsum, Glass, Plywood, Power Columns (Section C) |
________ |
|
|
4 |
Ceiling Works – Gypsum & Tile Ceilings (Section D) |
________ |
|
|
5 |
Floor Finishes – Porcelain Tiles, Carpet Tiles, Vinyl & Skirting (Sections E & F) |
________ |
|
|
6 |
Marble Works – Steps, Ramps, Countertops, Thresholds (Section F) |
________ |
|
|
7 |
Doors – Glass, PVC, Laminated & Fire Rated (Section G) |
________ |
|
|
8 |
Acoustic Panels & Wall Claddings (Section H) |
________ |
|
|
9 |
Joinery & Built-in Furniture – Tea Points, Printer Cabinets, Filing, Reception, Benches (Section J) |
________ |
|
|
10 |
Graphics, Frosted Films, Blinds, Logo, Frames (Section K) |
________ |
|
|
11 |
Paint & Coatings – All Areas (Section M) |
________ |
|
|
12 |
Fiber Pots, Plants & Misc. Items (Sections N & P) |
________ |
|
|
13 |
PH Fixtures – Sinks, WCs, Vanities, Geysers, Accessories, Hand Dryer (PH BOQ Part-1) |
________ |
|
|
14 |
Water Supply Piping – PPR, Valves & Fittings (PH BOQ Part-2) |
________ |
|
|
15 |
Sewerage & Drainage – uPVC, Floor Drains, Cleanouts, Grease Traps (PH BOQ Part-3) |
________ |
|
|
16 |
Electrical Works – MDB, DBs, Wiring, Lighting, Sockets, Earthing & Provisions for Low-Current |
________ |
Add Taxes (if any):
GRAND TOTAL VALUE INCLUDING ALL TAXES: PKR __________________
UNDERTAKING TO BE SIGNED BY THE BIDDER
We hereby declare that:
(a) All the information and statements made in this Proposal are true and we accept that any misinterpretation or misrepresentation contained in this Proposal may lead to our disqualification by the Client and/or may be sanctioned by the Bank.
(b) This Proposal shall be valid for 30 days from the date of submission.
(c) We have no conflict of interest.
(d) We confirm our understanding of our obligation to abide by the Bank’s policy in regard to corrupt and fraudulent practices.
(e) We undertake to observe the laws against fraud and corruption, including bribery, in force in Pakistan.
(f) Our Proposal is binding upon us and subject to any modifications resulting from the Contract negotiations.
(g) We undertake, if our Proposal is accepted and the Contract is signed, to initiate the Works related to the assignment no later than 10 days from the date of Contract.
(h) We understand that CLICK-SID is not bound to accept any Proposal that CLICK-SID receives.
(i) We have fully understood the required scope of works, specifications, BOQs and other conditions of this RFQ document and the contents of the draft contract.
(j) We confirm that we have the technical competence, relevant experience and management capacity to execute renovation, interior, electrical and PH works with total quality and on time.
Authorized Signature (in full and initials): __________________________
Name and Title of Signatory: ______________________________________
Name of Company: _____________________________________________
Date: ___________________
|
Annexure A - BOQ – Interior, Civil & Joinery Works |
|||||
|
S. No. |
Item / Description (Short) |
Unit |
Qty |
Rate (Rs.) |
Amount (Rs.) |
|
A. DISMANTLING WORKS |
|||||
|
A-00 |
Cutting & dismantling existing RCC slab |
Sft |
149 |
||
|
A-01 |
Dismantling existing block masonry |
Sft |
148 |
||
|
A-04 |
Removal of existing glass partition |
Sft |
49 |
||
|
A-05 |
Dismantling existing tile floor & external steps |
Sft |
5,384 |
||
|
A-07 |
Dismantling existing skirting |
Rft |
690 |
||
|
A-09 |
Removal of old internal paint |
Sft |
7,152 |
||
|
A-10 |
Removal of existing plumbing accessories/fixtures |
Job |
1 |
||
|
A-10 (b) |
Removal of existing electrical works (DBs, lights, ACs, networking) |
Job |
1 |
||
|
B. CIVIL WORKS |
|||||
|
B-01 |
8”×12” H-section MS girder with fabrication & painting |
Rft |
38 |
||
|
B-02 |
4” thick solid block masonry (1000 psi) |
Sft |
1,057 |
||
|
B-03 |
RCC lintel 1:2:4 |
Cft |
12 |
||
|
B-04 |
Steel reinforcement in RCC lintel (G-60) |
Kg |
400 |
||
|
B-05 |
New wall plaster ½”–¾” (1:4) |
Sft |
2,214 |
||
|
B-06 |
Base floor plaster (1:4) |
Sft |
5,382 |
||
|
B-07 |
Sand/scrap filling, compacted |
Cft |
250 |
||
|
B-08 |
PCC 1:2:4 screed (2”–3” thick) |
Cft |
200 |
||
|
B-09 |
Repair plaster for chiseled conduits / wall leveling |
Job |
1 |
||
|
B-010 |
Self-levelling compound (epoxy) |
Sft |
250 |
||
|
B-11 |
Water proofing to toilets & tea point (walls & floor) |
Sft |
776 |
||
|
B-10 |
Termite proofing (under floors/behind cabinets) |
Sft |
2,083 |
||
|
C. PARTITIONS & CLADDING |
|||||
|
C-01 |
100mm gypsum board dry wall partition with insulation |
Sft |
1,019 |
||
|
C-02 |
Single-side gypsum wall cladding |
Sft |
1,189 |
||
|
C-03 |
12mm tempered glass wall partition |
Sft |
350 |
||
|
C-04 |
8mm plywood partition |
Sft |
34 |
||
|
C-05 |
12mm glass partition matching existing |
Sft |
454 |
||
|
C-06 |
Power column (laminated board cladding) |
Sft |
32 |
||
|
C-07 |
Gypsum board drop box for glass partition |
Sft |
175 |
||
|
C-10 |
Gypsum pelmet for roller blinds |
Sft |
132 |
||
|
D. CEILING FINISHES |
|||||
|
D-01 |
Gypsum board false ceiling |
Sft |
530 |
||
|
D-02 |
2’×2’ gypsum board false ceiling (washrooms, electric room, etc.) |
Sft |
594 |
||
|
E. FLOOR FINISHES |
|||||
|
E-01 |
Carpet tiles (office area) |
Sft |
362 |
||
|
E-02 |
Prayer area carpet |
Sft |
84 |
||
|
E-03 |
Anti-static vinyl floor (electrical & IT room) |
Sft |
79 |
||
|
E-04 |
PVC skirting (4” high) |
Rft |
1,317 |
||
|
F. TILE WORKS |
|||||
|
F-01a |
Porcelain floor tile 2’×4’ (main floor) |
Sft |
4,485 |
||
|
F-01b |
Porcelain floor tile 2’×4’ (bath floors) |
Sft |
213 |
||
|
F-01c |
Porcelain wall tile 2’×4’ (bath walls) |
Sft |
1,159 |
||
|
F. MARBLE WORKS |
|||||
|
F-02a |
Pre-polish marble steps & ramp (Ocean Grey) |
Sft |
345 |
||
|
F-02b |
Tea point marble top & splash back |
Sft |
207 |
||
|
F-03 |
Marble thresholds |
Sft |
288 |
||
|
G. DOORS |
|||||
|
G-01 |
12mm tempered glass doors (single/double leaf) |
Sft |
101 |
||
|
G-02 |
PVC doors incl. aluminum frame |
Sft |
109 |
||
|
G-03 |
Laminated doors (ZRK) |
Sft |
117 |
||
|
G-04 |
Fire-rated metal door (2 hr) |
Sft |
24 |
||
|
H. ACOUSTIC & WALL PANELS |
|||||
|
H-01 |
Fabric acoustic wall panels |
Sft |
405 |
||
|
H-02 |
Laminate wall cladding |
Sft |
288 |
||
|
H-03 |
Plywood cladding with polish finish |
Sft |
110 |
||
|
J. JOINERY & BUILT-IN FURNITURE |
|||||
|
J-01a |
Tea point laminate cabinets JD-01 |
Sft |
232 |
||
|
J-01b |
Tea point cabinets JD-01a |
Sft |
73 |
||
|
J-01c |
Tea point cabinets JD-01b |
Sft |
73 |
||
|
J-02 |
Printer area laminate cabinets |
Sft |
225 |
||
|
J-04 |
PVC janitorial closet shelves |
Sft |
132 |
||
|
J-06a |
Cushion bench JD-03 |
Job |
1 |
||
|
J-06b |
Cushion bench JD-04 |
Job |
1 |
||
|
J-06c |
Cushion bench JD-05 |
Job |
1 |
||
|
J-06d |
Cushion bench JD-06 |
Job |
1 |
||
|
J-06e |
Cushion bench JD-08 |
Job |
1 |
||
|
J-05a |
Filing cabinets JD-07 |
Sft |
215 |
||
|
J-05b |
Filing cabinets JD-07a |
Sft |
161 |
||
|
J-05c |
Filing cabinets JD-09 |
Sft |
81 |
||
|
J-08 |
Reception counter (MDF + deco paint + marble top) |
Job |
1 |
||
|
K. FROSTED FILMS, GRAPHICS & BLINDS |
|||||
|
K-01 |
Frosted film on glass (FS-01) |
Sft |
502 |
||
|
K-02 |
Environmental graphics/vinyl (EG-01 & EG-13) |
Sft |
654 |
||
|
K-03 |
Cutout text vinyl (VTX-01) |
Sft |
100 |
||
|
K-04 |
3D acrylic logo |
Job |
1 |
||
|
K-06 |
Picture frames 2’×3’ incl. graphics |
No |
2 |
||
|
K-07 |
Roller blinds (perforated) |
Sft |
676 |
||
|
M. PAINT FINISHES |
|||||
|
M-01a |
Paint PT-01 (Natural White) |
Sft |
16,925 |
||
|
M-01b |
Paint PT-02 (Grey Fur) |
Sft |
750 |
||
|
M-01c |
Paint PT-03 (Moody Forest) |
Sft |
625 |
||
|
M-01d |
Paint PT-04 (Blue Heaven) |
Sft |
450 |
||
|
M-01e |
Paint PT-05 (Tile Red) |
Sft |
275 |
||
|
M-01f |
Paint PT-05 (Black) |
Sft |
350 |
||
|
M-01g |
Enamel spray paint |
Sft |
250 |
||
|
N. FIBER GLASS POTS & PLANTS |
|||||
|
N-01 |
Fiber glass pots 24” dia (Type PO-01) |
No |
20 |
||
|
N-02 |
Fiber glass pots 24” dia (Type PO-02) |
No |
5 |
||
|
N-03 |
Plants 5–6 ft height incl. filling & marble crush |
No |
25 |
||
|
P. MISC ITEMS |
|||||
|
P-01 |
Repairing of aluminum windows/ventilators |
Sft |
425 |
||
|
P-02 |
SS railing with mesh infill |
Rft |
20 |
||
|
A.3 – Public Health Fixtures |
||||||
|
Sr. |
Description |
Unit |
Qty |
Material Rate (PKR) |
Install Rate (PKR) |
Amount (PKR) |
|
1.01 |
SS Tea Point Sink – single bowl with drainboard, mixer, valves, traps, fittings & accessories |
Nos |
4 |
|||
|
1.02 |
Sink Mixer 15mm |
Nos |
4 |
|||
|
1.03 |
Soap Dispenser (Tea Points) |
Nos |
4 |
|||
|
1.04 |
Tissue Paper Dispenser |
Nos |
4 |
|||
|
1.05 |
Electric Geyser 6 Litre |
Nos |
5 |
|||
|
1.06 |
Main Sewer Connection to Landlord Sewer |
Job |
1 |
|||
|
1.07 |
European WC – wall-mounted with concealed cistern & flush plate, P/S trap & fittings |
Nos |
7 |
|||
|
1.08 |
Vanity Wash Basin incl. RCC slab & 20mm marble top, fittings & traps |
Nos |
5 |
|||
|
1.09 |
Muslim Shower with double bib cock |
Nos |
7 |
|||
|
1.1 |
Wash Basin Mixer 15mm |
Nos |
5 |
|||
|
1.11 |
Soap Dispenser (Toilets) |
Nos |
5 |
|||
|
1.12 |
Toilet Paper Holder |
Nos |
7 |
|||
|
1.13 |
Towel Bar / Rail ¾” |
Nos |
5 |
|||
|
1.14 |
Imported Beveled Mirrors 5mm with backing |
Sft |
80 |
|||
|
1.15 |
Sewer/Waste Piping Connection in Duct |
Job |
1 |
– |
||
|
1.16 |
Electric Hand Dryer |
Job |
1 |
– |
||
|
Sr |
Part-2: WATER SUPPLY |
Unit |
Qty. |
Rate (Rs.) |
Installation (Rs.) |
|
2.1 |
Providing, fixing, jointing and testing Polypropylene Random (PPR) pipes, DADEX or approved equivalent, pressure pipe for cold/hot water as per DIN 8077-8078,PN-20 for pipes and DIN 16962,PN-25 for fittings (polyfusion welded joints) inside building including fittings and specials (sockets, tees, elbows, bends, crosses, reducers, adaptor, plugs and union etc.) supported on walls or suspended from roof slab or run in chases including pipe hangers, supports, cutting and making good the chases and holes, complete in all respects. |
||||
|
25mm dia |
Rft |
210 |
|||
|
32mm dia |
Rft |
180 |
|||
|
40mm dia |
Rft |
100 |
|||
|
50 mm dia |
Rft |
100 |
|||
|
2.2 |
Providing and installing ball valves of following nominal dia, DADEX/SCON/KITZ make or approved Equaivalent, including jointing, fitting, painting, testing, complete in all respects to match with PPR and PE pipes of following diameters. |
||||
|
32 mm |
Nos. |
6 |
|||
|
Part-3: SEWERAGE & DRAINAGE |
|||||
|
3.1 |
Providing, laying, fixing and testing uPVC soil, waste, vent and rain water as per ISO 3633:1991 or equivalent BS specifications including uPVC fittings with solvent cement jointing or rubber ring joints,DADEX Or Approved Equivalent make as approved by the Engineer complete in all respects, including clamps, bends, tees, Y-tees, cowls, reducers, sleeves, clean out, waterproof sleeves, roof drain, etc., embedded in floors and walls, clamped to walls, suspended from slab (common hanger shall be used for pipe hanging and fiber glass tray under pipes), painted MS horizontal and vertical pipe hangers of approved design making requisite no. of holes and making good the same complete in all respect as per specifications and drawings. |
||||
|
2" i.d |
Rft |
60 |
|||
|
3" i.d |
Rft |
185 |
|||
|
4" i.d |
Rft |
325 |
|||
|
3.2 |
Providing, laying, fixing and testing floor drain (multifloor trap) uPVC including extension grating and stainless steel cover grating , P-trap best quality local make Porta or Approved Equivalent as approved Engineer, complete in all respect as per specifications and drawings. |
Nos. |
19 |
||
|
3.3 |
Providing and fixing clean out with threads ferule fixed in pipe with the help of solvent, as shown on drawing, complete in all respects as per specifications and drawings. |
||||
|
3" i.d |
Nos. |
2 |